Items where Year is 2006
Article
Abbott, C; Jeong, K and Allen, S (2006) The economic motivation for innovation in small construction companies. Construction Innovation, 6(3), pp. 187-196. ISSN 1471-4175
Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364
Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 09699988
Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193
Agbulos, A; Mohamed, Y; Al-Hussein, M; Abourizk, S and Roesch, J (2006) Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. Journal of Construction Engineering and Management, 132(3), pp. 291-299. ISSN 0733-9364
Ahmed, V; Shaik, A and Aouad, G (2006) An ontology of construction education for e-learning via the semantic web. Architectural Engineering and Design Management, 2(1-2), pp. 87-99. ISSN 1745-2007
Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193
Aibinu, A A and Odeyinka, H A (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667-677. ISSN 0733-9364
Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364
Al-Ghassani, A M; Kamara, J M; Anumba, C J and Carrillo, P M (2006) Prototype system for knowledge problem definition. Journal of Construction Engineering and Management, 132(5), pp. 516-524. ISSN 0733-9364
Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 09699988
Allan, S; Jones, K and Walker, S (2006) Retrofitting e-learning to an existing distance learning course: A case study. Architectural Engineering and Design Management, 2(1-2), pp. 137-147. ISSN 1745-2007
Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), pp. 69-80. ISSN 01446193
Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 09699988
Arboleda, C A and Abraham, D M (2006) Evaluation of flexibility in capital investments of infrastructure systems. Engineering, Construction and Architectural Management, 13(3), pp. 254-274. ISSN 09699988
Asfour, O S and Gadi, M B (2006) Effect of integrating wind catchers with curved roofs on natural ventilation performance in buildings. Architectural Engineering and Design Management, 2(4), pp. 289-304. ISSN 1745-2007
Bai, Y and Burkett, W R (2006) Rapid bridge replacement: Processes, techniques, and needs for improvements. Journal of Construction Engineering and Management, 132(11), pp. 1139-1147. ISSN 0733-9364
Bai, Y; Burkett, W R and Nash, P T (2006) Lessons learned from an emergency bridge replacement project. Journal of Construction Engineering and Management, 132(4), pp. 338-344. ISSN 0733-9364
Baradan, S and Usmen, M A (2006) Comparative injury and fatality risk analysis of building trades. Journal of Construction Engineering and Management, 132(5), pp. 533-539. ISSN 0733-9364
Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 09699988
Bayraktar, M E; Cui, Q; Hastak, M and Minkarah, I (2006) Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, 132(4), pp. 333-337. ISSN 0733-9364
Beavers, J E; Moore, J R; Rinehart, R and Schriver, W R (2006) Crane-related fatalities in the construction industry. Journal of Construction Engineering and Management, 132(9), pp. 901-910. ISSN 0733-9364
Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364
Best, R and Langston, C (2006) Evaluation of construction contractor performance: A critical analysis of some recent research. Construction Management and Economics, 24(4), pp. 439-445. ISSN 01446193
Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 09699988
Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193
Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(1), pp. 82-95. ISSN 09699988
Bogus, S M; Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(8), pp. 829-837. ISSN 1466433X
Boyd, D (2006) Developing a knowledge centric approach to construction education. Architectural Engineering and Design Management, 2(1-2), pp. 149-159. ISSN 1745-2007
Bridge, A J and Tisdell, C (2006) The determinants of the vertical boundaries of the construction firm: Response. Construction Management and Economics, 24(3), pp. 233-236. ISSN 01446193
Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364
Briscoe, G (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), pp. 220-229. ISSN 0961-3218
Burroughs, S (2006) Strength of compacted earth: Linking soil properties to stabilizers. Building Research & Information, 34(1), pp. 55-65. ISSN 0961-3218
Buys, F and Nkado, R (2006) A survey of maintenance management systems in South African tertiary educational institutions. Construction Management and Economics, 24(10), pp. 997-1005. ISSN 1466433X
Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364
Carmichael, S and Murray, M (2006) Record keeping for contemporaneous delay analysis: A model for effective event management. Construction Management and Economics, 24(10), pp. 1007-1018. ISSN 1466433X
Carrillo, P M; Robinson, H S; Anumba, C J and Bouchlaghem, N M (2006) A knowledge transfer framework: The PFI context. Construction Management and Economics, 24(10), pp. 1045-1056. ISSN 1466433X
Carter, G and Smith, S D (2006) Safety hazard identification on construction projects. Journal of Construction Engineering and Management, 132(2), pp. 197-205. ISSN 0733-9364
Caven, V (2006) Career building: Women and non-standard employment in architecture. Construction Management and Economics, 24(5), pp. 457-464. ISSN 1466433X
Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364
Chang, A S and Tien, C C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(2), pp. 171-184. ISSN 01446193
Chang, C Y (2006) The determinants of the vertical boundaries of the construction firm: Comment. Construction Management and Economics, 24(3), pp. 229-232. ISSN 01446193
Chang, C Y; Chou, H Y and Wang, M T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(6), pp. 647-656. ISSN 1466433X
Cheah, C Y J; Chew, D A S and Huang, J (2006) Marketing foreign interior design services in China. Building Research & Information, 34(6), pp. 584-595. ISSN 0961-3218
Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X
Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X
Cheng, E W L and Li, H (2006) Job performance evaluation for construction companies: An analytic network process approach. Journal of Construction Engineering and Management, 132(8), pp. 827-835. ISSN 0733-9364
Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 09699988
Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193
Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364
Chinyio, E and Morton, N (2006) The effectiveness of e-learning. Architectural Engineering and Design Management, 2(1-2), pp. 73-86. ISSN 1745-2007
Chua, D K H and Godinot, M (2006) Use of a WBS matrix to improve interface management in projects. Journal of Construction Engineering and Management, 132(1), pp. 67-79. ISSN 0733-9364
Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364
Clarke, L (2006) Valuing labour. Building Research & Information, 34(3), pp. 246-256. ISSN 0961-3218
Cleveland, T G and Fashokun, A (2006) Construction-associated solids loads with a temporary sediment control bmp. Journal of Construction Engineering and Management, 132(10), pp. 1122-1125. ISSN 0733-9364
Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364
Cole, R (2006) Shared markets: Coexisting building environmental assessment methods. Building Research & Information, 34(4), pp. 357-371. ISSN 0961-3218
Consoli, G (2006) The architect's dilemma: A self reflection in understanding prison design and construction in private prison projects. Construction Economics and Building, 6(2), pp. 1-10. ISSN 2204-9029
Costantino, N (2006) The contribution of Ranko Bon to the debate on sustainable construction. Construction Management and Economics, 24(7), pp. 705-709. ISSN 1466433X
Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364
Cox, R F; Issa, R R A and Frey, A (2006) Proposed subcontractor-based employee motivational model. Journal of Construction Engineering and Management, 132(2), pp. 152-163. ISSN 0733-9364
Crawford, P and Vogl, B (2006) Measuring productivity in the construction industry. Building Research & Information, 34(3), pp. 208-219. ISSN 0961-3218
Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364
Dammann, S and Elle, M (2006) Environmental indicators: Establishing a common language for green building. Building Research & Information, 34(4), pp. 387-404. ISSN 0961-3218
Damodaran, L and Shelbourn, M (2006) Collaborative working: the elusive vision. Architectural Engineering and Design Management, 2(4), pp. 227-243. ISSN 1745-2007
Dann, N; Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(1), pp. 97-104. ISSN 01446193
Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218
Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193
De La Cruz, M P; Del Caño, A and De La Cruz, E (2006) Downside risks in construction projects developed by the civil service: The case of Spain. Journal of Construction Engineering and Management, 132(8), pp. 844-852. ISSN 0733-9364
Desta, S; Root, D and Diederichs, C J (2006) The practice of project management office (PMO) concept within the German architect, engineer, contractor (AEC) sector. Journal of Engineering, Design and Technology, 4(1), pp. 46-59. ISSN 1726-0531
Dietzenbacher, E and Hoen, A (2006) Coefficient stability and predictability in input-output models: A comparative analysis for the Netherlands. Construction Management and Economics, 24(7), pp. 671-680. ISSN 1466433X
Dorji, K and Hadikusumo, B H W (2006) Safety management practices in the Bhutanese construction industry. Journal of Construction in Developing Countries, 11(2), pp. 53-75. ISSN 1823-6499
Dowdle, D L (2006) Engaging learners: The development of effective e-learning applications for students of the built environment. Architectural Engineering and Design Management, 2(1-2), pp. 31-48. ISSN 1745-2007
Doǧan, S Z; Arditi, D and Murat Günaydin, H (2006) Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management, 132(10), pp. 1092-1098. ISSN 0733-9364
Drejer, I and Vinding, A L (2006) Organisation, 'anchoring' of knowledge, and innovative activity in construction. Construction Management and Economics, 24(9), pp. 921-931. ISSN 1466433X
Drew, D S and Skitmore, M (2006) Testing Vickery's revenue equivalence theory in construction auctions. Journal of Construction Engineering and Management, 132(4), pp. 425-428. ISSN 0733-9364
Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175
Dulaimi, M and Hartmann, A (2006) The role of organizational culture in motivating innovative behaviour in construction firms. Construction Innovation, 6(3), pp. 159-172. ISSN 1471-4175
Dulaimi, M; Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(3), pp. 143-157. ISSN 1471-4175
Dulaimi, M; Stewart, I and Fenn, P (2006) Strategy: The motivation for innovation. Construction Innovation, 6(3), pp. 173-185. ISSN 1471-4175
Duncan, K; Philips, P and Prus, M (2006) Prevailing wage legislation and public school construction efficiency: A stochastic frontier approach. Construction Management and Economics, 24(6), pp. 625-634. ISSN 1466433X
Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364
East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364
Eaton, D; Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(2), pp. 63-67. ISSN 1471-4175
Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: A perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(1), pp. 21-32. ISSN 1366-4387
Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: Results of a field study. Construction Management and Economics, 24(2), pp. 209-217. ISSN 01446193
Eeing, B T and Kruse, J B (2006) Valuing self-protection: Income and certification effects for safe rooms. Construction Management and Economics, 24(10), pp. 1057-1068. ISSN 1466433X
El Wardani, M A; Messner, J I and Horman, M J (2006) Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230-238. ISSN 0733-9364
El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: Supporting semantic exchange of project risk information. Construction Management and Economics, 24(3), pp. 271-285. ISSN 01446193
El-Diraby, T E (2006) Web-services environment for collaborative management of product life-cycle costs. Journal of Construction Engineering and Management, 132(3), pp. 300-313. ISSN 0733-9364
El-Mashaleh, M; O'Brien, W J and Minchin Jr, R E (2006) Firm performance and information technology utilization in the construction industry. Journal of Construction Engineering and Management, 132(5), pp. 499-507. ISSN 0733-9364
Elazouni, A M (2006) Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132(12), pp. 1242-1253. ISSN 0733-9364
Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364
Elmisalami, T; Walters, R and Jaselskis, E J (2006) Construction IT decision making using multiattribute utility theory for use in a laboratory information management system. Journal of Construction Engineering and Management, 132(12), pp. 1275-1283. ISSN 0733-9364
Emmitt, S (2006) Investigating the synergy between teaching and research in a teaching-led university: The case of an architectural technology undergraduate programme. Architectural Engineering and Design Management, 2(1-2), pp. 61-72. ISSN 1745-2007
Emmitt, S (2006) Selection and specification of building products: Implications for design managers. Architectural Engineering and Design Management, 2(3), pp. 176-186. ISSN 1745-2007
English, J; Haupt, T C and Smallwood, J J (2006) Women, construction and health and safety (H&S): South African and Tanzanian perspectives. Journal of Engineering, Design and Technology, 4(1), pp. 18-28. ISSN 1726-0531
Enshassi, A; Al-Hallaq, K and Mohamed, S (2006) Causes of contractor's business failure in developing countries: The case of Palestine. Journal of Construction in Developing Countries, 11(2), pp. 1-14. ISSN 1823-6499
Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364
Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364
Fang, D; Chen, Y and Wong, L (2006) Safety climate in construction industry: A case study in Hong Kong. Journal of Construction Engineering and Management, 132(6), pp. 573-584. ISSN 0733-9364
Faridi, A S and El-Sayegh, S M (2006) Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), pp. 1167-1176. ISSN 1466433X
Fergusson, H and Langford, D A (2006) Strategies for managing environmental issues in construction organizations. Engineering, Construction and Architectural Management, 13(2), pp. 171-185. ISSN 09699988
Fernie, S; Leiringer, R and Thorpe, T (2006) Change in construction: A critical perspective. Building Research & Information, 34(2), pp. 91-103. ISSN 0961-3218
Fikri Mohamed, S and Anumba, C J (2006) Potential for improving site management practices through knowledge management. Construction Innovation, 6(4), pp. 232-249. ISSN 1471-4175
Finne, C (2006) Publishing building product information: A value net perspective. Construction Innovation, 6(2), pp. 79-96. ISSN 1471-4175
Fong, P S W and Chu, L (2006) Exploratory study of knowledge sharing in contracting companies: A sociotechnical perspective. Journal of Construction Engineering and Management, 132(9), pp. 928-939. ISSN 0733-9364
Ford, D N and Bhargav, S (2006) Project management quality and the value of flexible strategies. Engineering, Construction and Architectural Management, 13(3), pp. 275-289. ISSN 09699988
Formoso, C T and Jobim, M S S (2006) Challenges in improving customer focus in small-sized house-building companies in Brazil. Journal of Construction in Developing Countries, 11(2), pp. 77-101. ISSN 1823-6499
Forsythe, P (2006) Consumer-perceived appearance tolerances in construction quality management. Engineering, Construction and Architectural Management, 13(3), pp. 307-318. ISSN 09699988
Fu, W K; Lo, H P and Drew, D S (2006) Collective learning, collective knowledge and learning networks in construction. Construction Management and Economics, 24(10), pp. 1019-1028. ISSN 1466433X
Galloway, P D (2006) Comparative study of university courses on critical-path method scheduling. Journal of Construction Engineering and Management, 132(7), pp. 712-722. ISSN 0733-9364
Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364
Ganesan, S and Kelsey, J (2006) Technology transfer: International collaboration in Sri Lanka. Construction Management and Economics, 24(7), pp. 743-753. ISSN 1466433X
Gao, Z; Walters, R C; Jaselskis, E J and Wipf, T J (2006) Approaches to improving the quality of construction drawings from owner's perspective. Journal of Construction Engineering and Management, 132(11), pp. 1187-1192. ISSN 0733-9364
Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364
Gething, B and Bordass, B (2006) Rapid assessment checklist for sustainable buildings. Building Research & Information, 34(4), pp. 416-426. ISSN 0961-3218
Gillott, M; Holland, R; Riffat, S and Fitchett, J A (2006) Post-occupancy evaluation of space use in a dwelling using RFID tracking. Architectural Engineering and Design Management, 2(4), pp. 273-288. ISSN 1745-2007
Givoni, B; Khedari, J; Wong, N H; Feriadi, H and Noguchi, M (2006) Thermal sensation responses in hot, humid climates: Effects of humidity. Building Research & Information, 34(5), pp. 496-506. ISSN 0961-3218
Gluch, P and Stenberg, A C (2006) How do trade media influence green building practice? Building Research & Information, 34(2), pp. 104-117. ISSN 0961-3218
Gormley, M and Campbell, D P (2006) Modelling water reduction effects: Method and implications for horizontal drainage. Building Research & Information, 34(2), pp. 131-144. ISSN 0961-3218
Gribble, S J; Scott, D; Mawdesley, M and Al-Jibouri, S (2006) Learning to be real engineers: The dam game simulation. Architectural Engineering and Design Management, 2(1-2), pp. 101-114. ISSN 1745-2007
Grimsrud, D; Bridges, B and Schulte, R (2006) Continuous measurements of air quality parameters in schools. Building Research & Information, 34(5), pp. 447-458. ISSN 0961-3218
Grisham, T and Walker, D H T (2006) Nurturing a knowledge environment for international construction organizations through communities of practice. Construction Innovation, 6(4), pp. 217-231. ISSN 1471-4175
Grosskopf, K R and Kibert, C J (2006) Economic incentive framework for sustainable energy use in us residential construction. Construction Management and Economics, 24(8), pp. 839-846. ISSN 1466433X
Haldenwang, R; Slatter, P and Pearce, C (2006) Integration of project management skills to manage a fourth year research project. Journal of Engineering, Design and Technology, 4(1), pp. 60-70. ISSN 1726-0531
Hardie, M; Miller, G; Manley, K and McFallan, S (2006) Innovation performance and its impact on profitability among different sectors in the Australian construction industry. Construction Economics and Building, 6(1), pp. 1-11. ISSN 2204-9029
Hare, B; Cameron, I and Roy Duff, A (2006) Exploring the integration of health and safety with pre-construction planning. Engineering, Construction and Architectural Management, 13(5), pp. 438-450. ISSN 09699988
Hartmann, A (2006) The context of innovation management in construction firms. Construction Management and Economics, 24(6), pp. 567-578. ISSN 1466433X
Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1: a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(5), pp. 463-480. ISSN 09699988
Hassanein, A A G and Khalil, B N L (2006) Developing general indicator cost indices for the Egyptian construction industry. Journal of Financial Management of Property and Construction, 11(3), pp. 181-194. ISSN 1366-4387
Hawk, D (2006) Conditions of success: A platform for international construction development. Construction Management and Economics, 24(7), pp. 735-742. ISSN 1466433X
Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364
Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364
Hinze, J; Devenport, J N and Giang, G (2006) Analysis of construction worker injuries that do not result in lost time. Journal of Construction Engineering and Management, 132(3), pp. 321-326. ISSN 0733-9364
Ho, S P (2006) Model for financial renegotiation in public-private partnership projects and its policy implications: Game theoretic view. Journal of Construction Engineering and Management, 132(7), pp. 678-688. ISSN 0733-9364
Horman, M J; Orosz, M P and Riley, D R (2006) Sequence planning for electrical construction. Journal of Construction Engineering and Management, 132(4), pp. 363-372. ISSN 0733-9364
Hoxley, M and Rowsell, R (2006) Using video in the construction technology classroom: Encouraging active learning. Architectural Engineering and Design Management, 2(1-2), pp. 115-122. ISSN 1745-2007
Hsieh, H Y and Forster, J (2006) Residential construction quality and production levels in Taiwan. Engineering, Construction and Architectural Management, 13(5), pp. 502-520. ISSN 09699988
Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X
Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364
Huang, X and Hinze, J (2006) Owner's role in construction safety. Journal of Construction Engineering and Management, 132(2), pp. 164-173. ISSN 0733-9364
Huang, X and Hinze, J (2006) Owner's role in construction safety: Guidance model. Journal of Construction Engineering and Management, 132(2), pp. 174-181. ISSN 0733-9364
Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(1), pp. 5-18. ISSN 01446193
Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193
Hui, E C M (2006) Intra-urban residential mobility and property markets: Theory and evidence. Journal of Financial Management of Property and Construction, 11(2), pp. 117-130. ISSN 1366-4387
Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X
Hyari, K and El-Rayes, K (2006) Lighting requirements for nighttime highway construction. Journal of Construction Engineering and Management, 132(5), pp. 435-443. ISSN 0733-9364
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387
Igo, T and Skitmore, M (2006) Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework. Construction Innovation, 6(2), pp. 121-139. ISSN 1471-4175
Ilozor, B D and Ilozor, D B (2006) Open-planning concepts and effective facilities management of commercial buildings. Engineering, Construction and Architectural Management, 13(4), pp. 396-412. ISSN 09699988
Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(5), pp. 521-535. ISSN 09699988
Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218
Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364
Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364
Jefferies, M (2006) Critical success factors of public private sector partnerships: A case study of the sydney superdome. Engineering, Construction and Architectural Management, 13(5), pp. 451-462. ISSN 09699988
Jeong, K S; Kagioglou, M; Haigh, R; Amaratunga, D and Siriwardena, M L (2006) Embedding good practice sharing within process improvement. Engineering, Construction and Architectural Management, 13(1), pp. 62-81. ISSN 09699988
Jha, K N and Iyer, C K (2006) What attributes should a project coordinator possess? Construction Management and Economics, 24(9), pp. 977-988. ISSN 1466433X
Ji, X L; Lou, W Z; Dai, Z Z; Wang, B G and Liu, S Y (2006) Predicting thermal comfort in Shanghai's non-air-conditioned buildings. Building Research & Information, 34(5), pp. 507-514. ISSN 0961-3218
Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), pp. 1305-1314. ISSN 1466433X
Johnson, C; Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(4), pp. 367-378. ISSN 01446193
Johnsson, H; Janols, H and Stehn, L (2006) 3D computer visualization in timber construction: some important parameters. Architectural Engineering and Design Management, 2(3), pp. 161-175. ISSN 1745-2007
Kaatz, E; Root, D S; Bowen, P A and Hill, R C (2006) Advancing key outcomes of sustainability building assessment. Building Research & Information, 34(4), pp. 308-320. ISSN 0961-3218
Kaiser, M J (2006) Offshore decommissioning cost estimation in the gulf of Mexico. Journal of Construction Engineering and Management, 132(3), pp. 249-258. ISSN 0733-9364
Kaiser, M J and Lledare, W O (2006) The gulf of Mexico decommissioning market. Journal of Construction Engineering and Management, 132(8), pp. 815-826. ISSN 0733-9364
Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X
Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364
Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 09699988
Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364
Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(6), pp. 634-644. ISSN 09699988
Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387
Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364
Kim, H J and Reinschmidt, K F (2006) A dynamic competition model for construction contractors. Construction Management and Economics, 24(9), pp. 955-965. ISSN 1466433X
Kohler, N (2006) A European perspective on the Pearce report; policy and research. Building Research & Information, 34(3), pp. 287-294. ISSN 0961-3218
Kolera, B T and Bernold, L E (2006) Intelligent utility locating tool for excavators. Journal of Construction Engineering and Management, 132(9), pp. 919-927. ISSN 0733-9364
Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029
Koskela, L and Ballard, G (2006) Should project management be based on theories of economics or production? Building Research & Information, 34(2), pp. 154-163. ISSN 0961-3218
Kumaraswamy, M M (2006) Accelerating construction industry development. Journal of Construction in Developing Countries, 11(1), pp. 73-94. ISSN 1823-6499
Kumaraswamy, M M; Miller, C J; Rahman, M M; Pickernell, D G; Ng, S T and Wong, I P Y (2006) Developing web-based tools for teaching, training, learning and development: The role of academic institutions. Architectural Engineering and Design Management, 2(1-2), pp. 123-135. ISSN 1745-2007
Lai, C M and Chiang, C M (2006) How phase change materials affect thermal performance: Hollow bricks. Building Research & Information, 34(2), pp. 118-130. ISSN 0961-3218
Lapinski, A R; Horman, M J and Riley, D R (2006) Lean processes for sustainable project delivery. Journal of Construction Engineering and Management, 132(10), pp. 1083-1091. ISSN 0733-9364
Larsson, B; Sundqvist, J and Emmitt, S (2006) Component manufacturers' perceptions of managing innovation. Building Research & Information, 34(6), pp. 552-564. ISSN 0961-3218
Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364
Lee, D E and Arditi, D (2006) Total quality performance of design/build firms using quality function deployment. Journal of Construction Engineering and Management, 132(1), pp. 49-57. ISSN 0733-9364
Lee, D E and Shi, J J (2006) Construction business automation system. Journal of Construction Engineering and Management, 132(1), pp. 88-96. ISSN 0733-9364
Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364
Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364
Leiringer, R (2006) Technological innovation in PPPs: Incentives, opportunities and actions. Construction Management and Economics, 24(3), pp. 301-308. ISSN 01446193
Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(2), pp. 149-158. ISSN 01446193
Leung, M Y; Liu, A M M and Wong, M M K (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(1), pp. 55-67. ISSN 01446193
Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(8), pp. 805-815. ISSN 1466433X
Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364
Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 09699988
Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X
Ling, F Y Y; Ibbs, C W and Hoo, W Y (2006) Determinants of international architectural, engineering, and construction firms' project success in China. Journal of Construction Engineering and Management, 132(2), pp. 206-214. ISSN 0733-9364
Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals? Construction Management and Economics, 24(2), pp. 185-196. ISSN 01446193
Lisø, K R (2006) Integrated approach to risk management of future climate change impacts. Building Research & Information, 34(1), pp. 1-10. ISSN 0961-3218
Lisø, K R; Hygen, H O; Kvande, T and Thue, J V (2006) Decay potential in wood structures using climate data. Building Research & Information, 34(6), pp. 546-551. ISSN 0961-3218
Liu, A M M and Fang, Z (2006) A power-based leadership approach to project management. Construction Management and Economics, 24(5), pp. 497-507. ISSN 1466433X
Liu, A M M; Shuibo, Z and Meiyung, L (2006) A framework for assessing organisational culture of Chinese construction enterprises. Engineering, Construction and Architectural Management, 13(4), pp. 327-342. ISSN 09699988
Liu, Y; Prasad, D; Li, J; Fu, Y and Liu, J (2006) Developing regionally specific environmental building tools for China. Building Research & Information, 34(4), pp. 372-386. ISSN 0961-3218
Lo, T Y; Fung, I W H and Tung, K C F (2006) Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6), pp. 636-649. ISSN 0733-9364
Lobo, Y and Wilkinson, S (2006) The effects of occupational licensing on skills needs in the building industry: Evidence from New Zealand. Construction Economics and Building, 6(2), pp. 55-63. ISSN 2204-9029
Lowe, D J (2006) Supervised work experience: The learning climate of construction companies and the factors that influence student experience. Architectural Engineering and Design Management, 2(1-2), pp. 49-60. ISSN 1745-2007
Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364
Lowe, D J; Emsley, M W and Harding, A (2006) Relationships between total construction cost and project strategic, site related and building definition variable. Journal of Financial Management of Property and Construction, 11(3), pp. 165-180. ISSN 1366-4387
Lowe, R (2006) Defining absolute environmental limits for the built environment. Building Research & Information, 34(4), pp. 405-415. ISSN 0961-3218
Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364
Lu, S L and Sexton, M (2006) Innovation in small construction knowledge-intensive professional service firms: A case study of an architectural practice. Construction Management and Economics, 24(12), pp. 1269-1282. ISSN 1466433X
Lucko, G; Anderson-Cook, C M and Vorster, M C (2006) Statistical considerations for predicting residual value of heavy equipment. Journal of Construction Engineering and Management, 132(7), pp. 723-732. ISSN 0733-9364
Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(2), pp. 32-43. ISSN 2204-9029
Lützkendorf, T and Lorenz, D (2006) Using an integrated performance approach in building assessment tools. Building Research & Information, 34(4), pp. 334-356. ISSN 0961-3218
Lœdre, O; Austeng, K; Haugen, T I and Klakegg, O J (2006) Procurement routes in public building and construction projects. Journal of Construction Engineering and Management, 132(7), pp. 689-696. ISSN 0733-9364
Macmillan, S (2006) Added value of good design. Building Research & Information, 34(3), pp. 257-271. ISSN 0961-3218
Mahdi, I M; Al-Reshaid, K and Fereig, S M (2006) Optimum house delivery decision model from the government's and recipients' point-of-view. Engineering, Construction and Architectural Management, 13(4), pp. 413-430. ISSN 09699988
Maheswari, J U; Varghese, K and Sridharan, T (2006) Application of dependency structure matrix for activity sequencing in concurrent engineering projects. Journal of Construction Engineering and Management, 132(5), pp. 482-490. ISSN 0733-9364
Majdalani, Z; Ajam, M and Mezher, T (2006) Sustainability in the construction industry: A Lebanese case study. Construction Innovation, 6(1), pp. 33-46. ISSN 1471-4175
Malmqvist, T and Glaumann, M (2006) Selecting problem-related environmental indicators for housing management. Building Research & Information, 34(4), pp. 321-333. ISSN 0961-3218
Manley, K (2006) The innovation competence of repeat public sector clients in the Australian construction industry. Construction Management and Economics, 24(12), pp. 1295-1304. ISSN 1466433X
Manley, K and McFallan, S (2006) Exploring the drivers of firm-level innovation in the construction industry. Construction Management and Economics, 24(9), pp. 911-920. ISSN 1466433X
Manoliadis, O; Tsolas, I and Nakou, A (2006) Sustainable construction and drivers of change in Greece: A Delphi study. Construction Management and Economics, 24(2), pp. 113-120. ISSN 01446193
Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: Effective participations? Engineering, Construction and Architectural Management, 13(4), pp. 343-363. ISSN 09699988
Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175
Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175
Mattar, M H and Cheah, C Y J (2006) Valuing large engineering projects under uncertainty: Private risk effects and real options. Construction Management and Economics, 24(8), pp. 847-860. ISSN 1466433X
Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(1), pp. 31-44. ISSN 01446193
McCann, P (2006) On the supply-side determinants of regional growth. Construction Management and Economics, 24(7), pp. 681-693. ISSN 1466433X
McDermott, P and Khalfan, M M A (2006) Achieving supply chain integration within construction industry. Construction Economics and Building, 6(2), pp. 44-54. ISSN 2204-9029
Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387
Menches, C L and Hanna, A S (2006) Conceptual planning process for electrical construction. Journal of Construction Engineering and Management, 132(12), pp. 1306-1313. ISSN 0733-9364
Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364
Moschandreas, D J; Yoon, S H and Demirev, D (2006) Validation of the indoor environmental quality conceptual model. Building Research & Information, 34(5), pp. 483-495. ISSN 0961-3218
Moussa, M; Ruwanpura, J and Jergeas, G (2006) Decision tree modeling using integrated multilevel stochastic networks. Journal of Construction Engineering and Management, 132(12), pp. 1254-1266. ISSN 0733-9364
Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364
Muya, M; Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: A case study of Zambia. Construction Management and Economics, 24(2), pp. 197-208. ISSN 01446193
Na, L J; Ofori, G and Park, M (2006) Stimulating construction innovation in Singapore through the national system of innovation. Journal of Construction Engineering and Management, 132(10), pp. 1069-1082. ISSN 0733-9364
Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364
Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X
Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X
Navon, R and Kolton, O (2006) Model for automated monitoring of fall hazards in building construction. Journal of Construction Engineering and Management, 132(7), pp. 733-740. ISSN 0733-9364
Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(4), pp. 380-395. ISSN 09699988
Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364
Nesan, L J (2006) Project finance model for small contractors in USA. Construction Economics and Building, 6(1), pp. 25-41. ISSN 2204-9029
Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 09699988
Nitithamyong, P and Skibniewski, M J (2006) Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), pp. 80-87. ISSN 0733-9364
Nuntasunti, S and Bernold, L E (2006) Experimental assessment of wireless construction technologies. Journal of Construction Engineering and Management, 132(9), pp. 1009-1018. ISSN 0733-9364
O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364
Oei, F J and Ogunlana, S O (2006) Assessment of the development role of a statutory body from a customer perspective: A relationship marketing approach. Journal of Construction in Developing Countries, 11(2), pp. 31-52. ISSN 1823-6499
Ofori, G (2006) Revaluing construction in developing countries: A research agenda. Journal of Construction in Developing Countries, 11(1), pp. 1-16. ISSN 1823-6499
Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387
Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193
Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X
Oloke, D; Edwards, D J; Wright, B and Love, P E D (2006) A web-based information management system for predicting the breakdown of off-highway plant. Journal of Engineering, Design and Technology, 4(1), pp. 29-45. ISSN 1726-0531
Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 09699988
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 09699988
Oyetunji, A A and Anderson, S D (2006) Relative effectiveness of project delivery and contract strategies. Journal of Construction Engineering and Management, 132(1), pp. 3-13. ISSN 0733-9364
Ozorhon, B; Dikmen, I and Birgonul, M T (2006) Case-based reasoning model for international market selection. Journal of Construction Engineering and Management, 132(9), pp. 940-948. ISSN 0733-9364
Pan, N F (2006) Evaluation of building performance using fuzzy FTA. Construction Management and Economics, 24(12), pp. 1241-1252. ISSN 1466433X
Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management and Economics, 24(3), pp. 321-332. ISSN 01446193
Pearce, D (2006) Is the construction sector sustainable? Definitions and reflections. Building Research & Information, 34(3), pp. 201-207. ISSN 0961-3218
Perng, Y H; Juan, Y K and Chien, S F (2006) Exploring the bidding situation for economically most advantageous tender projects using a bidding game. Journal of Construction Engineering and Management, 132(10), pp. 1037-1042. ISSN 0733-9364
Perry, L J (2006) Industrial disputes in the construction sector. Construction Economics and Building, 6(1), pp. 42-50. ISSN 2204-9029
Persily, A K; Gorfain, J and Brunner, G (2006) Survey of ventilation rates in office buildings. Building Research & Information, 34(5), pp. 459-466. ISSN 0961-3218
Perttula, P; Korhonen, P; Lehtelä, J; Rasa, P L; Kitinoja, J P; Mäkimattila, S and Leskinen, T (2006) Improving the safety and efficiency of materials transfer at a construction site by using an elevator. Journal of Construction Engineering and Management, 132(8), pp. 836-843. ISSN 0733-9364
Pheng, L S and Hongbin, J (2006) Analysing ownership, locational and internalization advantages of Chinese construction mncs using rough sets analysis. Construction Management and Economics, 24(11), pp. 1149-1165. ISSN 1466433X
Phua, F T T (2006) Predicting construction firm performance: An empirical assessment of the differential impact between industry- and firm-specific factors. Construction Management and Economics, 24(3), pp. 309-320. ISSN 01446193
Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(6), pp. 615-624. ISSN 1466433X
Pietroforte, R and Gregori, T (2006) Does volume follow share? The case of the Danish construction industry. Construction Management and Economics, 24(7), pp. 711-715. ISSN 1466433X
Pocock, J B; Kuennen, S T; Gambatese, J and Rauschkolb, J (2006) Constructability state of practice report. Journal of Construction Engineering and Management, 132(4), pp. 373-383. ISSN 0733-9364
Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(8), pp. 861-868. ISSN 1466433X
Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X
Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(3), pp. 237-251. ISSN 01446193
Pryke, S and Pearson, S (2006) Project governance: Case studies on financial incentives. Building Research & Information, 34(6), pp. 534-545. ISSN 0961-3218
Puddicombe, M S (2006) The limitations of planning: The importance of learning. Journal of Construction Engineering and Management, 132(9), pp. 949-955. ISSN 0733-9364
Pun, S K; Liu, C and Langston, C (2006) Case study of demolition costs of residential buildings. Construction Management and Economics, 24(9), pp. 967-976. ISSN 1466433X
Raidén, A B; Dainty, A R J and Neale, R H (2006) Balancing employee needs, project requirements and organisational priorities in team deployment. Construction Management and Economics, 24(8), pp. 883-895. ISSN 1466433X
Ramsaran, R and Hosein, R (2006) Growth, employment and the construction industry in Trinidad and Tobago. Construction Management and Economics, 24(5), pp. 465-474. ISSN 1466433X
Rashid Abdul Aziz, A; Shiew yi, H and Jaafar, M (2006) Competitive resources of private housing developers: The Malaysian perspective. Journal of Engineering, Design and Technology, 4(1), pp. 71-80. ISSN 1726-0531
Rees, S W; Zhou, Z and Thomas, H R (2006) Multidimensional simulation of earth-contact heat transfer. Building Research & Information, 34(6), pp. 565-572. ISSN 0961-3218
Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364
Rezgui, Y and Zarli, A (2006) Paving the way to the vision of digital construction: A strategic roadmap. Journal of Construction Engineering and Management, 132(7), pp. 767-776. ISSN 0733-9364
Robert, J; Moulet, L; Lizarralde, G; Davidson, C H; Nie, J and da Sylva, L (2006) Finding out: A system for providing rapid and reliable answers to questions in the construction sector. Construction Innovation, 6(4), pp. 250-261. ISSN 1471-4175
Roulet, C A; Flourentzou, F; Foradini, F; Bluyssen, P; Cox, C and Aizlewood, C (2006) Multicriteria analysis of health, comfort and energy efficiency in buildings. Building Research & Information, 34(5), pp. 475-482. ISSN 0961-3218
Roulet, C A; Johner, N; Foradini, F; Bluyssen, P; Cox, C; De Oliveira Fernandes, E; Müller, B and Aizlewood, C (2006) Perceived health and comfort in relation to energy use and building characteristics. Building Research & Information, 34(5), pp. 467-474. ISSN 0961-3218
Rowlinson, S and Croker, N (2006) IT sophistication, performance and progress towards formal electronic communication in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 13(2), pp. 154-170. ISSN 09699988
Ruddock, L and Lopes, J (2006) The construction sector and economic development: The 'Bon curve'. Construction Management and Economics, 24(7), pp. 717-723. ISSN 1466433X
Rustom, R N (2006) Formulation of generic simulation models for analyzing construction claims. Construction Economics and Building, 6(2), pp. 11-19. ISSN 2204-9029
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(8), pp. 869-881. ISSN 1466433X
Sadeghpour, F; Moselhi, O and Alkass, S T (2006) Computer-aided site layout planning. Journal of Construction Engineering and Management, 132(2), pp. 143-151. ISSN 0733-9364
Sandhu, M and Helo, P (2006) A network approach to project business analysis. Engineering, Construction and Architectural Management, 13(6), pp. 600-615. ISSN 09699988
Sebastian, R (2006) Evaluating a proposed approach for managing collaborative design in the conceptual design phase. Architectural Engineering and Design Management, 2(3), pp. 216-224. ISSN 1745-2007
Sexton, M; Barrett, P and Aouad, G (2006) Motivating small construction companies to adopt new technology. Building Research & Information, 34(1), pp. 11-22. ISSN 0961-3218
Sha, K; Song, T; Qi, X and Luo, N (2006) Rethinking China's urbanization: An institutional innovation perspective. Building Research & Information, 34(6), pp. 573-583. ISSN 0961-3218
Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364
Shen, L Y; Lu, W S and Yam, M C H (2006) Contractor key competitiveness indicators: A China study. Journal of Construction Engineering and Management, 132(4), pp. 416-424. ISSN 0733-9364
Shen, L Y; Zhao, Z Y and Drew, D S (2006) Strengths, weaknesses, opportunities, and threats for foreign-invested construction enterprises: A China study. Journal of Construction Engineering and Management, 132(9), pp. 966-975. ISSN 0733-9364
Shiers, D; Rapson, D; Roberts, C and Keeping, M (2006) Sustainable construction: The development and evaluation of an environmental profiling system for construction products. Construction Management and Economics, 24(11), pp. 1177-1184. ISSN 1466433X
Shih, N J and Huang, S T (2006) 3D scan information management system for construction management. Journal of Construction Engineering and Management, 132(2), pp. 134-142. ISSN 0733-9364
Shipworth, D (2006) Qualitative modelling of sustainable energy scenarios: An extension of the bon qualitative input-output model. Construction Management and Economics, 24(7), pp. 695-703. ISSN 1466433X
Shohet, I M (2006) Key performance indicators for strategic healthcare facilities maintenance. Journal of Construction Engineering and Management, 132(4), pp. 345-352. ISSN 0733-9364
Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(2), pp. 131-148. ISSN 01446193
Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218
Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387
Singh, D and Tiong, R L K (2006) Contractor selection criteria: Investigation of opinions of Singapore construction practitioners. Journal of Construction Engineering and Management, 132(9), pp. 998-1008. ISSN 0733-9364
Sinha, S; Kumar, B and Thomson, A (2006) Measuring project complexity: A project manager's tool. Architectural Engineering and Design Management, 2(3), pp. 187-202. ISSN 1745-2007
Skitmore, M and Runeson, G (2006) Bidding models: Testing the stationarity assumption. Construction Management and Economics, 24(8), pp. 791-803. ISSN 1466433X
Skitmore, M; Runeson, G and Chang, X (2006) Construction price formation: Full-cost pricing or neoclassical microeconomic theory? Construction Management and Economics, 24(7), pp. 773-783. ISSN 1466433X
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Empirical evaluation of structural frame performance criteria: Realizing the potential of hybrid concrete construction. Journal of Construction Engineering and Management, 132(3), pp. 278-290. ISSN 0733-9364
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X
Song, J; Haas, C T and Caldas, C H (2006) Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), pp. 911-918. ISSN 0733-9364
Song, Y and Chua, D K H (2006) Modeling of functional construction requirements for constructability analysis. Journal of Construction Engineering and Management, 132(12), pp. 1314-1326. ISSN 0733-9364
Song, Y; Liu, C and Langston, C (2006) Extending construction linkage measures by the consideration of the impact of capital. Construction Management and Economics, 24(11), pp. 1207-1216. ISSN 1466433X
Song, Y; Liu, C and Langston, C (2006) Linkage measures of the construction sector using the hypothetical extraction method. Construction Management and Economics, 24(6), pp. 579-589. ISSN 1466433X
Spielholz, P; Davis, G and Griffith, J (2006) Physical risk factors and controls for musculoskeletal disorders in construction trades. Journal of Construction Engineering and Management, 132(10), pp. 1059-1068. ISSN 0733-9364
Srour, I M; Haas, C T and Borcherding, J D (2006) What does the construction industry value in its workers? Journal of Construction Engineering and Management, 132(10), pp. 1053-1058. ISSN 0733-9364
Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364
Steadman, P (2006) Allometry and built form: Revisiting Ranko Bon's work with the harvard philomorphs. Construction Management and Economics, 24(7), pp. 755-765. ISSN 1466433X
Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193
Stoy, C and Kalusche, W (2006) The determination of occupancy costs during early project phases. Construction Management and Economics, 24(9), pp. 933-944. ISSN 1466433X
Stoy, C and Kytzia, S (2006) Benchmarking electricity consumption. Construction Management and Economics, 24(10), pp. 1083-1089. ISSN 1466433X
Styhre, A and Josephson, P E (2006) Revisiting site manager work: Stuck in the middle? Construction Management and Economics, 24(5), pp. 521-528. ISSN 1466433X
Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364
Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007
Sunikka, M (2006) Energy efficiency and low-carbon technologies in urban renewal. Building Research & Information, 34(6), pp. 521-533. ISSN 0961-3218
Tam, C M; Tong, T K L and Chan, K K (2006) Rough set theory for distilling construction safety measures. Construction Management and Economics, 24(11), pp. 1199-1206. ISSN 1466433X
Tam, V W Y; Tam, C M; Shen, L Y; Zeng, S X and Ho, C M (2006) Environmental performance assessment: Perceptions of project managers on the relationship between operational and environmental performance indicators. Construction Management and Economics, 24(3), pp. 287-299. ISSN 01446193
Tam, V W Y; Tam, C M; Yiu, K T W and Cheung, S O (2006) Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Construction Management and Economics, 24(11), pp. 1113-1123. ISSN 1466433X
Tang, C M; Leung, A Y T and Lam, K C (2006) Entropy application to improve construction finance decisions. Journal of Construction Engineering and Management, 132(10), pp. 1099-1113. ISSN 0733-9364
Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193
Tang, W; Duffield, C F and Young, D M (2006) Partnering mechanism in construction: An empirical study on the Chinese construction industry. Journal of Construction Engineering and Management, 132(3), pp. 217-229. ISSN 0733-9364
Tatum, C B; Vorster, M and Klingler, M (2006) Innovations in earthmoving equipment: New forms and their evolution. Journal of Construction Engineering and Management, 132(9), pp. 987-997. ISSN 0733-9364
Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364
Teerajetgul, W and Charoenngam, C (2006) Factors inducing knowledge creation: Empirical evidence from Thai construction projects. Engineering, Construction and Architectural Management, 13(6), pp. 584-599. ISSN 09699988
Telem, D; Laufer, A and Shapira, A (2006) Only dynamics can absorb dynamics. Journal of Construction Engineering and Management, 132(11), pp. 1167-1177. ISSN 0733-9364
Telem, D; Shapira, A; Goren, Y D and Schexnayder, C J (2006) Moving a reinforced-concrete building: Case study. Journal of Construction Engineering and Management, 132(2), pp. 115-124. ISSN 0733-9364
Teo, E A L and Harikrishna, N (2006) A quantitative model for efficient maintenance of plastered and painted façades. Construction Management and Economics, 24(12), pp. 1283-1293. ISSN 1466433X
Thomas, A V; Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(4), pp. 407-424. ISSN 01446193
Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364
Thomson, D S; Austin, S A; Root, D S; Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(1), pp. 43-61. ISSN 09699988
Tokdemir, O B; Arditi, D and Balcik, C (2006) ALISS: Advanced linear scheduling system. Construction Management and Economics, 24(12), pp. 1253-1267. ISSN 1466433X
Tombesi, P (2006) Good thinking and poor value: On the socialization of knowledge in construction. Building Research & Information, 34(3), pp. 272-286. ISSN 0961-3218
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364
Tucker, R and Rollo, J (2006) Teaching and learning in collaborative group design projects. Architectural Engineering and Design Management, 2(1-2), pp. 19-30. ISSN 1745-2007
Turner, R K (2006) Sustainability auditing and assessment challenges. Building Research & Information, 34(3), pp. 197-200. ISSN 0961-3218
Uwakweh, B O (2006) Motivational climate of construction apprentice. Journal of Construction Engineering and Management, 132(5), pp. 525-532. ISSN 0733-9364
Van Dijken, F; Van Bronswijk, J E M H and Sundell, J (2006) Indoor environment and pupils' health in primary schools. Building Research & Information, 34(5), pp. 437-446. ISSN 0961-3218
Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364
Waara, F and Bröchner, J (2006) Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), pp. 797-804. ISSN 0733-9364
Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 09699988
Wang, D; Hadavi, A and Krizek, R J (2006) Chinese construction firms in reform. Construction Management and Economics, 24(5), pp. 509-519. ISSN 1466433X
Wells, J (2006) Labour subcontracting in the construction industries of developing countries: An assessment from two perspectives. Journal of Construction in Developing Countries, 11(1), pp. 17-36. ISSN 1823-6499
Werna, E (2006) The construction action programme of the international labour office: A view of on-going implementation and implications for research. Journal of Construction in Developing Countries, 11(1), pp. 53-72. ISSN 1823-6499
West, T and Worthington, A C (2006) Macroeconomic risk factors in Australian commercial real estate, listed property trust and property sector stock returns. Journal of Financial Management of Property and Construction, 11(2), pp. 105-116. ISSN 1366-4387
Whitla, P; Walters, P and Davies, H (2006) The use of global strategies by British construction firms. Construction Management and Economics, 24(9), pp. 945-954. ISSN 1466433X
Wibowo, A (2006) CAPM-based valuation of financial government supports to infeasible and risky private infrastructure projects. Journal of Construction Engineering and Management, 132(3), pp. 239-248. ISSN 0733-9364
Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X
Winch, G M (2006) Towards a theory of construction as production by projects. Building Research & Information, 34(2), pp. 164-174. ISSN 0961-3218
Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiangn, Y H (2006) The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1), pp. 1-17. ISSN 1726-0531
Wong, J T Y and Hui, E C M (2006) Construction project risks: Further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(4), pp. 425-438. ISSN 01446193
Wood, A (2006) Demystifying construction: Technology in architectural education. Architectural Engineering and Design Management, 2(1-2), pp. 5-18. ISSN 1745-2007
Wu, S; Clements-Croome, D; Fairey, V; Albany, B; Sidhu, J; Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(2), pp. 136-153. ISSN 09699988
Yang, I T (2006) Using Gaussian copula to simulate repetitive projects. Construction Management and Economics, 24(9), pp. 901-909. ISSN 1466433X
Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364
Yean, F and Ling, Y (2006) Design-build: How to increase its usage and its impact on architects and contractors in Singapore. Construction Economics and Building, 6(1), pp. 12-24. ISSN 2204-9029
Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364
Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364
Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2006) Investigation of critical success factors in construction project briefing by way of content analysis. Journal of Construction Engineering and Management, 132(11), pp. 1178-1186. ISSN 0733-9364
Yu, A T W; Shen, Q; Kelly, J and Lin, G (2006) A value management approach to strategic briefing: An exploratory study. Architectural Engineering and Design Management, 2(4), pp. 245-259. ISSN 1745-2007
Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364
Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193
Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(5), pp. 529-543. ISSN 1466433X
Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193
Zhang, H; Li, H and Tam, C M (2006) Particle swarm optimization for preemptive scheduling under break and resource-constraints. Journal of Construction Engineering and Management, 132(3), pp. 259-267. ISSN 0733-9364
Zhang, H; Tam, C M; Li, H and Shi, J J (2006) Particle swarm optimization-supported simulation for construction operations. Journal of Construction Engineering and Management, 132(12), pp. 1267-1274. ISSN 0733-9364
Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364
Zhang, S B and Liu, A M M (2006) Organisational culture profiles of construction enterprises in China. Construction Management and Economics, 24(8), pp. 817-828. ISSN 1466433X
Zhang, X (2006) Factor analysis of public clients' best-value objective in public-privately partnered infrastructure projects. Journal of Construction Engineering and Management, 132(9), pp. 956-965. ISSN 0733-9364
Zhang, X (2006) Markov-based optimization model for building facilities management. Journal of Construction Engineering and Management, 132(11), pp. 1203-1211. ISSN 0733-9364
Zhang, X (2006) Public clients' best value perspectives of public private partnerships in infrastructure development. Journal of Construction Engineering and Management, 132(2), pp. 107-114. ISSN 0733-9364
Zhang, X; Goulding, J S; Sexton, M G; Aouad, G and Kagioglou, M (2006) HyCon: Virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(1), pp. 47-60. ISSN 1471-4175
Zhao, T and Fu, C C (2006) Infrastructure development and expansion under uncertainty: A risk-preference-based lattice approach. Journal of Construction Engineering and Management, 132(6), pp. 620-625. ISSN 0733-9364
Zou, J and Zillante, G (2006) Relationship contracting: The South Australian experience: a case study. Construction Economics and Building, 6(2), pp. 20-31. ISSN 2204-9029
Zou, P X W (2006) Strategies for minimizing corruption in the construction industry in China. Journal of Construction in Developing Countries, 11(2), pp. 15-29. ISSN 1823-6499
Zou, P X W and Darvish, H (2006) Group assignments and teamwork skills development in postgraduate construction management studies. Architectural Engineering and Design Management, 2(3), pp. 203-215. ISSN 1745-2007
Conference or Workshop Item
Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2006) How productive is the construction industry? In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Adeyeye, K; Pasquire, C; Bouchlaghem, D and Chandler, J (2006) Exploring the efficacy of digital tools for the design and construction of hybrid buildings. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2006) Development of research instrument for project managers' performance measures in mass house building projects. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Aiyetan, A O and Olotuah, A O (2006) Impact of motivation on workers' productivity in the Nigerian construction industry. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Al-Yami, A M and Price, A D F (2006) A framework for implementing sustainable construction in building briefing project. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Alsdorf, M; Koch, C and Sander, D (2006) Coaching at the building site: A feasibility study. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Antoniadis, D N; Edum-Fotwe, F T and Thorpe, A (2006) Project reporting and complexity. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Auchterlounie, T (2006) An example of partnering between a North American speculative housebuilder and their subcontractors. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Bagies, A and Fortune, C (2006) Bid/no-bid decision modelling for construction projects. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Beaney, W D (2006) An examination of sectoral mobility in the UK labour force. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Braimah, N; Ndekugri, I and Gameson, R (2006) A review of industry standards and publications/charts for adjusting productivity losses in construction contracts. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Campbell, J M and Smith, S D (2006) CBR research using the 'think', 'plan', 'do' classification method. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Campbell, J M and Smith, S D (2006) Improving industrial value and longevity of safety management research. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chan, P W and Connolly, M (2006) The role of schools careers advisers in encouraging new entrants into construction. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chan, P W; Grantham, A; Kaplinsky, R; Mynors, D; Mohamed, S; Walsh, K and Coles, R (2006) A taxonomy of knowledge leakage: Some early developments. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chiang, Y H and Lok, L K L (2006) Sustainable advantages and corporate strategies: The case of prefabrication in Hong Kong. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chileshe, N (2006) Investigating practitioner's understanding of TQM in small and medium construction companies. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Collier, C (2006) Researchers' perceptions of the development of qualitative approaches in construction management research. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Davies, R (2006) Talking about construction innovation. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Davison, N; Goodier, C; Gibb, A; Austin, S; Saker, J and Gregory, C (2006) Factors influencing the market for branded mass customised buildings. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Dawood, N; Sikka, S; Marasini, R and Dean, J (2006) Development of key performance indicators to establish the benefits of 4D planning. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Dina Koutsikouri, D A A S (2006) Critical success factors for multidisciplinary engineering projects. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2006) Multiskilling: A UK construction and building services perspective. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Faisol, N; Dainty, A R J and Price, A D F (2006) Perceptions of construction organisations on developing successful inter-organisational relationships. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Galea, N and Loosemore, M (2006) Men and conflict in the construction industry. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gomez, C P (2006) Reconceptualizing the management of technology in construction: A Malaysian perspective. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gorse, C; McKinney, I; Shepherd, A; Morley, D and Ellis, R (2006) Internal support mechanisms in groups and teams. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gorse, C; McKinney, I; Shepherd, A and Whitehead, P (2006) Meetings: Factors that affect group interaction and performance. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gottlieb, S C and Storgaard, K (2006) Flexible strategic partnerships in Danish construction. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Graham, B and Thomas, K (2006) Knowledge management in Irish construction: The role of CPD accreditation. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Harty, C; Goodier, C; Soetanto, R; Austin, S; Dainty, A; Price, A and Thorpe, T (2006) Scenario development: A methodology for aligning contemporary practices with the potential futures of UK construction. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Hatmoko, J U D and Scott, S (2006) Simulating the impact of supply chain management practice on construction project performance. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Hurst, A G (2006) The relationship between he recruitment levels and employment levels in the construction industry. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ikpe, E K P P D O D (2006) The management of construction health and safety: Investigating the cost-benefit. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Isiadinso, C; Anumba, C J; El-Rimawi, J and Bhamra, T (2006) Design for deconstruction lessons from the manufacturing industry. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Jewell, C (2006) Informal employment: A threat or an opportunity for the UK construction sector? In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kaatz, E; Root, D S; Hilland, R C and Bowen, P A (2006) Fostering sustainability and enhancing quality in construction with building sustainability assessment. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kappia, J G; Dainty, A R J and Price, A D F (2006) Using qualitative methods to explore career development for construction operatives. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kazaz, A and Ulubeyli, S (2006) Organizational factors influencing construction manpower productivity in Turkey. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kazaz, A and Ulubeyli, S (2006) Physical factors affecting productivity of Turkish construction workers. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kempton, J (2006) The potential for lean thinking in the refurbishment and repair of dwellings in the registered social landlord sector. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kheni, N A; Gibb, A G F and Dainty, A R J (2006) The management of construction site health and safety by small and medium-sized construction businesses in developing countries: A Ghana case study. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kishk, M (2006) Handling the conservative nature of fuzzy whole-life cost simulations. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kishk, M; Laing, R and Edge, M (2006) An extended whole-life application for the selection of hospital finishes. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Koch, C and Larsen, C S (2006) Quality in construction: A supply chain perspective. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Koch, C and Simonsen, R (2006) Operations strategy and innovation? A contractor implementing lean. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kridan, A B and Goulding, J S (2006) Assessing the role of knowledge management processes in implementing a knowledge management system: An application of the capability maturity model to the Libyan banking sector. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Laryea, S and Hughes, W (2006) The price of risk in construction projects. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Masurier, J L; Rotimi, J O B and Wilkinson, S (2006) A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Mo, Y; Dainty, A and Price, A (2006) The relevance of eq to construction project management education and practice: An investigative framework. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Mogotlhwane, T; Khosrowshahi, F and Underwood, J (2006) Impact of ICT applications in performance: Search for evidence. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ng, A and Loosemore, M (2006) Risk allocation in public private partnership (PPP) projects: The new southern railway project. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Nielsen, Y; Kumas, N and Ciftci, C (2006) ICT use in Turkish construction sector: Existing laws and regulations. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Nugraheni, F and Scott, D (2006) An approach to define construction practice from construction images. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Nystrom, J (2006) The naivety of partnering assessments. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ochieng, E and Price, A D F (2006) Reforming the management of industrial projects in developing countries: The role of strategic planning. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Olotuah, A O and Aiyetan, A O (2006) Sustainable low-cost housing provision in Nigeria: A bottom-up participatory approach. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Omoregie, A and Radford, D (2006) Polycentric cultural framework for infrastructure procurement in Nigeria. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Onyenobi, T; Hudson, J and Ormerod, M (2006) Impact of building geometry on fire spread rate. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Penn, A (2006) What can architectural research bring to organization theory? In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Phua, F (2006) Examining the effects of senior executives' perceived environmental uncertainty on the strategic functions of construction firms. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Riaz, Z; Edwards, D J; Mackenzie, J and Thorpe, T (2006) Emerging information, communication and technology systems applied to construction vehicle safety. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Salama, M; Al-Sharif, F; Kaka, A P and Leishman, C (2006) Cost modelling for standardised design projects. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Salama, M; Aziz, H A E; Sawah, H E and Samadony, A E (2006) Investigating the criteria for contractors' selection and bid evaluation in Egypt. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Selih, J (2006) Selection of refurbishment actions for residential buildings by multi criteria decision method. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sertyesihsik, B (2006) The effectiveness of the five-year development plans on the development of the construction sector. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Shafik, M and Martin, P (2006) The impact of procurement methods on the Scottish housebuilding industry. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Shafik, M and Martin, P (2006) The many faces of property market cycles. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Smallwood, J (2006) Scaffolding health and safety: A multi-stakeholder issue. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sullivan, K T; Kashiwagi, M; Badger, W W; Kashiwagi, D; Egbu, C and Chang, C K (2006) Leadership, the information environment, and the performance measuring project manager. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sward, A (2006) Relations as a key resource. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Tennant, S and Langford, D (2006) Team performance measurement: Let's reward teamwork. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Teo, M and Loosemore, M (2006) Community protest groups' perceptions of environmental risks using social contagion theory. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Thomas, J; Giddings, B and Little, L (2006) An holistic evaluation of the workplace environment. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Train, A; Egbu, C O and Hinks, J (2006) Key issues in innovation and knowledge management in the finance and construction sectors. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Tsai, H; Wang, L C and Lee, J W (2006) Exploration of ranking method of group decision making. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Volker, L and Prins, M (2006) Critical reflections on measuring the effect of steering activities in architectural design. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Wall, J and Ahmed, V (2006) Delivering continuing professional development for construction management using e-learning. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Wamuziri, S and Klatt, A (2006) Expanding water supply and sanitation in Sub-Saharan Africa using microfinance. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Wilson, B; An, M and Evdorides, H (2006) The effects of building and planning regulations on construction and demolition waste management. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Wu, J and Liu, A M M (2006) A study on the relationship between organizational commitment and task performance in Chinese construction firms. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Xiao, H and Boyd, D (2006) Using personal construct theory to challenge knowledge management practice in construction. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Yang, J and Price, A D F (2006) Innovative design and construction solutions for improved therapeutic healing environments. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Zhang, X; Austin, S A and Glass, J (2006) Linking individual and organisational values: A case study in UK construction. In: Boyd, D. (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Thesis
Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. Unpublished EngD thesis, Loughborough University, UK.
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. Unpublished PhD thesis, State University of New York at Buffalo, USA.
Al-Husseini, A-M (2006) The impact of transformational leadership and empowerment on project management. Unpublished DM thesis, University of Phoenix, USA.
Al-Ibrahim, A (2006) Optimizing roof maintenance and replacement decisions. Unpublished PhD thesis, North Carolina State University, USA.
Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates. Unpublished PhD thesis, The Ohio State University, USA.
Alhudaithy, I M (2006) Rights of tenderers and contractors under Saudi public procurement contract regulations: a comparative study with England and Wales. Unpublished PhD thesis, Durham University, UK.
Alnsour, J A M (2006) Planning and managing the built environment in the context of compliance with residential standards in Jordan. Unpublished PhD thesis, University of Huddersfield, UK.
Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. Unpublished PhD thesis, The George Washington University, USA.
Anderson, P M (2006) Construction collaboration: a QFD approach. Unpublished PhD thesis, Loughborough University, UK.
Anumba, C (2006) Application of GIS to labour market planning in construction. Unpublished EngD thesis, Loughborough University, UK.
Arain, F M (2006) Knowledge-based decision support system (kbdss) for management of variation orders for school building projects in Singapore. Unpublished PhD thesis, National University of Singapore, Singapore.
Baiden, B K (2006) Framework for the integration of the project delivery team. Unpublished PhD thesis, Loughborough University, UK.
Barker, R (2006) Waste assessment and application of improvement techniques in UK private housebuilding supply chains. Unpublished PhD thesis, Cardiff University, UK.
Bartlett, H V (2006) Understanding the implementation of sustainability principles in UK educational building projects. Unpublished PhD thesis, University of Cambridge, UK.
Bayraktar, M E (2006) A decision model to determine the optimal time-cost trade off in highway work zone projects. Unpublished PhD thesis, Purdue University, USA.
Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. Unpublished DDes thesis, Harvard University, USA.
Besser, D (2006) The experience of women in construction management: A hermeneutic phenomenological study. Unpublished PhD thesis, University of Minnesota, USA.
Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. Unpublished PhD thesis, University of Reading, UK.
Chandra, S (2006) Investigating green building assessment tools: a risk-analysis based approach. Unpublished PhD thesis, University of New South Wales, Australia.
Chen, H (2006) Exploring the relationships between influencing factors and performance for construction joint ventures. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. Unpublished PhD thesis, Columbia University, USA.
Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. Unpublished PhD thesis, University of Florida, USA.
Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy. Unpublished PhD thesis, University of Florida, USA.
Condon, E J (2006) The project game: Strategic estimating on major projects. Unpublished PhD thesis, University of Calgary, Canada.
Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants. Unpublished EngD thesis, Brunel University, UK.
Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. Unpublished PhD thesis, Queensland University of Technology, Australia.
Dai, J (2006) A latent analysis and prototype system to manage jobsite factors impacting construction labor productivity. Unpublished PhD thesis, University of Kentucky, USA.
Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. Unpublished PhD thesis, University of Texas at Austin, USA.
Danso-Amoako, M O (2006) Developing a framework to support data exchange from heterogeneous data sources via industry foundation classes (IFC) and web services. Unpublished PhD thesis, University of Florida, USA.
Das, P K (2006) A sustainability impact-assessment tool for selected building technologies in rural India: the case of the Andhra Pradesh primary education project. Unpublished PhD thesis, University of Newcastle upon Tyne, UK.
De Zoysa, G N S (2006) Application and re-use of information and knowledge in managing risks of infrastructure projects. Unpublished PhD thesis, University of British Columbia, Canada.
Dib, H Y (2006) Visual information access and management for life cycle project management. Unpublished PhD thesis, University of Florida, USA.
Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis. Unpublished PhD thesis, University of Alberta, Canada.
Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules. Unpublished PhD thesis, Indiana State University, USA.
Ekanayake, L L (2006) Interface conflicts and regulatory decision making process on power projects in Sri Lanka. Unpublished PhD thesis, National University of Singapore, Singapore.
Eleyan, D (2006) Project review solution-directed model using system dynamics modelling. Unpublished PhD thesis, University of Manchester, UK.
Elhakeem, A A M (2006) An asset management framework for educational buildings with life-cycle cost analysis. Unpublished PhD thesis, University of Waterloo, Canada.
Fu, C (2006) Integration and interoperability of IT applications and information in construction - a study in nD modelling. Unpublished PhD thesis, University of Salford, UK.
Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. Unpublished PhD thesis, The University of Texas at Austin, USA.
Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. Unpublished PhD thesis, University of British Columbia, Canada.
Gkritza, K (2006) Economic development effects of highway investment. Unpublished PhD thesis, Purdue University, USA.
Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. Unpublished PhD thesis, Carnegie Mellon University, USA.
Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. Unpublished PhD thesis, University of Newcastle upon Tyne, UK.
Griffith, A (2006) Expanding knowledge and practice of construction management systems and procedures. Unpublished DSc thesis, Sheffield Hallam University, UK.
Guo, K (2006) Risk of pavement warranties to contractors. Unpublished PhD thesis, University of Florida, USA.
Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives. Unpublished PhD thesis, University of Strathclyde, UK.
Hare, W J (2006) Integration of health and safety planning in construction project management through the development of a best practice gateway model. Unpublished PhD thesis, Glasgow Caledonian University, UK.
Hasan, N (2006) Developing a balanced scorecard model for evaluation of project management and performance. Unpublished PhD thesis, University of Birmingham, UK.
He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation. Unpublished PhD thesis, Columbia University, USA.
Hong, J (2006) A study on analytic approaches to intelligent buildings assessment. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Hou, J-H (2006) Object modeling and proper abstractions: The case of stair design. Unpublished DDes thesis, Harvard University, USA.
Hwang, B G (2006) Development of a performance measurement system for the delivery of pharmaceutical capital facility projects. Unpublished PhD thesis, University of Texas at Austin, USA.
Isikdag, U (2006) Towards the implementation of building information models in geospatial context. Unpublished PhD thesis, University of Salford, UK.
Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry. Unpublished PhD thesis, Nottingham Trent University, UK.
Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. Unpublished PhD thesis, Purdue University, USA.
Jiang, H (2006) Chinese multinational construction firms in international and domestic markets: A re-examination of the eclectic paradigm. Unpublished PhD thesis, National University of Singapore, Singapore.
Jongeling, R (2006) A process model for work-flow management in construction. Published PhD thesis, Luleå University of Technology, Sweden.
Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya. Unpublished PhD thesis, University of Michigan, USA.
Kang, S-C (2006) Computer planning and simulation of construction erection processes using single or multiple cranes. Unpublished PhD thesis, Stanford University, USA.
Kappia, J G (2006) Career dynamics within the construction industry: a trade and craft perspective. Unpublished PhD thesis, Loughborough University, UK.
Kassim, S M (2006) Sustainability of private sector in solid waste collection: a case of Dar es Salaam Tanzania. Unpublished PhD thesis, Loughborough University, UK.
Khalafallah, A M (2006) Optimal construction site layout planning for airport expansion projects. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. Unpublished PhD thesis, University of Florida, USA.
Knebel, V (2006) Preserve and rebuild: the built environment, status transformations and identity construction in eastern Germany after reunification. Unpublished PhD thesis, University of Edinburgh, UK.
Kua, H W (2006) The design of effective policies for the promotion of sustainable construction materials. Unpublished PhD thesis, Massachusetts Institute of Technology, USA.
Kübler, O (2006) Applied decision-making in civil engineering. Unpublished DSc thesis, ETH Zürich, Switzerland.
Langevine, R (2006) A decision support system for the maintenance management of buildings. Unpublished PhD thesis, University of Alberta, Canada.
Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. Unpublished PhD thesis, Massachusetts Institute of Technology, USA.
Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Li, S (2006) Three essays on bidding in the construction industry. Unpublished PhD thesis, The University of Utah, USA.
Liang, Y (2006) Integrated IT systems for construction site management. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Lim, K H (2006) Causal model for management of subcontractors in waste minimization. Unpublished PhD thesis, National University of Singapore, Singapore.
Lippard, C D (2006) Building inequality: A case study of white, black, and latino contractors in the Atlanta construction industry. Unpublished PhD thesis, Georgia State University, USA.
Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. Unpublished PhD thesis, University of Florida, USA.
Lu, W (2006) A system for assessing and communicating contractors' competitiveness. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. Unpublished PhD thesis, Glasgow Caledonian University, UK.
Magub, A T (2006) Experiences of the phenomenon of internet use for information sharing on construction projects and skills set identification for effective project participation. Unpublished PhD thesis, Queensland University of Technology, Australia.
Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. Unpublished PhD thesis, Stanford University, USA.
Marshall-Ponting, A J (2006) nD modelling as an enabler of inter-disciplinary thinking among construction industry stakeholders. Unpublished PhD thesis, University of Salford, UK.
Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. Unpublished PhD thesis, University of Manchester, UK.
Menches, C L (2006) Effect of pre-construction planning on electrical project performance. Unpublished PhD thesis, University of Wisconsin - Madison, USA.
Milberg, C T (2006) Application of tolerance management to civil systems. Unpublished PhD thesis, University of California, Berkeley, USA.
Mohamed, S F (2006) Improving construction site management practices through knowledge management. Unpublished PhD thesis, Loughborough University, UK.
Moore, J D (2006) Women in construction management: Creating a theory of career choice and development. Unpublished PhD thesis, Colorado State University, USA.
Mourshed, M (2006) Interoperability-based optimisation of architectural design. Unpublished PhD thesis, Loughborough University, UK.
Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Olander, S (2006) External stakeholder analysis in construction project management. Unpublished PhD thesis, Lund University, Sweden.
Osman, A E (2006) Life cycle optimization model for integrated cogeneration and energy systems applications in buildings. Unpublished PhD thesis, University of Pittsburgh, USA.
Pan, J (2006) Construction project information management in a semantic web environment. Unpublished PhD thesis, Loughborough University, UK.
Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. Unpublished PhD thesis, Loughborough University, UK.
Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. Unpublished PhD thesis, University of Texas at Austin, USA.
Persson, M H (2006) Lessons learned in knowledge management: The case of construction. Published PhD thesis, Lund University, Sweden.
Pickhaver, J A (2006) Numerical modelling of building response to tunnelling. Unpublished PhD thesis, University of Oxford, UK.
Pryce, M (2006) An exploration of the benefits, drivers and barriers that affect the adoption of green roofs in urban Britain. Unpublished PhD thesis, University of Salford (United Kingdom), UK.
Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. Unpublished PhD thesis, University of Florida, USA.
Rihani, R A (2006) An investigation of critical success factors for robotic masonry. Unpublished PhD thesis, North Carolina State University, USA.
Ruikar, K (2006) Business process implications of e-commerce in construction organisations. Unpublished EngD thesis, Loughborough University, UK.
Salonen, A (2006) Relational risk and relationship management in facilities management partnerships. Published PhD thesis, Helsinki University of Technology, Finland.
Samuelsson, P (2006) Integrated measurement and assessment of performance in large organizations: The case of a Swedish construction company. Unpublished PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. Unpublished PhD thesis, University of Central Florida, USA.
Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. Unpublished PhD thesis, University of South Wales, UK.
Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Shane, J S (2006) A fundamental study of scope definition in early highway project development. Unpublished PhD thesis, University of Colorado at Boulder, USA.
Shell, J F (2006) Decision-making strategies used by California school districts' chief business officials in the selection of construction management services as a project delivery system for construction projects over five million dollars. Unpublished EdD thesis, University of La Verne, USA.
Sinha, S (2006) Skill based framework for measuring complexity of construction projects. Unpublished PhD thesis, University of Strathclyde, UK.
Sleymann, A A (2006) A study on perceptions of civil engineers regarding mandatory continuing education. Unpublished PhD thesis, Western Michigan University, USA.
Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. Unpublished PhD thesis, University of Manchester, UK.
Srithongrung, A (2006) The impact of state capital budget and management programs on state capital budget decisions and economic performance. Unpublished DPA thesis, University of Illinois at Springfield, USA.
Stenberg, A-C I (2006) The social construction of green building: Diachronic and synchronic perspectives. Unpublished PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Suresh, S (2006) Knowledge capture in small and medium enterprises in the UK construction industry. Unpublished PhD thesis, Glasgow Caledonian University, UK.
Tan, H C (2006) A methodology for the 'live' capture and reuse of project knowledge in construction. Unpublished PhD thesis, Loughborough University, UK.
Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects. Unpublished PhD thesis, University of Leeds, UK.
Tang, Y (2006) Evolutionary and customer-oriented building design process. Unpublished PhD thesis, Loughborough University, UK.
Taylor, J E (2006) Three perspectives on innovation in interorganizational networks: Systemic innovation, boundary object change, and the alignment of innovations and networks. Unpublished PhD thesis, Stanford University, USA.
Teo, R A (2006) Continuous improvement to the construction industry: Enhancing quality through learning. Unpublished PhD thesis, Heriot-Watt University, UK.
Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction. Unpublished PhD thesis, Virginia Polytechnic Institute and State University, USA.
Thomson, C S (2006) A study of the innovation process within the construction project environment. Unpublished PhD thesis, University of Dundee, UK.
Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). Unpublished PhD thesis, The Ohio State University, USA.
Unger, C (2006) Industrialised house building: Fundamental change or business as usual? Published PhD thesis, KTH Royal Institute of Technology, Sweden.
Vaziri, K (2006) Program planning under uncertainty. Unpublished PhD thesis, Cornell University, USA.
Wang, P (2006) Production-based large scale construction simulation modeling. Unpublished PhD thesis, University of Alberta, Canada.
Weiss, A P W (2006) Value for money: defining and measuring 'value' in MoD's acquisition policy of obtaining best value for money. Unpublished PhD thesis, University College London, UK.
Widén, K (2006) Innovation diffusion in the construction sector. Published PhD thesis, Lund University, Sweden.
Wong, K T T (2006) Strategies for environmental sustainability in Hong Kong's construction industry. Unpublished PhD thesis, University of South Australia, Australia.
Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Yan, C (2006) Risk management strategy of construction projects in China. Unpublished PhD thesis, University of Bedfordshire, UK.
Zhang, X (2006) Toward innovative and efficient infrastructure delivery. Unpublished PhD thesis, University of Alberta, Canada.