Items where Year is 2005
Article
Abdul-Hadi, N H; Al-Sudairi, A and Alqahtani, S (2005) Prioritizing barriers to successful business process re-engineering (BPR) efforts in Saudi Arabian construction industry. Construction Management and Economics, 23(3), pp. 305-315. ISSN 01446193
Acar, E; Koçak, I; Sey, Y and Arditi, D (2005) Use of information and communication technologies by small and medium-sized enterprises (SMEs) in building construction. Construction Management and Economics, 23(7), pp. 713-722. ISSN 01446193
Adriaanse, A and Voordijk, H (2005) Interorganizational communication and ICT in construction projects: A review using metatriangulation. Construction Innovation, 5(3), pp. 159-177. ISSN 1471-4175
Akintoye, A and Chinyio, E (2005) Private finance initiative in the healthcare sector: Trends and risk assessment. Engineering, Construction and Architectural Management, 12(6), pp. 601-616. ISSN 09699988
Al-Hussein, M; Alkass, S and Moselhi, O (2005) Optimization algorithm for selection and on site location of mobile cranes. Journal of Construction Engineering and Management, 131(5), pp. 579-590. ISSN 0733-9364
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193
Altomonte, S (2005) CH2: lighting and physiology. Construction Economics and Building, 5(2), pp. 40-46. ISSN 2204-9029
Ang, G; Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(2), pp. 107-119. ISSN 0961-3218
Ankrah, N A and Langford, D A (2005) Architects and contractors: A comparative study of organizational cultures. Construction Management and Economics, 23(6), pp. 595-607. ISSN 01446193
Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175
Aouad, G F; Lee, A and Wu, S (2005) ND modelling for collaborative working in construction. Architectural Engineering and Design Management, 1(1), pp. 33-44. ISSN 1745-2007
Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007
Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007
Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 09699988
Arayici, Y; Aouad, G and Ahmed, V (2005) Requirements engineering for innovative integrated ICT systems for the construction industry. Construction Innovation, 5(3), pp. 179-200. ISSN 1471-4175
Arditi, D; Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(5), pp. 487-501. ISSN 09699988
Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364
Arif, A A and Karam, A H (2005) Architectural practices and IT: Local vs international. Journal of Engineering, Design and Technology, 3(2), pp. 155-163. ISSN 1726-0531
Augenbroe, G and Park, C S (2005) Quantification methods of technical building performance. Building Research & Information, 33(2), pp. 159-172. ISSN 0961-3218
Aye, L and Fuller, R J (2005) An evaluation of a proposed ventilation system for melbourne's CH2 building. Construction Economics and Building, 5(2), pp. 47-57. ISSN 2204-9029
Aye, L and Fuller, R J (2005) The proposed heating and cooling system in the CH2 building and its impact on occupant productivity. Construction Economics and Building, 5(2), pp. 32-39. ISSN 2204-9029
Bakens, W; Foliente, G and Jasuja, M (2005) Engaging stakeholders in performance-based building: Lessons from the performance-based building (PeBBu) network. Building Research & Information, 33(2), pp. 149-158. ISSN 0961-3218
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Bassioni, H A; Price, A D F and Hassan, T M (2005) Building a conceptual framework for measuring business performance in construction: An empirical evaluation. Construction Management and Economics, 23(5), pp. 495-507. ISSN 01446193
Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193
Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364
Bergström, M and Stehn, L (2005) Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden. Construction Management and Economics, 23(8), pp. 831-838. ISSN 01446193
Bernold, L E (2005) Automatic as-built generation with utility trenchers. Journal of Construction Engineering and Management, 131(6), pp. 740-747. ISSN 0733-9364
Bernold, L E (2005) Paradigm shift in construction education is vital for the future of our profession. Journal of Construction Engineering and Management, 131(5), pp. 533-539. ISSN 0733-9364
Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029
Blismas, N G; Pendlebury, M; Gibb, A and Pasquire, C (2005) Constraints to the use of off-site production on construction projects. Architectural Engineering and Design Management, 1(3), pp. 153-162. ISSN 1745-2007
Bogus, S M; Molenaar, K R and Diekmann, J E (2005) Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), pp. 1179-1185. ISSN 0733-9364
Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218
Bouchlaghem, D; Shang, H; Anumba, C J; Cen, M; Miles, J and Taylor, M (2005) ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), pp. 261-280. ISSN 1745-2007
Brady, T; Davies, A and Gann, D (2005) Can integrated solutions business models work in construction? Building Research & Information, 33(6), pp. 571-579. ISSN 0961-3218
Bresnen, M; Edelman, L; Newell, S; Scarbrough, H and Swan, J (2005) Exploring social capital in the construction firm. Building Research & Information, 33(3), pp. 235-244. ISSN 0961-3218
Bresnen, M; Goussevskaia, A and Swan, J (2005) Implementing change in construction project organizations: Exploring the interplay between structure and agency. Building Research & Information, 33(6), pp. 547-560. ISSN 0961-3218
Briscoe, G (2005) Women and minority groups in UK construction: Recent trends. Construction Management and Economics, 23(10), pp. 1001-1005. ISSN 01446193
Bröchner, J; Josephson, P E and Alte, J (2005) Identifying management research priorities. Construction Management and Economics, 23(8), pp. 793-796. ISSN 01446193
Byrne, J; Clarke, L and Van Der Meer, M (2005) Gender and ethnic minority exclusion from skilled occupations in construction: A Western European comparison. Construction Management and Economics, 23(10), pp. 1025-1034. ISSN 01446193
Caplan, A S and Gilham, J (2005) Included against the odds: Failure and success among minority ethnic built-environment professionals in Britain. Construction Management and Economics, 23(10), pp. 1007-1015. ISSN 01446193
Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364
Carrillo, P (2005) Lessons learned practices in the engineering, procurement and construction sector. Engineering, Construction and Architectural Management, 12(3), pp. 236-250. ISSN 09699988
Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364
Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364
Chan, A T S and Chan, E H W (2005) Impact of perceived leadership styles on work outcomes: Case of building professionals. Journal of Construction Engineering and Management, 131(4), pp. 413-422. ISSN 0733-9364
Chan, J K W; Tam, C M and Cheung, R (2005) Monitoring financial health of contractors at the aftermath of the Asian economic turmoil: A case study in Hong Kong. Construction Management and Economics, 23(5), pp. 451-458. ISSN 01446193
Chan, J K W; Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(2), pp. 111-124. ISSN 09699988
Chan, P; Cooper, R and Tzortzopoulos, P (2005) Organizational learning: Conceptual challenges from a project perspective. Construction Management and Economics, 23(7), pp. 747-756. ISSN 01446193
Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193
Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364
Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175
Chappells, H and Shove, E (2005) Debating the future of comfort: Environmental sustainability, energy consumption and the indoor environment. Building Research & Information, 33(1), pp. 32-40. ISSN 0961-3218
Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364
Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387
Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Chen, Z; Li, H and Wong, C T C (2005) Environalplanning: Analytic network process model for environmentally conscious construction planning. Journal of Construction Engineering and Management, 131(1), pp. 92-101. ISSN 0733-9364
Chen, Z; li, H; Kong, S C W and xu, Q (2005) A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5(1), pp. 27-39. ISSN 1471-4175
Cheng, E W L and Li, H (2005) Analytic network process applied to project selection. Journal of Construction Engineering and Management, 131(4), pp. 459-466. ISSN 0733-9364
Cheng, E W L; li, H and yu, L (2005) The analytic network process (ANP) approach to location selection: A shopping mall illustration. Construction Innovation, 5(2), pp. 83-97. ISSN 1471-4175
Cheng, L and Tiong, R L K (2005) Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics, 23(3), pp. 255-263. ISSN 01446193
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029
Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(2), pp. 140-154. ISSN 1726-0531
Choudhary, R; Papalambros, P Y and Malkawi, A (2005) A hierarchical design optimization approach for meeting building performance targets. Architectural Engineering and Design Management, 1(1), pp. 57-76. ISSN 1745-2007
Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364
Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364
Chung, J K H; Shen, G Q P; Leung, B Y P; Hao, J J L; Hills, M J; Fox, P W and Zou, P X W (2005) Using e-learning to deliver construction technology for undergraduate students. A case study in Hong Kong. Architectural Engineering and Design Management, 1(4), pp. 295-308. ISSN 1745-2007
Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms. Building Research & Information, 33(6), pp. 523-535. ISSN 0961-3218
Clements-Croome, D (2005) Designing the indoor environment for people. Architectural Engineering and Design Management, 1(1), pp. 45-55. ISSN 1745-2007
Cole, R J (2005) Building environmental assessment methods: Redefining intentions and roles. Building Research & Information, 33(5), pp. 455-467. ISSN 0961-3218
Cotton, A P; Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(6), pp. 617-632. ISSN 09699988
Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193
Cox, R F; Issa, R R A and Koblegard, K (2005) Management's perception of key behavioral indicators for construction. Journal of Construction Engineering and Management, 131(3), pp. 368-376. ISSN 0733-9364
Cuervo, J C and Pheng, L S (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(2), pp. 147-162. ISSN 01446193
Curwell, S; Deakin, M; Cooper, I; Paskaleva-Shapira, K; Ravetz, J and Babicki, D (2005) Citizens' expectations of information cities: Implications for urban planning and design. Building Research & Information, 33(1), pp. 55-66. ISSN 0961-3218
Dainty, A R J; Bryman, A; Price, A D F; Greasley, K; Soetanto, R and King, N (2005) Project affinity: The role of emotional attachment in construction projects. Construction Management and Economics, 23(3), pp. 241-244. ISSN 01446193
Dainty, A R J; Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: The perspective of small-medium-sized firms. Construction Management and Economics, 23(4), pp. 387-398. ISSN 01446193
Dansoh, A (2005) Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(2), pp. 163-168. ISSN 01446193
De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193
Delgado-Hernandez, D J and Aspinwall, E M (2005) Improvement tools in the UK construction industry. Construction Management and Economics, 23(9), pp. 965-977. ISSN 01446193
Dikmen, I; Birgonul, M T and Kiziltas, S (2005) Prediction of organizational effectiveness in construction companies. Journal of Construction Engineering and Management, 131(2), pp. 252-261. ISSN 0733-9364
Ding, G K C (2005) Developing a multicriteria approach for the measurement of sustainable performance. Building Research & Information, 33(1), pp. 3-16. ISSN 0961-3218
Du Plessis, C (2005) Action for sustainability: Preparing an African plan for sustainable building and construction. Building Research & Information, 33(5), pp. 405-415. ISSN 0961-3218
Dulaimi, M F; Nepal, M P and Park, M (2005) A hierarchical structural model of assessing innovation and project performance. Construction Management and Economics, 23(6), pp. 565-577. ISSN 01446193
Duncan, J (2005) Performance-based building: Lessons from implementation in New Zealand. Building Research & Information, 33(2), pp. 120-127. ISSN 0961-3218
Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364
Dunston, P S and Wang, X (2005) Mixed reality-based visualization interfaces for architecture, engineering, and construction industry. Journal of Construction Engineering and Management, 131(12), pp. 1301-1309. ISSN 0733-9364
Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364
Edwards, D J and Holt, G D (2005) Exposure to hand-arm vibration: Implications of new statutory requirements. Building Research & Information, 33(3), pp. 257-266. ISSN 0961-3218
Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175
Ekström, M A and Björnsson, H C (2005) Valuing flexibility in architecture, engineering, and construction information technology investments. Journal of Construction Engineering and Management, 131(4), pp. 431-438. ISSN 0733-9364
El-Diraby, T E and Kashif, K F (2005) Distributed ontology architecture for knowledge management in highway construction. Journal of Construction Engineering and Management, 131(5), pp. 591-603. ISSN 0733-9364
El-Diraby, T E and Wang, B (2005) Society portal: Integrating urban highway construction projects into the knowledge city. Journal of Construction Engineering and Management, 131(11), pp. 1196-1211. ISSN 0733-9364
El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364
El-Rayes, K and Hyari, K (2005) Optimal lighting arrangements for nighttime highway construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1292-1300. ISSN 0733-9364
El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364
El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364
Elazouni, A M; Ali, A E and Abdel-Razek, R H (2005) Estimating the acceptability of new formwork systems using neural networks. Journal of Construction Engineering and Management, 131(1), pp. 33-41. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364
Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Ellis, R C T; Wood, G D and Keel, D A (2005) Value management practices of leading UK cost consultants. Construction Management and Economics, 23(5), pp. 483-493. ISSN 01446193
Emmitt, S (2005) Integrating teaching and research in an architectural technology undergraduate model. Journal of Engineering, Design and Technology, 3(2), pp. 164-179. ISSN 1726-0531
Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Fadhil Dulaimi, M (2005) The challenge of customer orientation in the construction industry. Construction Innovation, 5(1), pp. 3-12. ISSN 1471-4175
Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364
Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387
Fisher, D J; Schluter, L and Toleti, P K (2005) Project management education and training process for career development. Journal of Construction Engineering and Management, 131(8), pp. 903-910. ISSN 0733-9364
Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 09699988
Francis, A and Skitmore, M (2005) Risk management within the electrical distribution supply industry in South East Queensland. Journal of Financial Management of Property and Construction, 10(1), pp. 45-54. ISSN 1366-4387
Fredericks, T K; Abudayyeh, O; Choi, S D; Wiersma, M and Charles, M (2005) Occupational injuries and fatalities in the roofing contracting industry. Journal of Construction Engineering and Management, 131(11), pp. 1233-1240. ISSN 0733-9364
Gambatese, J A; Behm, M and Hinze, J W (2005) Viability of designing for construction worker safety. Journal of Construction Engineering and Management, 131(9), pp. 1029-1036. ISSN 0733-9364
Gangwar, M and Goodrum, P M (2005) The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(8), pp. 851-859. ISSN 01446193
Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364
Georgy, M E; Chang, L M and Zhang, L (2005) Utility-function model for engineering performance assessment. Journal of Construction Engineering and Management, 131(5), pp. 558-568. ISSN 0733-9364
Gibb, A; Hide, S; Haslam, R; Gyi, D; Pavitt, T; Atkinson, S and Duff, R (2005) Construction tools and equipment: their influence on accident causality. Journal of Engineering, Design and Technology, 3(1), pp. 12-23. ISSN 1726-0531
Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364
Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(2), pp. 169-184. ISSN 01446193
Glass, J and Pepper, C (2005) Perceptions of precast concrete cladding in the UK market. Architectural Engineering and Design Management, 1(4), pp. 233-246. ISSN 1745-2007
Gomes, V and Da Silva, M G (2005) Exploring sustainable construction: Implications from Latin America. Building Research & Information, 33(5), pp. 428-440. ISSN 0961-3218
Goodrum, P M and Dai, J (2005) Differences in occupational injuries, illnesses, and fatalities among Hispanic and non-Hispanic construction workers. Journal of Construction Engineering and Management, 131(9), pp. 1021-1028. ISSN 0733-9364
Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364
Greed, C and Reeves, D (2005) Mainstreaming equality into strategic spatial policy making: Are town planners losing sight of gender? Construction Management and Economics, 23(10), pp. 1059-1070. ISSN 01446193
Green, S D; Fernie, S and Weller, S (2005) Making sense of supply chain management: A comparative study of aerospace and construction. Construction Management and Economics, 23(6), pp. 579-593. ISSN 01446193
Green, S D and May, S C (2005) Lean construction: Arenas of enactment, models of diffusion and the meaning of 'leanness'. Building Research & Information, 33(6), pp. 498-511. ISSN 0961-3218
Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387
Gruneberg, S and Hughes, W (2005) UK construction orders and output: A comparison of government and commercially available data 1995-2001. Journal of Financial Management of Property and Construction, 10(2), pp. 83-94. ISSN 1366-4387
Gunhan, S and Arditi, D (2005) Factors affecting international construction. Journal of Construction Engineering and Management, 131(3), pp. 273-282. ISSN 0733-9364
Gunhan, S and Arditi, D (2005) International expansion decision for construction companies. Journal of Construction Engineering and Management, 131(8), pp. 928-937. ISSN 0733-9364
Guo, K; Minchin, E and Ferragut, T (2005) The shift to warranties and performance specifications: What of method specifications? Construction Management and Economics, 23(9), pp. 953-963. ISSN 01446193
Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218
Han, S H; Diekmann, J E and Ock, J H (2005) Contractor's risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), pp. 283-292. ISSN 0733-9364
Hanna, A S; Menches, C L; Sullivan, K T and Sargent, J R (2005) Factors affecting absenteeism in electrical construction. Journal of Construction Engineering and Management, 131(11), pp. 1212-1218. ISSN 0733-9364
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Hari, S; Egbu, C and Kumar, B (2005) A knowledge capture awareness tool: An empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12(6), pp. 533-567. ISSN 09699988
Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364
Harty, C (2005) Innovation in construction: A sociology of technology approach. Building Research & Information, 33(6), pp. 512-522. ISSN 0961-3218
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193
Haupt, T C; Munshi, M and Smallwood, J (2005) HIV and AIDS in South African construction: Is age nothing but a number? Construction Management and Economics, 23(1), pp. 107-119. ISSN 01446193
Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364
Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364
Heron, E; Bowen, P and Lincoln, D (2005) Vandalism: A product of environmental design? Journal of Financial Management of Property and Construction, 10(3), pp. 181-191. ISSN 1366-4387
Hes, D; Morrison, A W and Bates, M (2005) Assessment and selection of materials for Melbourne city Council House 2. Construction Economics and Building, 5(2), pp. 8-19. ISSN 2204-9029
Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364
Hinze, J (2005) Use of trench boxes for worker protection. Journal of Construction Engineering and Management, 131(4), pp. 494-500. ISSN 0733-9364
Hinze, J; Huang, X and Terry, L (2005) The nature of struck-by accidents. Journal of Construction Engineering and Management, 131(2), pp. 262-268. ISSN 0733-9364
Ho, S P (2005) Bid compensation decision model for projects with costly bid preparation. Journal of Construction Engineering and Management, 131(2), pp. 151-159. ISSN 0733-9364
Horman, M J and Kenley, R (2005) Quantifying levels of wasted time in construction with meta-analysis. Journal of Construction Engineering and Management, 131(1), pp. 52-61. ISSN 0733-9364
Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364
Hosein, R and Lewis, T M (2005) Quantifying the relationship between aggregate GDP and construction value added in a small petroleum rich economy: a case study of Trinidad and Tobago. Construction Management and Economics, 23(2), pp. 185-197. ISSN 01446193
Hossain, J B and Kusakabe, K (2005) Sex segregation in construction organizations in Bangladesh and Thailand. Construction Management and Economics, 23(6), pp. 609-619. ISSN 01446193
Hsieh, H H Y (2005) The 1990s Taiwan residential construction boom: A supply side interpretation. Construction Management and Economics, 23(3), pp. 265-284. ISSN 01446193
Humphreys, M A (2005) Quantifying occupant comfort: Are combined indices of the indoor environment practicable? Building Research & Information, 33(4), pp. 317-325. ISSN 0961-3218
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Ibbs, W and Liu, M (2005) Improved measured mile analysis technique. Journal of Construction Engineering and Management, 131(12), pp. 1249-1256. ISSN 0733-9364
Ilozor, B D and Ilozor, D B (2005) Open-plan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531
Irizarry, J; Simonsen, K L and Abraham, D M (2005) Effect of safety and environmental variables on task durations in steel erection. Journal of Construction Engineering and Management, 131(12), pp. 1310-1319. ISSN 0733-9364
Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(2), pp. 215-223. ISSN 01446193
Ivory, C (2005) The cult of customer responsiveness: Is design innovation the price of a client-focused construction industry? Construction Management and Economics, 23(8), pp. 861-870. ISSN 01446193
Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Jin, X H and Ling, F Y Y (2005) Constructing a framework for building relationships and trust in project organizations: Two case studies of building projects in China. Construction Management and Economics, 23(7), pp. 685-696. ISSN 01446193
Jin, X H and Ling, F Y Y (2005) Model for fostering trust and building relationships in China's construction industry. Journal of Construction Engineering and Management, 131(11), pp. 1224-1232. ISSN 0733-9364
John, G A; Clements-Croome, D J; Fairey, V and Loy, H M (2005) Contextual prerequisites for the application of ILS principles to the building services industry. Engineering, Construction and Architectural Management, 12(4), pp. 307-328. ISSN 09699988
Kaatz, E; Root, D and Bowen, P (2005) Broadening project participation through a modified building sustainability assessment. Building Research & Information, 33(5), pp. 441-454. ISSN 0961-3218
Kadefors, A (2005) Fairness in interorganizational project relations: Norms and strategies. Construction Management and Economics, 23(8), pp. 871-878. ISSN 01446193
Kaiser, M J; Pulsipher, A G and Byrd, R C (2005) Cost of abrasive cutting in decommissioning operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 137-148. ISSN 0733-9364
Kaiser, M J; Pulsipher, A G and Martin, J (2005) Cost of site clearance and verification operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 117-126. ISSN 0733-9364
Kajewski, S L (2005) Multilevel formwork load distribution with posttensioned slabs. Journal of Construction Engineering and Management, 131(2), pp. 203-210. ISSN 0733-9364
Kale, S and Arditi, D (2005) Diffusion of computer aided design technology in architectural design practice. Journal of Construction Engineering and Management, 131(10), pp. 1135-1141. ISSN 0733-9364
Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: Development and evaluation. Building Research & Information, 33(4), pp. 326-337. ISSN 0961-3218
Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364
Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029
Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007
Kilian, J J and Gibson, G E (2005) Construction litigation for the U.S. Naval facilities engineering command, 1982-2002. Journal of Construction Engineering and Management, 131(9), pp. 945-952. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Critical path method with multiple calendars. Journal of Construction Engineering and Management, 131(3), pp. 330-342. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364
Kim, W S; Minh Tam, N and Jung, D H (2005) Experimental study on strength of cement stabilized clay. Journal of Engineering, Design and Technology, 3(2), pp. 116-126. ISSN 1726-0531
Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364
Kirkham, R J (2005) Re-engineering the whole life cycle costing process. Construction Management and Economics, 23(1), pp. 9-14. ISSN 01446193
Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193
Kishk, M; Pollock, R; Atta, J and Power, L (2005) A structured model for performance assessment in property management. Journal of Financial Management of Property and Construction, 10(3), pp. 159-170. ISSN 1366-4387
Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218
Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193
Kristiansen, K; Emmitt, S and Bonke, S (2005) Changes in the Danish construction sector: The need for a new focus. Engineering, Construction and Architectural Management, 12(5), pp. 502-511. ISSN 09699988
Kululanga, G K and Price, A D F (2005) Measuring quality of writing of construction specifications. Journal of Construction Engineering and Management, 131(8), pp. 859-865. ISSN 0733-9364
Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364
Kumaraswamy, M M; Rahman, M M; Ling, F Y Y and Phng, S T (2005) Reconstructing cultures for relational contracting. Journal of Construction Engineering and Management, 131(10), pp. 1065-1075. ISSN 0733-9364
Lam, K C; Hu, T S and Ng, S T (2005) Using the principal component analysis method as a tool in contractor pre-qualification. Construction Management and Economics, 23(7), pp. 673-684. ISSN 01446193
Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193
Larsen, G D (2005) Horses for courses: Relating innovation diffusion concepts to the stages of the diffusion process. Construction Management and Economics, 23(8), pp. 787-792. ISSN 01446193
Larsen, G D and Ballal, T M A (2005) The diffusion on innovations within a UKCI context: An explanatory framework. Construction Management and Economics, 23(1), pp. 81-91. ISSN 01446193
Larsson, N (2005) Regionalism and sustainable development: Genesis of SB04. Building Research & Information, 33(5), pp. 397-404. ISSN 0961-3218
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364
Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364
Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364
Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364
Lee, S H; Thomas, S R and Tucker, R L (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering and Management, 131(7), pp. 790-798. ISSN 0733-9364
Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193
Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193
Leung, M Y; Olomolaiye, P; Chong, A and Lam, C C Y (2005) Impacts of stress on estimation performance in Hong Kong. Construction Management and Economics, 23(9), pp. 891-903. ISSN 01446193
Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), pp. 459-471. ISSN 01446193
Ling, F Y Y; Ibbs, C W and Cuervo, J C (2005) Entry and business strategies used by international architectural, engineering and construction firms in China. Construction Management and Economics, 23(5), pp. 509-520. ISSN 01446193
Lingard, H (2005) Balancing study and paid work: The experiences of construction undergraduates in an Australian university. Construction Economics and Building, 5(1), pp. 41-47. ISSN 2204-9029
Lingard, H and Francis, V (2005) Does work-family conflict mediate the relationship between job schedule demands and burnout in male construction professionals and managers? Construction Management and Economics, 23(7), pp. 733-745. ISSN 01446193
Lingard, H and Francis, V (2005) The decline of the 'traditional' family: Work-life benefits as a means of promoting a diverse workforce in the construction industry of Australia. Construction Management and Economics, 23(10), pp. 1045-1057. ISSN 01446193
Lisø, K R; Kvande, T and Thue, J V (2005) High-performance weather-protective flashings. Building Research & Information, 33(1), pp. 41-54. ISSN 0961-3218
Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364
Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193
Lorenz, D; Lützkendorf, T and Panek, A (2005) Sustainable construction in central/eastern Europe: Implications from SB04 in warsaw. Building Research & Information, 33(5), pp. 416-427. ISSN 0961-3218
Love, P E D and Edwards, D J (2005) Taking the pulse of UK construction project managers' health: Influence of job demands, job control and social support on psychological wellbeing. Engineering, Construction and Architectural Management, 12(1), pp. 88-101. ISSN 09699988
Love, P E D; Edwards, D J and Smith, J (2005) Contract documentation and the incidence of rework in projects. Architectural Engineering and Design Management, 1(4), pp. 247-259. ISSN 1745-2007
Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364
Low, S P and Wu, M (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(8), pp. 815-829. ISSN 01446193
Lowe, D J and Leiringer, R (2005) Commercial management in project-based organisations. Journal of Financial Management of Property and Construction, 10(1), pp. 3-18. ISSN 1366-4387
Lueke, J S and Ariaratnam, S T (2005) Surface heave mechanisms in horizontal directional drilling. Journal of Construction Engineering and Management, 131(5), pp. 540-547. ISSN 0733-9364
Lützkendorf, T and Lorenz, D (2005) Sustainable property investment: Valuing sustainable buildings through property performance assessment. Building Research & Information, 33(3), pp. 212-234. ISSN 0961-3218
Lützkendorf, T and Speer, T M (2005) Alleviating asymmetric information in property markets: Building performance and product quality as signals for consumers. Building Research & Information, 33(2), pp. 182-195. ISSN 0961-3218
Macintosh, A and Steemers, K (2005) Ventilation strategies for urban housing: Lessons from a PoE case study. Building Research & Information, 33(1), pp. 17-31. ISSN 0961-3218
Matsumoto, I; Stapleton, J; Glass, J and Thorpe, T (2005) Developing a framework to measure organizational and employee skills development in a professional engineering design consultancy. Construction Innovation, 5(1), pp. 53-66. ISSN 1471-4175
Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 09699988
Mawdesley, M; Hernandez, O and Al-Jibouri, S (2005) A decision making model for infrastructure projects selection in developing countries. Journal of Financial Management of Property and Construction, 10(3), pp. 135-146. ISSN 1366-4387
Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364
McDermott, P; Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(1), pp. 19-32. ISSN 1366-4387
Meacham, B; Bowen, R; Traw, J and Moore, A (2005) Performance-based building regulation: Current situation and future needs. Building Research & Information, 33(2), pp. 91-106. ISSN 0961-3218
Miller, S; Haupt, T C and Chileshe, N (2005) Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(2), pp. 180-189. ISSN 1726-0531
Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: An alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(4), pp. 409-422. ISSN 01446193
Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364
Mohamed, Y and AbouRizk, S (2005) Application of the theory of inventive problem solving in tunnel construction. Journal of Construction Engineering and Management, 131(10), pp. 1099-1108. ISSN 0733-9364
Mohamed, Y and AbouRizk, S (2005) Technical knowledge consolidation using theory of inventive problem solving. Journal of Construction Engineering and Management, 131(9), pp. 993-1001. ISSN 0733-9364
Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364
Moore, D R and Abadi, M (2005) Virtual team working and associated technologies within the UK construction industry. Architectural Engineering and Design Management, 1(1), pp. 21-32. ISSN 1745-2007
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Motawa, I A (2005) A systematic approach to modelling change processes in construction projects. Construction Economics and Building, 5(1), pp. 23-31. ISSN 2204-9029
Naji, K K (2005) Virtual environments for improving construction site safety. Architectural Engineering and Design Management, 1(2), pp. 93-102. ISSN 1745-2007
Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364
Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364
Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364
Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193
Nesan, L J (2005) Factors influencing tacit knowledge in construction. Construction Economics and Building, 5(1), pp. 48-57. ISSN 2204-9029
Newton, R and Ormerod, M (2005) Do disabled people have a place in the UK construction industry? Construction Management and Economics, 23(10), pp. 1071-1081. ISSN 01446193
Ng, S T; Kong, H and Luu, C D T (2005) Capitalising experiential knowledge for guiding construction procurement selection. Construction Economics and Building, 5(1), pp. 32-40. ISSN 2204-9029
Ng, S T; Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(3), pp. 264-282. ISSN 09699988
Ngowi, A B and Pienaar, E (2005) Trust factor in construction alliances. Building Research & Information, 33(3), pp. 267-278. ISSN 0961-3218
Nicol, F and Roaf, S (2005) Post-occupancy evaluation and field studies of thermal comfort. Building Research & Information, 33(4), pp. 338-346. ISSN 0961-3218
Nyström, J (2005) The definition of partnering as a wittgenstein family-resemblance concept. Construction Management and Economics, 23(5), pp. 473-481. ISSN 01446193
O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364
Obonyo, E; Anumba, C and Thorpe, T (2005) Apron: An agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(4), pp. 329-350. ISSN 09699988
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387
Odubiyi, A O and Davidson, I E (2005) England and Wales electricity industry: experiences in deregulation. Journal of Engineering, Design and Technology, 3(1), pp. 24-29. ISSN 1726-0531
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Omar, I and Mncwango, S (2005) Sanitary landfill energy harnessing and applications. Journal of Engineering, Design and Technology, 3(2), pp. 127-139. ISSN 1726-0531
Ormerod, M G and Newton, R A (2005) Moving beyond accessibility: The principles of universal (inclusive) design as a dimension in nD modelling of the built environment. Architectural Engineering and Design Management, 1(2), pp. 103-110. ISSN 1745-2007
Ozorhon, B; Dikmen, I and Talat Birgonul, M (2005) Organizational memory formation and its use in construction. Building Research & Information, 33(1), pp. 67-79. ISSN 0961-3218
Packham, G; Miller, C J; Thomas, B C and Brooksbank, D (2005) An examination of the management challenges faced by growing SCEs in South Wales. Construction Innovation, 5(1), pp. 13-25. ISSN 1471-4175
Park, H S; Thomas, S R and Tucker, R L (2005) Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7), pp. 772-778. ISSN 0733-9364
Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis. Construction Innovation, 5(3), pp. 135-157. ISSN 1471-4175
Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364
Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: An empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(1), pp. 45-56. ISSN 01446193
Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193
Powl, A and Skitmore, M (2005) Factors hindering the performance of construction project managers. Construction Innovation, 5(1), pp. 41-51. ISSN 1471-4175
Pretorius, F; so, W M and Chau, K W (2005) An analysis of variable rate residential mortgage prepayment in Hong Kong using aggregate data. Journal of Financial Management of Property and Construction, 10(3), pp. 147-158. ISSN 1366-4387
Pries, F and Dorée, A (2005) A century of innovation in the Dutch construction industry. Construction Management and Economics, 23(6), pp. 561-564. ISSN 01446193
Pryke, S D (2005) Towards a social network theory of project governance. Construction Management and Economics, 23(9), pp. 927-939. ISSN 01446193
Pulaski, M H and Horman, M J (2005) Continuous value enhancement process. Journal of Construction Engineering and Management, 131(12), pp. 1274-1282. ISSN 0733-9364
Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364
Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193
Rahman, M M and Kumaraswamy, M M (2005) Relational selection for collaborative working arrangements. Journal of Construction Engineering and Management, 131(10), pp. 1087-1098. ISSN 0733-9364
Reichstein, T; Salter, A J and Gann, D M (2005) Last among equals: A comparison of innovation in construction, services and manufacturing in the UK. Construction Management and Economics, 23(6), pp. 631-644. ISSN 01446193
Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364
Riley, D R; Varadan, P; James, J S and Thomas, H R (2005) Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings. Journal of Construction Engineering and Management, 131(8), pp. 877-889. ISSN 0733-9364
Robinson, H S; Carrillo, P M; Anumba, C J and A-Ghassani, A M (2005) Review and implementation of performance management models in construction engineering organizations. Construction Innovation, 5(4), pp. 203-217. ISSN 1471-4175
Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2005) Knowledge management practices in large construction organisations. Engineering, Construction and Architectural Management, 12(5), pp. 431-445. ISSN 09699988
Rojas, E M and Mukherjee, A (2005) General-purpose situational simulation environment for construction education. Journal of Construction Engineering and Management, 131(3), pp. 319-329. ISSN 0733-9364
Rooke, J and Clark, L (2005) Learning, knowledge and authority on site: A case study of safety practice. Building Research & Information, 33(6), pp. 561-570. ISSN 0961-3218
Roy, R; Low, M and Waller, J (2005) Documentation, standardization and improvement of the construction process in house building. Construction Management and Economics, 23(1), pp. 57-67. ISSN 01446193
Ruikar, K; Anumba, C J and Carrillo, P M (2005) End-user perspectives on use of project extranets in construction organisations. Engineering, Construction and Architectural Management, 12(3), pp. 222-235. ISSN 09699988
Sacks, R; Navon, R; Brodetskaia, I and Shapira, A (2005) Feasibility of automated monitoring of lifting equipment in support of project control. Journal of Construction Engineering and Management, 131(5), pp. 604-614. ISSN 0733-9364
Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 09699988
Sawalhi, N and Enshassi, A (2005) Application of project time management tools and techniques to the construction industry in the Gaza Strip. Construction Economics and Building, 5(1), pp. 1-8. ISSN 2204-9029
Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364
Senaratne, S; Kagioglou, M; Amaratunga, D; Baldry, D; Aouad, G and Bowden, A (2005) Research knowledge transfer into teaching in the built environment. Engineering, Construction and Architectural Management, 12(6), pp. 587-600. ISSN 09699988
Sexton, M and Barrett, P (2005) Performance-based building and innovation: Balancing client and industry needs. Building Research & Information, 33(2), pp. 142-148. ISSN 0961-3218
Sexton, M; Goulding, J; Zhang, X; Kagioglou, M; Aouad, G; Cooper, R and Barrett, P (2005) The role of the hycon design-support tool in elevating hybrid concrete as a design option for structural frames. Engineering, Construction and Architectural Management, 12(6), pp. 568-586. ISSN 09699988
Shang, H; Anumba, C J; Bouchlaghem, D M; Miles, J C; Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(4), pp. 391-409. ISSN 09699988
Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364
Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364
Shash, A A (2005) Financial analysis for replacement of construction equipment in Saudi Arabia. Construction Economics and Building, 5(1), pp. 16-22. ISSN 2204-9029
Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007
Smyth, H (2005) Procurement push and marketing pull in supply chain management: The conceptual contribution of relationship marketing as a driver in project financial performance. Journal of Financial Management of Property and Construction, 10(1), pp. 33-44. ISSN 1366-4387
Smyth, H (2005) Trust in the design team. Architectural Engineering and Design Management, 1(3), pp. 211-223. ISSN 1745-2007
Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364
Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Spangenberg, S; Hannerz, H and Tüchsen, F (2005) Hospitalized injuries among bridge and tunnel construction workers. Construction Management and Economics, 23(3), pp. 237-240. ISSN 01446193
Spaulding, W M; Bridge, A and Skitmore, M (2005) The use of function analysis as the basis of value management in the Australian construction industry. Construction Management and Economics, 23(7), pp. 723-731. ISSN 01446193
Steele, A and Todd, S (2005) The future of the black and minority ethnic (BME) construction sector in England. Construction Management and Economics, 23(10), pp. 1017-1023. ISSN 01446193
Stewart, P; Robinson, J and Low, S (2005) The business case for sustainable design: the city of Melbourne CH2 project. Construction Economics and Building, 5(2), pp. 58-70. ISSN 2204-9029
Sturts, C S and Griffis, F H (2005) Addressing pricing: Value bidding for engineers and consultants. Journal of Construction Engineering and Management, 131(6), pp. 621-630. ISSN 0733-9364
Swaffield, J A (2005) Transient identification of defective trap seals. Building Research & Information, 33(3), pp. 245-256. ISSN 0961-3218
Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007
Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175
Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193
Tamate, S; Suemasa, N and Katada, T (2005) Analyses of instability in mobile cranes due to ground penetration by outriggers. Journal of Construction Engineering and Management, 131(6), pp. 689-704. ISSN 0733-9364
Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193
Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 09699988
Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364
Teo, E A L; Ling, F Y Y and Ong, D S Y (2005) Fostering safe work behaviour in workers at construction sites. Engineering, Construction and Architectural Management, 12(4), pp. 410-422. ISSN 09699988
Thomas, H R; Riley, D R and Messner, J I (2005) Fundamental principles of site material management. Journal of Construction Engineering and Management, 131(7), pp. 808-815. ISSN 0733-9364
Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(2), pp. 71-82. ISSN 1471-4175
Tookey, J E; Bowen, P A and Hardcastle, C (2005) Concurrent engineering: A comparison between the aerospace and construction industries. Journal of Engineering, Design and Technology, 3(1), pp. 44-55. ISSN 1726-0531
Trethewy, R W (2005) The effect of feedback on risk taking in the Australian construction industry. Journal of Engineering, Design and Technology, 3(2), pp. 109-115. ISSN 1726-0531
Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(2), pp. 173-181. ISSN 0961-3218
Tzortzopoulos, P; Sexton, M and Cooper, R (2005) Process models implementation in the construction industry: A literature synthesis. Engineering, Construction and Architectural Management, 12(5), pp. 470-486. ISSN 09699988
Ugwu, O O and Haupt, T C (2005) Key performance indicators for infrastructure sustainability: a comparative study between Hong Kong and South Africa. Journal of Engineering, Design and Technology, 3(1), pp. 30-43. ISSN 1726-0531
Uwakweh, B O (2005) Effect of foremen on construction apprentice. Journal of Construction Engineering and Management, 131(12), pp. 1320-1327. ISSN 0733-9364
Walsh, K D; Sawhney, A and Brown Iv, A (2005) International comparison of cost for the construction sector: Purchasing power parity. Journal of Construction Engineering and Management, 131(2), pp. 160-167. ISSN 0733-9364
Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218
Weinstein, M; Gambatese, J and Hecker, S (2005) Can design improve construction safety? Assessing the impact of a collaborative safety-in-design process. Journal of Construction Engineering and Management, 131(10), pp. 1125-1134. ISSN 0733-9364
Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193
Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364
Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 09699988
Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193
Wong, J T Y; Hui, E C M; Seabrooke, W and Raftery, J (2005) A study of the Hong Kong property market: Housing price expectations. Construction Management and Economics, 23(7), pp. 757-765. ISSN 01446193
Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364
Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193
Wu, X and Zhang, Z (2005) Input-output analysis of the Chinese construction sector. Construction Management and Economics, 23(9), pp. 905-912. ISSN 01446193
Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(4), pp. 431-441. ISSN 01446193
Xu, T; Tiong, R L K; Chew, D A S and Smith, N J (2005) Development model for competitive construction industry in the people's republic of China. Journal of Construction Engineering and Management, 131(7), pp. 844-853. ISSN 0733-9364
Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364
Yean Yng Ling, F (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(1), pp. 6-20. ISSN 09699988
Yilmaz, N and Donaldson, A B (2005) Consideration of wind barriers for an inner courtyard. Architectural Engineering and Design Management, 1(4), pp. 281-293. ISSN 1745-2007
Yiu, C Y; Ho, H K; Lo, S M and Hu, B Q (2005) Performance evaluation for cost estimators by reliability interval method. Journal of Construction Engineering and Management, 131(1), pp. 108-116. ISSN 0733-9364
Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193
Zayed, T M (2005) Productivity and cost assessment for continuous flight auger piles. Journal of Construction Engineering and Management, 131(6), pp. 677-688. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193
Zayed, T M and Halpin, D W (2005) Pile construction productivity assessment. Journal of Construction Engineering and Management, 131(6), pp. 705-714. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Zayed, T M; Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(8), pp. 839-850. ISSN 01446193
Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(4), pp. 373-390. ISSN 09699988
Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364
Zhang, X (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10), pp. 1054-1064. ISSN 0733-9364
Zhang, X (2005) Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131(6), pp. 631-644. ISSN 0733-9364
Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364
Zhang, X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), pp. 656-668. ISSN 0733-9364
Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364
Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364
Zou, P X W and Roslan, B A (2005) Different perspectives towards using web-based project management systems in construction: Large enterprises versus small- and medium-sized enterprises. Architectural Engineering and Design Management, 1(2), pp. 127-143. ISSN 1745-2007
li, H; yu, L and Cheng, E W L (2005) A GIS-based site selection system for real estate projects. Construction Innovation, 5(4), pp. 231-241. ISSN 1471-4175
ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(6), pp. 519-532. ISSN 09699988
Conference or Workshop Item
Abuharris, A and Ruddock, L (2005) Land-use planning and sustainable tourism development in Libya. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2005) Project managers' performance measures: A fresh perspective. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Balushi, R A; Fortune, C and Kaka, A (2005) The implementation of corporate strategies through the use of an enterprise project management model (epmm): The case of telecommunication operator. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Sharif, F and Kaka, A (2005) Private finance intiative project's financial modelling. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Sinaidi, A R (2005) Selecting the unit price bid: An analytical method. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Yami, A M and Price, A D F (2005) Exploring conceptual linkages between value engineering and sustainable construction. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Alkizim, A O and Green, S (2005) Robustness in value engineering. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ancell, D (2005) Reducing costs: A practical application of performance-based specification and transaction cost theories. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Angelides, D and Xenidis, Y (2005) A methodology for the development of a european approach concerning performance and risks of built systems. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Anisuddin, S and Khaleeq, S (2005) Deterioration and rehabilitation of concrete structures in hot and arid regions. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ankrah, N A and Proverbs, D (2005) A framework for measuring construction project performance: Overcoming key challenges of performance measurement. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Aranda-Mena, G; Blismas, N and Wakefield, R (2005) Factors affecting the uptake of e-business by small building enterprises. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Asad, S; Fuller, P; Pan, W and Dainty, A R J (2005) Learning to innovate in construction: A case study. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Baccarini, D and Kraus, F (2005) Influences on risk taking behaviour of property developers in perth, western Australia. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Bellamy, T; Williams, A; Sher, W; Sherratt, S and Gameson, R (2005) Design communication: Issues confronting both co-located and virtual teams. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Bhutto, K; Thorpe, T and Stephenson, P (2005) E-commerce and the construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Biggs, H C; Dingsdag, D P; Sheahan, V L and Stenson, N J (2005) The role of collaboration in defining and maintaining a safety culture: Australian perspectives in the construction sector. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Boyd, D; Xiao, H and Chinyio, E (2005) Can knowledge-event approach work in construction SMEs? In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Bula-Diaz, C; Dainty, A and Burns, N (2005) The employment relationship of site and office-based managers in SME construction firms. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Burcar, I and Radujkovic, M (2005) Risk registers in construction in Croatia. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Castell, L (2005) Empowering the client in the briefing process. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chan, P W; Abbott, C; Cooper, R and Aouad, G (2005) Building future scenarios: A reflection for the research agenda. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chan, P W and Cooper, R (2005) Passion for learning: Consider the project mission. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chang, C Y (2005) Recent development of uk construction products sector: Evidence from microdata. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chau, K W and Wang, Y S (2005) An analyseis of productivity growth in the construction industry: A non-parametric approach. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chen, Y and Kamara, J M (2005) The use of mobile computing in construction information management. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Cheng, J; Proverbs, D G; Oduoza, C and Fleming, C (2005) A conceptual model towards the measurement of construction client satisfaction. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chileshe, N (2005) PhD in construction management research: What is original contribution to knowledge? The case of TQM. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chileshe, N; Watson, P; Maslow, D and Belokorovin, E (2005) The deployment of total quality management (TQM): The Russian experience. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chow, L K and Ng, S T (2005) Establishing a quantitaive performance evaluation framework through fuzzy membership functions. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ciribizni, A and Galimberti, G (2005) H&S planning and 4D project scheduling. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Davey, L M J and London, K (2005) An ethnographic study of knowledge management practices within an Australian market leader: An organizational culture perspective. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ellabbar, K and Havard, T (2005) The accounting disclosure in developing countries: A comparative study of Libyan & Egyptian construction companies. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Erdogan, B; Anumba, C; Bouchlaghem, D and Nielsen, Y (2005) Change management in construction: The current context. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Faisol, N; Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Farrell, P and Middlemass, R (2005) Barriers to disabled students in built environment degree programmes. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gorse, C A and Emmitt, S (2005) Group interaction research methods. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Goyal, S; Pitt, M and Sapri, M (2005) Innovation as a facilities management tool. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, B and Thomas, K (2005) An investigation into the development of knowledge management systems within the leading Irish construction companies. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, S (2005) Sustainable building design: A systematic approach. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gruneberg, S (2005) The performance of major firms in the heating and ventilating industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Hassan, P F; Griffith, A and Stephenson, P (2005) An empirical study of the training needs of site managers within the uk construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Hassouna, R (2005) Viability of applying the public private partnership (PPP) strategy to the libyan construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Hatush, Z; Saleh, S and Shiki, A (2005) Effect of critical delay factors on cost: Overrun during the design stage. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Håkansson, H and Jahre, M (2005) Economic logics in the construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kanagasabapathi, B and Ananthanarayanan, K (2005) A simulation model for resource constrained scheduling of multiple projects. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kang, J; Cheah, C Y J and Chew, D A S (2005) Strategic analysis of large chinese construction enterprises. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kappia, J G; Dainty, A R J and Price, A D F (2005) An assessment of construction craft trainee career priorities through the analytical hierarchy process. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kasim, N B; Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Katavic, M; Matic, S and Ceric, A (2005) The engineer's education in business and construction management. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kaya, S; Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Khalfan, M M A; McDermott, P and Maqsood, T (2005) Achieving supply chain integration through demand and supply management. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kheni, N A; Dainty, A R J and Gibb, A G F (2005) Health and safety management practices of small subcontractors. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Koseoglu, O O and Nielsen, Y (2005) Mobile computing in construction projects; assessing feasibility. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kridan, A B and Goulding, J S (2005) Change management and human resource management as potential success areas for knowledge management implementation within the Libyan banking sector. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Krima, N; Aouad, G; Hatush, Z and Baldry, D (2005) An assessment model: The efficiency of consultants when dealing with delays in construction projects in Libya. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kwawu, W and Hughes, W (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Leung, A Y T; Xu, J and Ge, J X (2005) Analysis of dynamical impacts of interest rate on expected housing price. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Leung, B Y P and Hui, E C M (2005) Pricing of pre-sale properties with construction uncertainties. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Lichtenberg, J (2005) Slimbouwen®: A strategy for innovation. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Liyanage, C; Egbu, C and Tookey, J (2005) Investigating the current state of infection control practices in domestics services in the national health service in Scotland: A case study approach. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Mahdiputra, S; Giddings, B; Hogg, K and Daws, M (2005) Investigating learning in construction organizations. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Maqsood, T; Walker, D H T and Finegan, A D (2005) The role of knowledge management in enhancing knowledge pull in the construction organisation to deliver innovation: A case study. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Matipa, W M and Siamuzwe, V M M (2005) Information and communication technology (ICT) supported supply chain management: Benefits for construction business in landlocked developing nations. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Modeen, T; Pasquire, C and Soar, R (2005) Ubiquitous customization: Utilizing rapid manufacturing in the production of design and architecture. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Mootanah, D (2005) Researching whole life value methodologies for construction. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Myrtveit, I and Stensrud, E (2005) Identifying high performance construction projects. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Nanayakkara, L (2005) An empirically grounded framework for human resource management in the Sri Lankan construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ng, A K W and Price, A D F (2005) Assessing the impact of main contractor's site co-ordination on sub-contractors' performance in Hong Kong. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ochieng, E and Price, A D F (2005) Integration and cultural engineering on projects in developing countries (Kenya). In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Odeyinka, H A; Davison, C and Olomolaiye, A (2005) An assessment of factors inhibiting designers from complying with health and safety regulations in their design. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Oloke, D; Manase, D and Olomolaiye, P (2005) Construction health and safety (H&S) performance: A conceptual framework for enhancing information and communication technology (ICT) impacts. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Olomolaiye, A and Egbu, C (2005) The impact of human resource policies and practices on knowledge management in the construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Powell, A; Dainty, A R J; Bagilhole, B M and Neale, R H (2005) Coping in construction: Female students' perspectives. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Render, N; Greenwood, D and Edge, J (2005) The other g.M.P: Good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Rutter, D and Gidado, K (2005) PFI projects: Their scope for delivering vfm. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Salama, M; Kaka, A and Leishman, C (2005) The relationship between the performance of the economy and the cost of construction of educational buildings in Egypt: A preliminary study. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Sapri, M and Pitt, M (2005) Performance measurement in facilities management; state of knowledge. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Sharp, M; Jones, K and Clarke, R (2005) An investigation into inefficiency in the condition based maintenance process. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Shearman, J; Hughes, W P; Gilchrist, R and Elwazani, S (2005) Strategies for reducing construction problems on archaeological sites. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Sheibani, G and Havard, T (2005) The government role in housing in libya during the period 1970: 2000. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Shih, R C S; Gayley, A and Doro-on, A M (2005) Risk analysis of terrorism on U.S. Cargo transportation infrastructure. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Suchocki, M (2005) Knowledge identification within the information infrastructure of a large multidisciplinary consultant. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Tang, C M and Leung, A Y T (2005) An impartial decision model for financial risk and decision analysis in construction projects. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2005) A GA-based borrowing strategy for construction smes in Hong Kong. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Tennant, S and Langford, D (2005) Construction management teams & project performance: A diagnostic toolkit. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Toole, T M (2005) A project management causal loop diagram. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wall, J and Ahmed, V (2005) Issues in developing a blended learning initiative to meet continuing professional development needs of construction professionals in Ireland. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wamuziri, S and Abu-Shaaban, N (2005) Potential of reverse auctions in construction procurement. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wandahl, S (2005) Power, interest and value in building project organisations. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ward, P (2005) The socl's delay and disruption protocol and the Australian construction industry. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Waters, J; Neale, R; Hutson, S and Mears, K (2005) A perceptual assessment of personal safety in relation to university campus facilities. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
White, A S (2005) Public sector tendering: Issues and analysis. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wolbers, M; Evans, R J E; Holmes, M; Pasquire, C L and Price, A D F (2005) Construction management and lean thinking in highways maintenance. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wong, P S P and Cheung, S O (2005) From monitoring to learning: A conceptual framework. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yitmen, I and Alibaba, H Z (2005) An investigation of self-sustaining finance systems for property development in North Cyprus. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yu, H; Oloke, D; Proverbs, D and Buckley, K (2005) Improving health and safty in construction: A knowledge-based approach. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Zaneldin, E (2005) Construction claims in the united arab emirates: Types, causes, and frequency. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Zeng, J; An, M and Chan, A H C (2005) A fuzzy reasoning decision making approach based multi-expert judgement for construction project risk analysis. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Šelih, J (2005) Improvement of construction and demolition (C&D) waste management on construction sites. In: Khosrowshahi, F. (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Thesis
Abadi, M (2005) Issues and challenges in communication within design teams in the construction industry: Investigation the use of virtual teams and information and communication technologies in the UK construction industry. Unpublished PhD thesis, University of Manchester, UK.
Abanomi, W M (2005) Environmental design of prototype school buildings in hot, arid regions with special reference to Riyadh, Saudi Arabia. Unpublished PhD thesis, Cardiff University, UK.
Abidin, N Z (2005) Using value management to improve the consideration of sustainability within construction. Unpublished PhD thesis, Loughborough University, UK.
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. Unpublished PhD thesis, Northumbria University, UK.
Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. Unpublished PhD thesis, University of Salford, UK.
Al-Atawi, S (2005) An ICT framework to improve the tendering process in the governmental construction sector in the Kingdom of Saudi Arabia. Unpublished PhD thesis, University of Salford, UK.
Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. Unpublished PhD thesis, University of Liverpool, UK.
Al-Qalyuby, H A (2005) Inductive learning methodology using OSHA construction accident and citation data. Unpublished PhD thesis, Wayne State University, USA.
Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains. Unpublished PhD thesis, University of California, Berkeley, USA.
Awad, A M (2005) The interaction between project finance of a large-scale construction project and macroeconomic indicators and policies. Unpublished PhD thesis, University of Nottingham, UK.
Aziz, Z (2005) Context-aware information delivery for mobile construction workers. Unpublished PhD thesis, Loughborough University, UK.
Bavi, R (2005) The development of a model design-build specification document for educational facilities construction projects. Unpublished EdD thesis, Wilmington College (Delaware), USA.
Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. Unpublished PhD thesis, University of Texas Austin, USA.
Benne, B C (2005) Managing AEC project organizations at the edge of chaos: An analysis of AEC projects' adaptive capacity from a living systems perspective. Unpublished PhD thesis, University of California, Berkeley, USA.
Bennett, W J (2005) Experiences of women in the nontraditional skilled construction trades. Unpublished PhD thesis, Walden University, USA.
Beynon, K S (2005) Dispute resolution and access to justice, with particular reference to the construction industry in the United Kingdom. Unpublished PhD thesis, Swansea University, UK.
Bohne, R A (2005) Eco-efficiency and performance strategies in construction and demolition waste recycling systems. Unpublished PhD thesis, Norges teknisk-naturvitenskapelige universitet, Norway.
Bowden, S L (2005) Application of mobile IT in construction. Unpublished EngD thesis, Loughborough University, UK.
Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Butler, C J (2005) The relationship between emotional intelligence and transformational leadership behavior in construction industry leaders. Unpublished PhD thesis, University of Colorado at Boulder, USA.
Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing. Unpublished PhD thesis, Heriot-Watt University, UK.
Champion, R (2005) Acceleration in construction and engineering contracts. Unpublished PhD thesis, University of London, UK.
Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. Unpublished PhD thesis, Heriot-Watt University, UK.
Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chen, C (2005) Entry strategies for international construction markets. Unpublished PhD thesis, The Pennsylvania State University, USA.
Chen, P (2005) An interpretive comparison of Chinese and western conceptions of project management work. Unpublished PhD thesis, Cranfield University, UK.
Cheng, J (2005) A simulation access language and framework with applications to project management. Unpublished PhD thesis, Stanford University, USA.
Cheng, Y (2005) Development of bridge management systems using fuzzy case-based reasoning. Unpublished PhD thesis, Kansas State University, USA.
Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. Unpublished PhD thesis, Queensland University of Technology, Australia.
Chong, W K O (2005) Construction production rate information system for highway projects. Unpublished PhD thesis, University of Texas Austin, USA.
Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. Unpublished PhD thesis, University of Texas at Austin, USA.
Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. Unpublished PhD thesis, University of Manchester, UK.
Cui, Q (2005) A dynamic model for profitability analysis of construction firms: Towards complexity, learning, and uncertainty. Unpublished PhD thesis, Purdue University, USA.
Delgado-HernaÌndez, D J (2005) A framework for building quality into construction projects. Unpublished PhD thesis, University of Birmingham, UK.
Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. Unpublished PhD thesis, University of Edinburgh, UK.
El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. Unpublished PhD thesis, University of Salford, UK.
Eliufoo, H K (2005) Knowledge creation and transfer in construction organisations in Tanzania. Published PhD thesis, KTH Royal Institute of Technology, Sweden.
Emhemed, A E (2005) Comprehensive approach to housing legislation: with reference to housing in Libya. Unpublished PhD thesis, Heriot-Watt University, UK.
Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. Unpublished PhD thesis, Carnegie Mellon University, USA.
Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden. Published PhD thesis, KTH Royal Institute of Technology, Sweden.
Fee, S T (2005) Sustainable construction practices: Contractors' perceptions of awareness and participation. Unpublished PhD thesis, Indiana State University, USA.
Fernie, S (2005) Making sense of supply chain management in UK construction organisations: theory versus practice. Unpublished PhD thesis, Loughborough University, UK.
Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. Unpublished PhD thesis, London School of Economics and Political Science, UK.
Gluch, P (2005) Building green: perspectives on environmental mangagement in construction. Unpublished PhD thesis, Chalmers University of Technology, Sweden.
Goh, Y M (2005) A case-based reasoning approach to construction safety risk assessment. Unpublished PhD thesis, National University of Singapore, Singapore.
Graham, D P (2005) Stochastic modelling and analysis of construction processes. Unpublished PhD thesis, University of Edinburgh, UK.
Gunderson, D E (2005) Needs assessment: Construction management doctoral programs in the United States. Unpublished PhD thesis, Colorado State University, USA.
Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. Unpublished PhD thesis, Purdue University, USA.
Hassan, P F (2005) A best practice framework for training UK construction site managers. Unpublished PhD thesis, Sheffield Hallam University, UK.
Hong, T (2005) Life-cycle cost assessment model of composite materials in construction. Unpublished PhD thesis, Purdue University, USA.
Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. Unpublished PhD thesis, Stanford University, USA.
Huang, C (2005) The development of an integrated paradigm and a decision support framework for IT innovation adoption. Unpublished PhD thesis, University of Reading, UK.
Humphrey, S D (2005) Construction procurement and profit: an analysis of the relationship from a contractor's perspective. Unpublished PhD thesis, Loughborough University, UK.
Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept. Unpublished PhD thesis, Illinois Institute of Technology, USA.
Ireland, P N (2005) Supply chain management in construction: an analysis of the appropriateness of proactive supply chain management thinking for the construction industry. Unpublished PhD thesis, University of Birmingham, UK.
Irizarry, J (2005) Safety issues in steel erection: Impact on task durations and risk perception of ironworkers. Unpublished PhD thesis, Purdue University, USA.
Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. Unpublished PhD thesis, University of Dundee, UK.
Jen, H (2005) Web-based construction process simulation framework. Unpublished PhD thesis, Purdue University, USA.
Jeong, K S (2005) Good practice transfer within small construction specialist trade contractors. Unpublished PhD thesis, University of Salford, UK.
Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. Unpublished PhD thesis, University of Florida, USA.
Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.
Kam, C K H (2005) Dynamic decision breakdown structure: Ontology, methodology, and framework for information management in support of decision-enabling tasks in the building industry. Unpublished PhD thesis, Stanford University, USA.
Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. Unpublished PhD thesis, Heriot-Watt University, UK.
Koskelo, T M (2005) A method for strategic technical life cycle management of real estates. Unpublished DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Laepple, E S (2005) Exploring project collaboration systems in the building industry. Unpublished PhD thesis, Texas A&M University, USA.
Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. Unpublished PhD thesis, Cardiff University, UK.
Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Larsen, G D (2005) A polymorphic framework for understanding the diffusion of innovations. Unpublished PhD thesis, University of Reading, UK.
Lau, H-l (2005) Trust relations in the construction industry. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Lee, J (2005) Value analysis of Wi-Fi agent functions in construction. Unpublished PhD thesis, North Carolina State University, USA.
Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Liang, L (2005) Small project benchmarking. Unpublished PhD thesis, University of Texas at Austin, USA.
Lin, K-Y (2005) Knowledge-assisted retrieval of online product information in A/E/C (architecture/engineering/construction). Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Liu, J (2005) Organisational learning of risk management for Chinese contractors. Unpublished PhD thesis, University of Reading, UK.
Liu, Y M (2005) A holistic approach to developing generic vs. regionally specific frameworks for sustainable building tools. Unpublished PhD thesis, University of New South Wales, Australia.
Lu, S L (2005) A theory of innovation in small knowledge-intensive professional service firms. Unpublished PhD thesis, University of Salford, UK.
Lundin, J A (2005) Safety in case of fire: The effect of changing regulations. Unpublished PhD thesis, Lund Universitet, Sweden.
Magent, C S (2005) A process and competency-based approach to high performance building design. Unpublished PhD thesis, The Pennsylvania State University, USA.
Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. Unpublished PhD thesis, University of Manchester, UK.
Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. Published PhD thesis, KTH Royal Institute of Technology, Sweden.
Meniru, K C U (2005) Computer-aided conceptual building design. Unpublished PhD thesis, Concordia University, Canada.
Milani, B (2005) Building materials in a green economy: Community-based strategies for dematerialization. Unpublished PhD thesis, University of Toronto, Canada.
Mohundro, W R (2005) Lease purchase financing: The processes and impact on new school construction in Texas. Unpublished EdD thesis, University of North Texas, USA.
Mojahed, S (2005) A project improvement system for effective management of construction projects. Unpublished PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Moylan, W A (2005) Building ethics in construction partnerships: An analysis of values-based leadership. Unpublished PhD thesis, Capella University, USA.
Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. Unpublished PhD thesis, University of Washington, USA.
Munifi, A (2005) An analysis of construction demand in Saudi Arabia. Unpublished PhD thesis, University College London, UK.
Mutti, C d N (2005) The drivers of Brazilian contractors' competitiveness in the international market. Unpublished PhD thesis, University of Reading, UK.
Najib, T (2005) Investigation of success factors for smaller engineering firms. Unpublished PhD thesis, Wayne State University, USA.
Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. Unpublished PhD thesis, University of Colorado at Boulder, USA.
Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. Unpublished PhD thesis, University of Alberta, Canada.
Ojiako, G U (2005) Project failures: A comparative study of information and communication technologies (ICT) and construction projects. Unpublished PhD thesis, University of Northumbria at Newcastle, UK.
Orr, R J (2005) Unforeseen conditions and costs on global projects: Learning to cope with unfamiliar institutions, embeddedness and emergent uncertainty. Unpublished PhD thesis, Stanford University, USA.
Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model. Unpublished PhD thesis, Northumbria University, UK.
Panthaworn, P (2005) An exploratory study of motivation of management personnel in the heavy construction industry. Unpublished PhD thesis, The University of Texas at Austin, USA.
Pepper, C (2005) A critical evaluation of diversity and equality in the UK construction sector. Unpublished PhD thesis, Loughborough University, UK.
Petersen, A K (2005) Integrating risk management into the undergraduate construction management curriculum: An investigation into the effect of zero tolerance, 360-degree feedback and competition within a world wide web assisted construction project-based learning environmen. Unpublished PhD thesis, University of Portsmouth, UK.
Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. Unpublished PhD thesis, London South Bank University, UK.
Price, M (2005) State prevailing wage laws and construction labor markets. Unpublished PhD thesis, The University of Utah, USA.
Pritchard, C (2005) Skin cancer prevention in the house building industry. Unpublished PhD thesis, Nottingham Trent University, UK.
Pulaski, M H (2005) The alignment of sustainability and constructability: A continuous value enhancement process. Unpublished PhD thesis, Pennsylvania State University, USA.
Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance. Unpublished PhD thesis, University of Florida, USA.
Pérez, Z G (2005) Appropriate designs and appropriating irrigation systems : Irrigation infrastructure development and users' management capability in Bolivia. Unpublished PhD thesis, Wageningen University and Research, The Netherlands.
Rechenthin, D E (2005) Project management and safety: Attribution theory as it applies to project safety. Unpublished DBA thesis, Nova Southeastern University, USA.
Reichert, J (2005) Will change management master the challenge of introducing the Eurocodes to the UK? Unpublished PhD thesis, University of London, University College London, UK.
Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. Unpublished PhD thesis, Texas A&M University, USA.
Roshani, D (2005) Integrated collaborative building design using internet technology. Unpublished PhD thesis, University of Nottingham, UK.
Ross, A D (2005) A model of contingency factors affecting contractors' economic organisation of projects. Unpublished PhD thesis, University of Salford, UK.
Salgado, C A (2005) Construction project organizational structuring. Unpublished PhD thesis, University of Maryland, College Park, USA.
Salminen, J (2005) Measuring performance and determining success factors of construction sites. Published PhD thesis, Helsinki University of Technology, Finland.
Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. Unpublished PhD thesis, University of Salford, UK.
Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. Unpublished PhD thesis, University of Alberta, Canada.
Soliman, E M (2005) Delay hierarchy propagation model. Unpublished PhD thesis, University of Plymouth, UK.
Song, J (2005) Tracking the location of materials on construction projects. Unpublished PhD thesis, The University of Texas at Austin, USA.
Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. Unpublished PhD thesis, University of Texas at Austin, USA.
Stenis, J (2005) Industrial management models with emphasis on construction waste. Published PhD thesis, Lund University, Sweden.
Sylvie, J R (2005) Developing best practices for industrial project life cycle security and a methodology for measuring implementation. Unpublished PhD thesis, The University of Texas at Austin, USA.
Takim, R (2005) A framework for successful construction project performance. Unpublished PhD thesis, Glasgow Caledonian University, UK.
Tan, J Y (2005) Coordinated budget allocation in multi-district highway agencies. Unpublished PhD thesis, National University of Singapore, Singapore.
Tang, Z (2005) Developing complete conditional probability tables from fractional data for Bayesian belief networks in engineering decision making. Unpublished PhD thesis, University of Toronto, Canada.
Tantele, E A (2005) Optimisation of preventative maintenance strategies for reinforced concrete bridges. Unpublished PhD thesis, University of Surrey, UK.
Thiel, D J (2005) Builders: the social organisation of a construction site. Unpublished PhD thesis, London School of Economics and Political Science (University of London), UK.
Thompson, N E (2005) Business excellence: lessons for the construction industry. Unpublished PhD thesis, Loughborough University, UK.
Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems. Unpublished PhD thesis, University of California, Berkeley, USA.
Tuomela, A (2005) Network service organisation: interaction in workplace networks. Published PhD thesis, Helsinki University of Technology, Finland.
Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications. Unpublished PhD thesis, University of Alberta, Canada.
Verheij, J M (2005) Process-mediated planning of AEC projects through structured dialogues. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction. Unpublished PhD thesis, University of Florida, USA.
Wafai, M H M H (2005) Developing a methodology for technology transfer of advanced IT solutions in the construction sector. Unpublished PhD thesis, University of Salford, UK.
Walewski, J A (2005) International project risk assessment. Unpublished PhD thesis, University of Texas at Austin, USA.
Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. Unpublished PhD thesis, University of Missouri - Columbia, USA.
Wellings, F (2005) The rise of the national housebuilder: A history of British housebuilders through the twentieth century. Unpublished PhD thesis, University of Liverpool, UK.
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. Unpublished PhD thesis, University of Newcastle upon Tyne, UK.
Woo, J-H (2005) Sharing tacit design knowledge in a distributed design environment. Unpublished PhD thesis, Texas A&M University, USA.
Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. Unpublished PhD thesis, National University of Singapore, Singapore.
Xie, H (2005) User model-driven architecture for information retrieval in construction project management. Unpublished PhD thesis, University of Florida, USA.
Yasin, M F (2005) A taxonomy and analysis of the relationship between changes in material technology and construction productivity. Unpublished PhD thesis, University of Kentucky, USA.
Yeomans, S G (2005) ICT-enabled collaborative working methodologies in construction. Unpublished EngD thesis, Loughborough University, UK.
Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process. Unpublished PhD thesis, University of Calgary, Canada.