Items where Year is 2002
Ababutain, A Y (2002) A multi-criteria decision-making model for selection of BOT toll road proposals within the public sector. Unpublished PhD thesis, University of Pittsburgh, USA.
Abdelhamid, T S and Everett, J G (2002) Physiological demands during construction work. Journal of Construction Engineering and Management, 128(5), pp. 427-437. ISSN 0733-9364
Abeid, J and Arditi, D (2002) Time-lapse digital photography applied to project management. Journal of Construction Engineering and Management, 128(6), pp. 530-535. ISSN 0733-9364
Abraham, G L (2002) Identification of critical success factors for construction organizations in the architectural /engineering /construction (A/E/C) industry. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Adriaanse, A M and Voordijk, H (2002) Information richness in construction projects: A critical social theory. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Akinci, B; Fischer, M and Kunz, J (2002) Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management, 128(4), pp. 306-315. ISSN 0733-9364
Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364
Al-Fadhala, M M (2002) Uncertainty-based condition assessment of existing concrete structures. Unpublished PhD thesis, University of Maryland, College Park, USA.
Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents. Unpublished PhD thesis, Illinois Institute of Technology, USA.
Al-Sinaidi, A A (2002) Computation of construction contractor capability. Unpublished PhD thesis, Florida Institute of Technology, USA.
Alshawi, M and Faraj, I (2002) Integrated construction environments: Technology and implementation. Construction Innovation, 2(1), pp. 33-51. ISSN 1471-4175
Alves, N M F and Bártolo, P J S (2002) Reversing design through computer vision. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
Andersen, M (2002) Light distribution through advanced fenestration systems. Building Research & Information, 30(4), pp. 264-281. ISSN 0961-3218
Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193
Aoieong, R T; Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: Model development. Construction Management and Economics, 20(2), pp. 179-192. ISSN 01446193
Aouad, G F; Sun, M and Faraj, I (2002) Automatic generation of data representations for construction applications. Construction Innovation, 2(3), pp. 151-165. ISSN 1471-4175
Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364
Arditi, D; Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), pp. 353-364. ISSN 01446193
Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364
Ariaratnam, S T and MacLeod, C W (2002) Financial outlay modeling for a local sewer rehabilitation strategy. Journal of Construction Engineering and Management, 128(6), pp. 486-495. ISSN 0733-9364
Ashton, P and Gidado, K (2002) The identification of uncertainty and risk associated with inadequate site investigation procedures relative to project complexity. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Atkinson, A R (2002) The pathology of building defects; a human error approach. Engineering, Construction and Architectural Management, 9(1), pp. 53-61. ISSN 0969-9988
Attia, T M (2002) The impact of communication technologies on group problem-solving performance in construction. Unpublished PhD thesis, North Carolina State University, USA.
Augenbroe, G; Verheij, H and Schwarzm Ller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(3), pp. 259-271. ISSN 0969-9988
Austin, S A; Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(3), pp. 249-258. ISSN 0969-9988
Awakul, P and Ogunlana, S O (2002) The effect of attitudinal differences on interface conflicts in large scale construction projects: A case study. Construction Management and Economics, 20(4), pp. 365-377. ISSN 01446193
Awil, A U; Rashid, A and Aziz, A (2002) International markets: Malaysian construction contractors and the stage theory. Construction Economics and Building, 2(1), pp. 94-106. ISSN 2204-9029
Aye, L; Bamford, N; Charters, B and Robinson, J (2002) The carbon footprint of a new commercial building. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Balina, C M (2002) Using labor productivity data to evaluate the application of lean principles to the concrete construction process. Unpublished PhD thesis, Pennsylvania State University, USA.
Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988
Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. Unpublished PhD thesis, Loughborough University, UK.
Bastien, A N (2002) Successful organisational and human practices in the UK construction industry: proposing the CONSTRUCT framework of good practice. Unpublished PhD thesis, University of Warwick, UK.
Battikha, M G (2002) Qualicon: Computer-based system for construction quality management. Journal of Construction Engineering and Management, 128(2), pp. 164-173. ISSN 0733-9364
Bausman, D C (2002) An empirical investigation of the relationship between strategic planning and performance of large construction firms. Unpublished PhD thesis, Heriot-Watt University, UK.
Benmansour, C and Hogg, K (2002) An investigation into the barriers to innovation and their relevance within the construction sector. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Bentivegna, V; Curwell, S; Deakin, M; Lombardi, P; Mitchell, G and Nijkamp, P (2002) A vision and methodology for integrated sustainable urban development: Bequest. Building Research & Information, 30(2), pp. 83-94. ISSN 0961-3218
Bernold, L E (2002) Spatial integration in construction. Journal of Construction Engineering and Management, 128(5), pp. 400-408. ISSN 0733-9364
Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364
Bidarianzadeh, G R and Fortune, C J (2002) Lean thinking and the delivery of sustainable construction projects. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Birgonul, M T; Ozdogan, I D and Ataoglu, T (2002) Organizational learning as a performance driver in construction companies. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Björk, B (2002) A formalised model of the information and materials handling activities in the construction process. Construction Innovation, 2(3), pp. 133-149. ISSN 1471-4175
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. Unpublished PhD thesis, University of Liverpool, UK.
Boes, H; Dorée, A and Veen, B v d (2002) First evaluation of new scheme for design-construct procurement in the Netherlands. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Borthwick, F (2002) The impact of the European Construction Products Directive on UK construction product manufacturers. Unpublished PhD thesis, De Montfort University, UK.
Bossink, B A G (2002) A Dutch public-private strategy for innovation in sustainable construction. Construction Management and Economics, 20(7), pp. 633-642. ISSN 01446193
Bowen, P A; Cattel, K S; Hall, K A; Edwards, P J and Pearl, R G (2002) Perceptions of time, cost and quality management on building projects. Construction Economics and Building, 2(2), pp. 48-56. ISSN 2204-9029
Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. Unpublished PhD thesis, Loughborough University, UK.
Boyd, D and Belcher, R (2002) Learning to change in the UK and USA. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Bresnen, M and Swan, J (2002) Understanding the implementation of new management initiatives in the construction firm. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Bröchner, J; Josephson, P E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(6), pp. 392-400. ISSN 0961-3218
Bártolo, H M G and Bártolo, P J S (2002) Borrowing from nature to support architectural design. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Cabahug, R R; Golding, P; Edwards, D J and Nicholas, J (2002) Cognitive 'visual' processing and manual dexterity: The influence of eye-to-hand coordination on a plant operator’s aptitude. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Carmichael, S (2002) The development of implementation processes for partnering in construction. Unpublished PhD thesis, University of Salford, UK.
Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Unpublished PhD thesis, The University of Texas at Austin, USA.
Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. Unpublished PhD thesis, George Mason University, USA.
Chakravarty, S (2002) Essays on contracting in the construction industry. Unpublished PhD thesis, University of Southern California, USA.
Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, P (2002) Factors affecting labour productivity in the construction industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, S L (2002) Responses of selected economic indicators to construction output shocks: The case of Singapore. Construction Management and Economics, 20(6), pp. 523-533. ISSN 01446193
Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364
Chang, C Y and Ive, G (2002) Rethinking the multi-attribute utility approach based procurement route selection technique. Construction Management and Economics, 20(3), pp. 275-284. ISSN 01446193
Chang, C-Y (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. Unpublished PhD thesis, University College London, UK.
Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. Unpublished PhD thesis, Columbia University, USA.
Chang, S-W (2002) Development and assessment of the Tier II work force strategy implementation index. Unpublished PhD thesis, The University of Texas at Austin, USA.
Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. Unpublished PhD thesis, University of Florida, USA.
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. Unpublished PhD thesis, Columbia University, USA.
Cheung, F K T; Kuen, J L F and Skitmore, M (2002) Multi-criteria evaluation model for the selection of architectural consultants. Construction Management and Economics, 20(7), pp. 569-580. ISSN 01446193
Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193
Cheung, S O; Suen, H C H and Lam, T I (2002) Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5), pp. 409-417. ISSN 0733-9364
Chew, M Y L (2002) Resistance of polyurethane sealants to hot water. Building Research & Information, 30(5), pp. 367-371. ISSN 0961-3218
Chiang, R (2002) Agency and incentive contract in private investment of transport project: An exploration of fundamental relationships. Unpublished PhD thesis, Massachusetts Institute of Technology, USA.
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175
Chua, D K H and Li, G M (2002) RISim: Resource-interacted simulation modeling in construction. Journal of Construction Engineering and Management, 128(3), pp. 195-202. ISSN 0733-9364
Cioffi, J; Wilkes, L and Hartcher-O'Brien, J (2002) Outdoor workers and sun protection: Knowledge and behaviour. Construction Economics and Building, 2(2), pp. 10-14. ISSN 2204-9029
Cooper, I (2002) Transgressing discipline boundaries: Is bequest an example of 'the new production of knowledge'? Building Research & Information, 30(2), pp. 116-129. ISSN 0961-3218
Corry, S J (2002) A collective profile: Meaning in the built environment among designers, managers and users with a mobility disability. Unpublished PhD thesis, Washington State University, USA.
Cox, A and Ireland, P (2002) Managing construction supply chains: The common sense approach. Engineering, Construction and Architectural Management, 9(5-6), pp. 409-418. ISSN 0969-9988
Cozens, P; Waters, J and Neale, R (2002) A virtual reality approach to personal safety and the design of built environment facilities. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Craig, D (2002) A model for customer-focused culture change in the speculative house-building industry: Executive summary. Unpublished EngD thesis, University of Warwick, UK.
Craighill, A L (2002) Lifecycle assessment and evaluation of construction and demolition waste management. Unpublished PhD thesis, University of East Anglia, UK.
Cui, X (2002) Delay time modelling and software development. Unpublished PhD thesis, University of Salford, UK.
Curlee, W (2002) Modern virtual project management: The effects of a centralized and decentralized project management office. Unpublished DM thesis, University of Phoenix, USA.
Dado, E (2002) ICT-enabled communication and co-operation in large-scale on -site construction projects. Unpublished PhD thesis, Technische Universiteit Delft (The Netherlands), The Netherlands.
Davey, C L; Powell, J A; Powell, J E and Cooper, I (2002) Action learning in a medium-sized construction company. Building Research & Information, 30(1), pp. 5-15. ISSN 0961-3218
Dawood, N N and Dalakleidis, G D A (2002) Industrial review and development of a cost management system for the Greek construction industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
De Haan, J; Voordijk, H and Joosten, G J (2002) Market strategies and core capabilities in the building industry. Construction Management and Economics, 20(2), pp. 109-118. ISSN 01446193
De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
De Silva, D G (2002) Asymmetries in procurement auctions. Unpublished PhD thesis, The University of Oklahoma, USA.
De Wilde, P; Augenbroe, G and Van Der Voorden, M (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(3), pp. 192-208. ISSN 0969-9988
Deakin, M; Huovila, P; Rao, S; Sunikka, M and Vreeker, R (2002) The assessment of sustainable urban development. Building Research & Information, 30(2), pp. 95-108. ISSN 0961-3218
Del Caño, A and De La Cruz, M P (2002) Integrated methodology for project risk management. Journal of Construction Engineering and Management, 128(6), pp. 473-485. ISSN 0733-9364
Devapriya, K A K and Ganesan, S (2002) Technology transfer through subcontracting in developing countries. Building Research & Information, 30(3), pp. 171-182. ISSN 0961-3218
Devapriya, K A K and Pretorius, F I H (2002) Project finance in Asia: Governing variables of past, present, and future pf arrangements in power projects. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Dickens, G (2002) Teamworking, perceptions and communication within construction projects. Unpublished PhD thesis, University of Nottingham, UK.
Drew, D; Kwong, C; Zou, P and Shen, L Y (2002) Determining the optimal fee-technical proposal combination in two envelope fee bidding. Construction Economics and Building, 2(2), pp. 1-9. ISSN 2204-9029
Drew, D S; Lai, P Y; Li, H and Lo, H P (2002) Correcting the fee-technical score variability imbalance in two-envelope fee tendering. Construction Management and Economics, 20(2), pp. 157-166. ISSN 01446193
Drew, D S; Shen, L Y and Zou, P X W (2002) Developing an optimal bidding strategy in two-envelope fee bidding. Construction Management and Economics, 20(7), pp. 611-620. ISSN 01446193
Drew D.S, T S L Y (2002) Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. Construction Management and Economics, 20(1), pp. 67-81. ISSN 01446193
Dubois, A and Gadde, L E (2002) The construction industry as a loosely coupled system: Implications for productivity and innovation. Construction Management and Economics, 20(7), pp. 621-631. ISSN 01446193
Dulaimi, M F; Ling, F Y Y; Ofori, G and De Silva, N (2002) Enhancing integration and innovation in construction. Building Research & Information, 30(4), pp. 237-247. ISSN 0961-3218
Dulaimi, M F and Shan, H G (2002) The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore. Construction Management and Economics, 20(7), pp. 601-610. ISSN 01446193
Dunlop, P G and Smith, S D (2002) Simulation analysis of the UK concrete delivery and placement process: A tool for planners. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Edum-Fotwe, F T; Gregory, M J; Thorpe, A; Cooper, R and Deasley, P J (2002) Managing distributed design teams and processes: A cross-sector study of construction and aerospace. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Edwards, D J; Holt, G D and Harris, F C (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20(7), pp. 581-591. ISSN 01446193
Egbu, C O; Gaskell, C and Howes, J (2002) The improvement of teamworking through the exploitation of IT: Lessons from the construction, manufacturing and finance sectors. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Eksteen, B and Bate, G (2002) The effects of construction on the environment: A case study. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Eksteen, B and Krause, S (2002) Constructing new automotive production facilities in a mature brownfield site. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers. Unpublished PhD thesis, Stanford University, USA.
El-Higzi, F A (2002) Foreign market selection factors in the Australian construction services sector. Construction Economics and Building, 2(1), pp. 107-120. ISSN 2204-9029
El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193
Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193
English, J (2002) Managing cultural differences to improve industrial efficiency. Building Research & Information, 30(3), pp. 196-204. ISSN 0961-3218
Erman, E (2002) Timber joint design: The geometric breakdown method. Building Research & Information, 30(6), pp. 446-469. ISSN 0961-3218
Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors. Unpublished PhD thesis, University of Liverpool, UK.
Fang, Z (2002) Behavioral analysis of project team performance in China. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Ford, D N (2002) Achieving multiple project objectives through contingency management. Journal of Construction Engineering and Management, 128(1), pp. 30-39. ISSN 0733-9364
Ford, D N; Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), pp. 343-351. ISSN 01446193
Formoso, C T; Soibelman, L; De Cesare, C and Isatto, E L (2002) Material waste in building industry: Main causes and prevention. Journal of Construction Engineering and Management, 128(4), pp. 316-325. ISSN 0733-9364
Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988
Fox, S; Marsh, L and Cockerham, G (2002) How building design imperatives constrain construction productivity and quality. Engineering, Construction and Architectural Management, 9(5-6), pp. 378-387. ISSN 0969-9988
Francis, V (2002) Supportive organizations: Assessing their effect on civil engineers. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Francis, V and Lingard, H (2002) The case for family-friendly work practices in the Australian construction industry. Construction Economics and Building, 2(1), pp. 28-36. ISSN 2204-9029
Fredericks, T; Abudayyeh, O; Palmquist, M and Torres, H N (2002) Mechanical contracting safety issues. Journal of Construction Engineering and Management, 128(2), pp. 186-193. ISSN 0733-9364
Freire, J and Alarcón, L F (2002) Achieving lean design process: Improvement methodology. Journal of Construction Engineering and Management, 128(3), pp. 248-256. ISSN 0733-9364
Fuller, R J and Luther, M B (2002) Thermal simulation of an Australian university building. Building Research & Information, 30(4), pp. 255-263. ISSN 0961-3218
Galha Bartolo, H M (2002) The application of repertory grid techniques to the assessment of users' perceptions of design quality construction. Unpublished PhD thesis, University of Reading, UK.
Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ge, X J and Lam, K-C (2002) Building a house prices forecasting model in Hong Kong. Construction Economics and Building, 2(2), pp. 57-70. ISSN 2204-9029
Gehrig, G B (2002) A decision support system framework to improve design-construction integration and project performance on public sector underground utility projects. Unpublished PhD thesis, Colorado State University, USA.
Glagola, C R and Sheedy, W M (2002) Partnering on defense contracts. Journal of Construction Engineering and Management, 128(2), pp. 127-138. ISSN 0733-9364
Godby, C J (2002) A computational study of lexicalized noun phrases in English. Unpublished PhD thesis, The Ohio State University, USA.
Gomar, J E; Haas, C T and Morton, D P (2002) Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management, 128(2), pp. 103-109. ISSN 0733-9364
Gomez, C P (2002) A study of the situated practice of benchmarking in the UK construction industry. Unpublished PhD thesis, University of Birmingham, UK.
Goodrum, P M and Haas, C T (2002) Partial factor productivity and equipment technology change at activity level in U.S. Construction industry. Journal of Construction Engineering and Management, 128(6), pp. 463-472. ISSN 0733-9364
Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193
Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2002) Interaction characteristics of successful contractors' representatives. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Goulding, J S and Alshawi, M (2002) Generic and specific IT training: A process protocol model for construction. Construction Management and Economics, 20(6), pp. 493-505. ISSN 01446193
Graham, T E (2002) Infrastructure engineering evaluation and assessment using geographic information system and the analytic hierarchy process: A cross-discipline approach. Unpublished DEng thesis, Morgan State University, USA.
Greene, A (2002) Group and individual decision-making in project risk management. Unpublished PhD thesis, Loughborough University, UK.
Greene, A; Thorpe, A and Austin, S A (2002) As likely as not it could happen: Linguistic interpretations of risk. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Gruneberg, S and Ive, G (2002) The relationship between the aggregate annual wage bills of heating and ventilation contractors, heating and ventilation industry output and construction industry output. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Gunduz, M (2002) Change orders impact assessment for labor intensive construction. Unpublished PhD thesis, University of Wisconsin - Madison, USA.
Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364
Gurung, N and Mahendran, M (2002) Comparative life cycle costs for new steel portal frame building systems. Building Research & Information, 30(1), pp. 35-46. ISSN 0961-3218
Gussias, A (2002) Service life management of concrete harbour structures. Unpublished DrIng thesis, Norges teknisk-naturvitenskapelige universitet, Norway.
Gyampoh-Vidogah, R (2002) Improving project administration in the construction industry using EDMS: an integrated IS/IT solution. Unpublished PhD thesis, University of Wolverhampton, UK.
Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364
Haas, C T and Kim, Y (2002) Automation in infrastructure construction. Construction Innovation, 2(3), pp. 191-210. ISSN 1471-4175
Hajjar, D and AbouRizk, S M (2002) Unified modeling methodology for construction simulation. Journal of Construction Engineering and Management, 128(2), pp. 174-185. ISSN 0733-9364
Hakkarainen, T E (2002) Studies on fire safety assessment of construction products. Unpublished DSc(Tech) thesis, Tampereen Teknillinen Korkeakoulu, Finland.
Hamilton, A; Mitchell, G and Yli-Karjanmaa, S (2002) The BEQUEST toolkit: A decision support system for urban sustainability. Building Research & Information, 30(2), pp. 109-115. ISSN 0961-3218
Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors. Unpublished PhD thesis, Nottingham Trent University, UK.
Hanna, A S; Camlic, R; Peterson, P A and Nordheim, E V (2002) Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1), pp. 57-64. ISSN 0733-9364
Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364
Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Hassanain, M A (2002) Integrated systems for maintenance management. Unpublished PhD thesis, University of British Columbia, Canada.
Haynes, W A (2002) An exploration of the nexus of the public and private sectors in the project management organizations for two boston megaprojects: The central artery/tunnel project and the Boston Harbor cleanup. Unpublished PhD thesis, Northeastern University, USA.
Healy, J; Ryan, W; Stewart, S and Stewart, R (2002) Training needs analysis in an SME in the Irish construction industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Heintz, J L (2002) Collaborative design planning networks. Engineering, Construction and Architectural Management, 9(3), pp. 181-191. ISSN 0969-9988
Heywood, C; Missingham, G and Kenley, R (2002) Strategic issues for facility provision: A re-examination of the nimby phenomenon. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction Management and Economics, 20(2), pp. 143-156. ISSN 01446193
Holmen, E; Veen, B v d and Dorée, A G (2002) Inter-organizational relationships in construction: Present lack of consensus and inspiration for further research. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Hong, X (2002) A comparative study of contractor performance based on Japanese, UK and US construction practice. Unpublished PhD thesis, University of Wolverhampton, UK.
Huang, C; Fisher, N and Broyd, T (2002) Development of a triangular TPC model to support adoption of construction integrated system. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Hutchings, D M (2002) An investigation of management practices used in small-volume home building companies of the United States. Unpublished PhD thesis, Texas A&M University, USA.
Hwee Lim, E N G and Yean Yng Ling, F (2002) Model for predicting clients' contribution to project success. Engineering, Construction and Architectural Management, 9(5-6), pp. 388-395. ISSN 0969-9988
IbañezGuzmán, J and Malcolm, A A (2002) Autonomous vehicles in the construction process. Construction Innovation, 2(3), pp. 211-224. ISSN 1471-4175
Idrus A.B, N J B (2002) Construction related factors influencing the choice of concrete floor systems. Construction Management and Economics, 20(1), pp. 13-19. ISSN 01446193
Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. Unpublished PhD thesis, Kungliga Tekniska Hogskolan, Sweden.
Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364
Jackson, S (2002) Development of a tool for whole life design appraisal. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. Unpublished PhD thesis, The University of Wisconsin - Madison, USA.
Jaselskis, E J; Kurtenbach, J M and Forrest, J (2002) Enhancing financial success among electrical contractors. Journal of Construction Engineering and Management, 128(1), pp. 65-75. ISSN 0733-9364
Jefferies, M; Chen, S E and Conway, J (2002) Assessment of professional competence in a construction management problem-based learning setting. Construction Economics and Building, 2(1), pp. 47-56. ISSN 2204-9029
Jefferies, M; Gameson, R O D and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: Reflections from the stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), pp. 352-361. ISSN 0969-9988
Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Johnson, P (2002) A quantitative assessment of knowledge and perceptions of civil engineering. Unpublished PhD thesis, Purdue University, USA.
Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988
Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364
Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kale, S and Arditi, D (2002) Competitive positioning in United States construction industry. Journal of Construction Engineering and Management, 128(3), pp. 238-247. ISSN 0733-9364
Kalil, A J (2002) Use of a work sampling method (TVEA) to characterize determinants of particulate exposure in heavy and highway construction. Unpublished DSc thesis, University of Massachusetts Lowell, USA.
Kam, C-k C (2002) The exploration of a multi-dimensional safe behaviour model for construction workers in Hong Kong: A structural equation modelling approach. Unpublished PhD thesis, University of Hull, UK.
Kamara, J M; Augenbroe, G; Anumba, C J and Carrillo, P M (2002) Knowledge management in the architecture, engineering and construction industry. Construction Innovation, 2(1), pp. 53-67. ISSN 1471-4175
Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364
Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364
Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kashiwagi, D T and Byfield, R (2002) Minimizing political influence in performance contracting case studies. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364
Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kelly, J and Hunter, K (2002) Using value management techniques to set up partnering agreements. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kempton, J; Chapman, K and Alani, A M (2002) Surveyor element lifetime predictions and the anchoring and adjustment heuristic. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kerali, A G and Thomas, T H (2002) Effect of mix retention and curing on low-cement walling blocks. Building Research & Information, 30(5), pp. 362-366. ISSN 0961-3218
Kestle, L; London, K; Bodger, P and Storey, B (2002) The development of a typology for remote construction projects. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Khosrowshahi, F (2002) Project cost-time optimal solutions. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kim, C-S (2002) An information model for real-time project cost integration. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation. Unpublished PhD thesis, The University of Texas at Austin, USA.
Kim, H (2002) Knowledge discovery and machine learning in construction project databases. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. Unpublished PhD thesis, Stanford University, USA.
Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level. Unpublished PhD thesis, The University of Texas at Austin, USA.
Kim, Y-W (2002) The implications of a new production paradigm for project cost control. Unpublished PhD thesis, University of California, Berkeley, USA.
Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. Unpublished PhD thesis, Loughborough University, UK.
Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach. Unpublished PhD thesis, Nottingham Trent University, UK.
Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. Unpublished PhD thesis, University of Liverpool, UK.
Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193
Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988
Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2002) A generic database for whole life costing applications in construction. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364
Knos, C T (2002) Investigating the effects of insurance industry standards on public building inspection departments in Florida, Georgia, and South Carolina. Unpublished DPA thesis, University of Georgia, USA.
Koch, C and Marton, J (2002) Implementing multiskilled teams on the construction site: Developing a scandinavian model? In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Koch, C and Simonsen, R (2002) Seeping in? Embankment of product innovations in urban renewal. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Koch, C and Thuesen, C (2002) Knowledge management in contractors: Developing communities of practice to support the re-use of knowledge. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kohler, N (2002) The relevance of bequest: An observer's perspective. Building Research & Information, 30(2), pp. 130-138. ISSN 0961-3218
Kohler, N and Hassler, U (2002) The building stock as a research object. Building Research & Information, 30(4), pp. 226-236. ISSN 0961-3218
Kohler, N and Lützkendorf, T (2002) Integrated life-cycle analysis. Building Research & Information, 30(5), pp. 338-348. ISSN 0961-3218
Koksal, A (2002) Predicting the development of decline in construction companies. Unpublished PhD thesis, Illinois Institute of Technology, USA.
Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(4), pp. 315-321. ISSN 01446193
Kreitl, G; Urschitz, G and Oberndorfer, W J (2002) Corporate growth of engineering consulting firms: A European review. Construction Management and Economics, 20(5), pp. 437-448. ISSN 01446193
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. Unpublished DEng thesis, Texas A&M University, USA.
Kululanga, G K; Price, A D F and McCaffer, R (2002) Empirical investigation of construction contractors' organizational learning. Journal of Construction Engineering and Management, 128(5), pp. 385-391. ISSN 0733-9364
Kumaraswamy, M M and Morris, D A (2002) Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93-102. ISSN 0733-9364
Kumaraswamy, M M and Shrestha, G B (2002) Targeting 'technology exchange' for faster organizational and industry development. Building Research & Information, 30(3), pp. 183-195. ISSN 0961-3218
Kus, R H and Nygren, K (2002) Microenvironmental characterization of rendered autoclaved aerated concrete. Building Research & Information, 30(1), pp. 25-34. ISSN 0961-3218
Kwak, Y H (2002) Analyzing asian infrastructure development privatization market. Journal of Construction Engineering and Management, 128(2), pp. 110-116. ISSN 0733-9364
Laan, A; Leuven, A v; Kolkman, S and Voordijk, H (2002) It in construction: Aligning it and business strategies. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Laar, M and Grimme, F W (2002) German developments in daylight guidance systems: An overview. Building Research & Information, 30(4), pp. 282-301. ISSN 0961-3218
Lam, K C; Cheung, S O; Tang, C M and Ng, S T (2002) Capital budgeting evaluation practices of building contractors in Hong Kong. Construction Economics and Building, 2(1), pp. 81-93. ISSN 2204-9029
Lee, A (2002) The development of a project process evaluation (PPE) framework that aims to measure the effectiveness of implementing a new design and construction project process. Unpublished PhD thesis, University of Salford, UK.
Lee, E B; Roesler, J; Harvey, J T and Ibbs, C W (2002) Case study of urban concrete pavement reconstruction on Interstate 10. Journal of Construction Engineering and Management, 128(1), pp. 49-56. ISSN 0733-9364
Lee, J M; Anumba, C J; Gibb, A G and Agbasi, E (2002) The current status of the cladding sector and its opportunities for computer-integrated manufacture (CIM). In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Li, B; Akintoye, A and Hardcastle, C (2002) Risks and risk treatments in public private partnership projects. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Li, H and Shen, Q (2002) Supporting the decision-making process for sustainable housing. Construction Management and Economics, 20(5), pp. 387-390. ISSN 01446193
Ling, Y Y (2002) Model for predicting performance of architects and engineers. Journal of Construction Engineering and Management, 128(5), pp. 446-455. ISSN 0733-9364
Lingard, H (2002) The effect of first aid training on Australian construction workers' occupational health and safety knowledge and motivation to avoid work-related injury or illness. Construction Management and Economics, 20(3), pp. 263-273. ISSN 01446193
Lingard, H and Sublet, A (2002) The impact of job and organizational demands on marital or relationship satisfaction and conflict among Australian civil engineers. Construction Management and Economics, 20(6), pp. 507-521. ISSN 01446193
Lockley, S R; Watson, R and Shaaban, S (2002) Managing e-commerce in construction: Revolution or e-business as usual? Engineering, Construction and Architectural Management, 9(3), pp. 232-240. ISSN 0969-9988
Loosemore, M and Teo, M M M (2002) The crisis management practices of Australian construction companies. Construction Economics and Building, 2(2), pp. 15-26. ISSN 2204-9029
Loosemore M, C D W (2002) Racial discrimination towards Asian operatives in the Australian construction industry. Construction Management and Economics, 20(1), pp. 91-102. ISSN 01446193
Lopes, J (2002) Characteristics of the main institutional actors in the Portuguese construction industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Lopes, J; Ruddock, L and Ribeiro, F L (2002) Investment in construction and economic growth in developing countries. Building Research & Information, 30(3), pp. 152-159. ISSN 0961-3218
Loria Arcila, J H (2002) Major issues impacting affordable housing developments in Mexico. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364
Love, P E D; Holt, G D and Li, H (2002) Triangulation in construction management research. Engineering, Construction and Architectural Management, 9(4), pp. 294-303. ISSN 0969-9988
Love, P E D; Irani, Z; Cheng, E and Li, H (2002) A model for supporting inter-organizational relations in the supply chain. Engineering, Construction and Architectural Management, 9(1), pp. 2-15. ISSN 0969-9988
Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. Unpublished PhD thesis, University of Florida, USA.
Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364
Macmillan, S; Steele, J; Kirby, P; Spence, R and Austin, S (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(3), pp. 174-180. ISSN 0969-9988
Mahdi, I M; Riley, M J; Fereig, S M and Alex, A P (2002) A multi-criteria approach to contractor selection. Engineering, Construction and Architectural Management, 9(1), pp. 29-37. ISSN 0969-9988
Mahmoud, S Y and Scott, S (2002) The development and use of key performance indicators by the UK construction industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Maldonado-Fortunet, F (2002) Sustainable development criteria for the evaluation of highway projects. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Maloney, W F (2002) Construction product/service and customer satisfaction. Journal of Construction Engineering and Management, 128(6), pp. 522-529. ISSN 0733-9364
Manley, K and Marceau, J (2002) Integrated manufacturing-services businesses in the Australian building and construction sector. Construction Economics and Building, 2(1), pp. 1-12. ISSN 2204-9029
Maor, I (2002) Conceptual design and selection of HVAC&r systems by combining knowledge based expert system with a building energy simulation program. Unpublished PhD thesis, Drexel University, USA.
Maqsood, T and Akintoye, A (2002) Supply chain management: More than a new name for management of relationships. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. Unpublished PhD thesis, University of Teesside, UK.
Marasini, R and Dawood, N (2002) Integration of genetic algorithms and simulation for stockyard layout planning. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. Unpublished PhD thesis, Concordia University, Canada.
Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193
Matsumoto, I T; Thorpe, A; Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: A case study of teamwork 2001. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Mawdesley, M J; A-Jibouri, S H; Askew, W H and Patterson, D E (2002) A model for the automated generation of earthwork planning activities. Construction Innovation, 2(4), pp. 249-268. ISSN 1471-4175
Mawdesley, M J; Al-jibouri, S H and Yang, H (2002) Genetic algorithms for construction site layout in project planning. Journal of Construction Engineering and Management, 128(5), pp. 418-426. ISSN 0733-9364
McCabe, B; AbouRizk, S and Gavin, J (2002) Time of sampling strategies for asphalt pavement quality assurance. Journal of Construction Engineering and Management, 128(1), pp. 85-89. ISSN 0733-9364
McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2002) Implications for the effect of standardization and pre-assembly on health, safety and accident causality: Preliminary results. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
McWilliam, R C (2002) The evolution of British standards. Unpublished PhD thesis, University of Reading, UK.
Meng, X (2002) Guarantees for contractor's performance and owner's payment in China. Journal of Construction Engineering and Management, 128(3), pp. 232-237. ISSN 0733-9364
Mills, A; Smith, J and Love, P (2002) Barriers to the development of SMEs in the Australian construction industry. Construction Economics and Building, 2(2), pp. 71-79. ISSN 2204-9029
Mills, A J (2002) Client and contractor attitudes to prequalification and selection processes for construction work. Unpublished PhD thesis, University of Melbourne, Australia.
Mohamed, S (2002) Safety climate in construction site environments. Journal of Construction Engineering and Management, 128(5), pp. 375-384. ISSN 0733-9364
Mohamed, Y (2002) A framework for systematic improvement of construction systems. Unpublished PhD thesis, University of Alberta, Canada.
Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(3), pp. 222-231. ISSN 0969-9988
Moore, D R and Dainty, A R J (2002) Criticizing the 'techniques of communication' approach: A response. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Motiar Rahman, M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: Moving towards joint risk management. Engineering, Construction and Architectural Management, 9(2), pp. 131-151. ISSN 0969-9988
Mrad, F; Asem Abdul-Malak, M; Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(4), pp. 325-335. ISSN 0969-9988
Mukherjee, A; Hoare, D and Hoare, J (2002) Selection of research methodology for phd researchers working with an organization. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Mund, A T (2002) An evaluation framework for exterior envelope wall systems for the homebuilding industry. Unpublished PhD thesis, Arizona State University, USA.
Mutti, C d N and Hughes, W (2002) Cash flow management in construction firms. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ng, A K W and Price, A D F (2002) Optimizing the performance of sub-contractors in building construction projects in Hong Kong. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ng, S T; Luu, D T; Chen, S E and Lam, K C (2002) Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(3), pp. 285-296. ISSN 01446193
Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029
Ngai, S C; Drew, D S; Lo, H P and Skitmore, M (2002) A theoretical framework for determining the minimum number of bidders in construction bidding competitions. Construction Management and Economics, 20(6), pp. 473-482. ISSN 01446193
Ngowi, A B; Iwisi, D S and Mushi, R J (2002) Competitive strategy in a context of low financial resources. Building Research & Information, 30(3), pp. 205-211. ISSN 0961-3218
Nicolini, D (2002) In search of 'project chemistry'. Construction Management and Economics, 20(2), pp. 167-177. ISSN 01446193
Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2002) Constructability concepts in west port highway in Malaysia. Journal of Construction Engineering and Management, 128(4), pp. 348-356. ISSN 0733-9364
Nunlee, M P (2002) Reputation as a control mechanism for opportunistic behavior in supply chains. Unpublished PhD thesis, University of Illinois at Urbana-Champaign, USA.
Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ofori, G (2002) Singapore's construction: Moving toward a knowledge-based industry. Building Research & Information, 30(6), pp. 401-412. ISSN 0961-3218
Ofori, G; Leong, C and Pin, T E O (2002) Impact of foreign contractors on Singapore construction industry: A qualitative study. Engineering, Construction and Architectural Management, 9(1), pp. 16-28. ISSN 0969-9988
Osman, I I (2002) Performance measures for contracting companies: a study of the Arab Contractors Company. Unpublished PhD thesis, Loughborough University, UK.
Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK. Unpublished PhD thesis, Nottingham Trent University, UK.
Paris, D E (2002) A residential satisfaction decision support system for affordable housing. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Park, B (2002) Development of a virtual reality excavator simulator: A mathematical model of excavator digging and a calculation methodology. Unpublished PhD thesis, Virginia Polytechnic Institute and State University, USA.
Park, H-S (2002) Development of a construction productivity metrics system (CPMS). Unpublished PhD thesis, University of Texas - Austin, USA.
Pavitt, T C (2002) Managing construction interfaces within the building facade. Unpublished PhD thesis, Loughborough University, UK.
Peng, J L (2002) Stability analyses and design recommendations for practical shoring systems during construction. Journal of Construction Engineering and Management, 128(6), pp. 536-544. ISSN 0733-9364
Penland, J L (2002) Implementation of web-based team collaboration tools in the architectural, engineering and construction industry. Unpublished PhD thesis, University of Kansas, USA.
Pepper, C; Dainty, A R J; Bagilhole, B M and Gibb, A G F (2002) Diversity: A driver of business improvement within the UK construction sector? In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. Unpublished PhD thesis, The University of Texas at Austin, USA.
Pheng, L S and Fong, E T W (2002) Preparations for ISO 9001:2000: a study of ISO 9000:1994 certified construction firms. Construction Management and Economics, 20(5), pp. 403-413. ISSN 01446193
Phua, F T-T (2002) Toward a critical assessment of social identity: the nature of organisational identification and its implicationsfor inter-organisational cooperation in the context of the Hong Kongconstruction industry. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Pietroforte, R and Miller, J B (2002) Procurement methods for us infrastructure: Historical perspectives and recent trends. Building Research & Information, 30(6), pp. 425-434. ISSN 0961-3218
Pilgrim, M; Bouchlaghem, D; Loveday, D and Holmes, M (2002) Towards best practice in building analysis data representation. Construction Innovation, 2(2), pp. 117-130. ISSN 1471-4175
Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. Unpublished PhD thesis, Queensland University of Technology, Australia.
Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. Unpublished PhD thesis, Loughborough University, UK.
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
Pryke, S D (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. Unpublished PhD thesis, University College London, UK.
Psilander, K (2002) Axiomatic design in the customizing home building industry. Engineering, Construction and Architectural Management, 9(4), pp. 318-324. ISSN 0969-9988
Que, B C (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128(2), pp. 139-143. ISSN 0733-9364
Radosavljević M, M W (2002) The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20(1), pp. 3-12. ISSN 01446193
Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193
Reeves, K (2002) Construction business systems in Japan: General contractors and subcontractors. Building Research & Information, 30(6), pp. 413-424. ISSN 0961-3218
Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. Unpublished PhD thesis, Loughborough University, UK.
Ribeiro, F L and Lopes, J (2002) An approach to e-business in construction. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Romeiras de Lemos, M T (2002) Sustainable competitive advantage in PFI: A systematic and holistic approach to identify the csfs in risk management in PFI, taking into account the whole life cycle. Unpublished PhD thesis, University of Salford, UK.
Roy, R; Waller, J and Low, M (2002) Development of a process documentation system for the house-building industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ruddock, L (2002) Measuring the global construction industry: Improving the quality of data. Construction Management and Economics, 20(7), pp. 553-556. ISSN 01446193
Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(6), pp. 435-445. ISSN 0961-3218
Saha, S K (2002) Predicting realistic performance rate and optimum inspection rate in construction. Unpublished PhD thesis, University of Western Sydney, Australia.
Saidi, K (2002) Possible applications of handheld computers to quantity surveying. Unpublished PhD thesis, University of Texas at Austin, USA.
Sarshar, M; Murat Tanyer, A; Aouad, G and Underwood, J (2002) A vision for construction IT 2005 2010: Two case studies. Engineering, Construction and Architectural Management, 9(2), pp. 152-160. ISSN 0969-9988
Sawhney, A and Mund, A (2002) Adaptive probabilistic neural network-based crane type selection system. Journal of Construction Engineering and Management, 128(3), pp. 265-273. ISSN 0733-9364
Schexnayder, C J and David, S A (2002) Past and future of construction equipment: part iv. Journal of Construction Engineering and Management, 128(4), pp. 279-286. ISSN 0733-9364
Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193
Scott, J N (2002) Facilitating the application of information technology in a UK piling contractor. Unpublished PhD thesis, Lancaster University, UK.
Seward, D W (2002) Automating the construction workplace: Positioning and navigational factors. Construction Innovation, 2(3), pp. 167-189. ISSN 1471-4175
Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach. Unpublished PhD thesis, The University of Manchester, UK.
Shar, B K (2002) Application of it to improve the design process in the construction sector of Pakistan: A case of the specification management process. Unpublished PhD thesis, University of Newcastle upon Tyne, UK.
Shehab-Eldeen, T (2002) An automated system for detection, classification and rehabilitation of defects in sewer pipes. Unpublished PhD thesis, Concordia University, Canada.
Shelbourn, M (2002) Using computer-aided-learning to train inexperienced surveyors in diagnosing defects in buildings. Unpublished PhD thesis, University of Salford, UK.
Shen, L Y; Li, H and Li, Q M (2002) Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management, 128(4), pp. 326-330. ISSN 0733-9364
Sherif, M A (2002) A framework for improving pre-project planning. Unpublished PhD thesis, Loughborough University, UK.
Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193
Shields, D R (2002) Construction success of projects. Unpublished PhD thesis, University of Texas Austin, USA.
Shipworth, D (2002) A stochastic framework for embodied greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(1), pp. 16-24. ISSN 0961-3218
Shohet, I M; Puterman, M and Gilboa, E (2002) Deterioration patterns of building cladding components for maintenance management. Construction Management and Economics, 20(4), pp. 305-314. ISSN 01446193
Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193
Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(2), pp. 66-80. ISSN 0969-9988
Skitmore, M and Lo, H P (2002) A method for identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(2), pp. 90-130. ISSN 0969-9988
Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364
Skitmore, R M (2002) Raftery curve construction for tender price forecasts. Construction Management and Economics, 20(1), pp. 83-89. ISSN 01446193
Smallwood, J and Venter, D (2002) The influence of project managers on construction health and safety in South Africa. Construction Economics and Building, 2(1), pp. 57-69. ISSN 2204-9029
Smallwood, J J (2002) Best practice workers' compensation insurance performance: The related issues. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Smallwood, J J (2002) The influence of health and safety (H&S) culture on H&S performance. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Smith, J (2002) Strategic client briefing: A model for building project inception. Unpublished PhD thesis, University of Melbourne, Australia.
Smith, J; Mills, A; Saunders, A and Love, P E D (2002) Business environment of construction firms: A comparison of metropolitan and regional enterprises in Australia. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Smith, S and Roy, R (2002) Product configuration in the house-building industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. Unpublished PhD thesis, University of Wolverhampton, UK.
Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029
Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988
Staub-French, S A (2002) Feature-driven activity-based cost estimating. Unpublished PhD thesis, Stanford University, USA.
Stehn, L (2002) Environmental labelling of timber-framed dwellings and their building components. Building Research & Information, 30(4), pp. 248-254. ISSN 0961-3218
Stephenson, P; Morrey, I; Vacher, P and Ahmed, Z (2002) Acquisition and structuring of knowledge for defect prediction in brickwork mortar. Engineering, Construction and Architectural Management, 9(5-6), pp. 396-408. ISSN 0969-9988
Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. Published PhD thesis, Luleå University of Technology, Sweden.
Sterner, E (2002) 'Green procurement' of buildings: A study of Swedish clients' considerations. Construction Management and Economics, 20(1), pp. 21-30. ISSN 01446193
Stockings, W H (2002) The process of construction planning. Unpublished PhD thesis, Technische Universiteit Eindhoven (The Netherlands), The Netherlands.
Straub, A (2002) Strategic technical management of housing stock: Lessons from Dutch housing associations. Building Research & Information, 30(5), pp. 372-381. ISSN 0961-3218
Sulaiman, N F (2002) The development of a dual phase approach to embracing a total quality culture in the Malaysian construction industry. Unpublished PhD thesis, Glasgow Caledonian University, UK.
Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. Unpublished PhD thesis, University of Michigan, USA.
Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Tam, C M; Tam, V W Y and Zeng, S X (2002) Environmental performance evaluation (EPE) for construction. Building Research & Information, 30(5), pp. 349-361. ISSN 0961-3218
Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364
Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988
Tan, W (2002) Construction and economic development in selected LDCs: Past, present and future. Construction Management and Economics, 20(7), pp. 593-599. ISSN 01446193
Tay, L and Morgan, N A (2002) Antecedents and consequences of market orientation in chartered surveying firms. Construction Management and Economics, 20(4), pp. 331-341. ISSN 01446193
Thomas, H R (2002) 2000 Peurifoy lecture: Construction practices in developing countries. Journal of Construction Engineering and Management, 128(1), pp. 1-7. ISSN 0733-9364
Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364
Thompson, R F (2002) Management of architects within architectural businesses. Unpublished PhD thesis, University of Salford, UK.
Thuvander, L (2002) Towards environmental informatics for building stocks. A conceptual model for an environmental building stock information system for sustainable development – EBSIS. Unpublished PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Toole, T M (2002) Construction site safety roles. Journal of Construction Engineering and Management, 128(3), pp. 203-210. ISSN 0733-9364
Tran, D and Skitmore, M (2002) The impact of culture on international management: A survey of project communications in Singapore. Construction Economics and Building, 2(2), pp. 36-47. ISSN 2204-9029
Trethewy, R (2002) Influences on subcontractor OHS management outcomes in construction. Unpublished PhD thesis, University of New South Wales, Australia.
Tunçer, B; Stouffs, R and Sariyildiz, S (2002) Document decomposition by content as a means for structuring building project information. Construction Innovation, 2(4), pp. 229-248. ISSN 1471-4175
Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(3), pp. 209-221. ISSN 0969-9988
Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988
Walker, D H T (2002) Enthusiasm, commitment and project alliancing: An Australian experience. Construction Innovation, 2(1), pp. 15-31. ISSN 1471-4175
Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193
Wang, W C (2002) Sim-utility: Model for project ceiling price determination. Journal of Construction Engineering and Management, 128(1), pp. 76-84. ISSN 0733-9364
Wang, Y-R (2002) Applying the PDRI in project risk management. Unpublished PhD thesis, University of Texas at Austin, USA.
Watson, P and Davis, R (2002) The application of the European foundation for quality management excellence model. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Watson, R; Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data: Managing electronic project specification information. Engineering, Construction and Architectural Management, 9(3), pp. 272-283. ISSN 0969-9988
Watts, C J (2002) In-service training for computer-aided design in building surveying. Unpublished PhD thesis, De Montfort University, UK.
Weippert, A; Kajewski, S L and Tilley, P A (2002) Internet-based information and communication systems on remote construction projects: A case study analysis. Construction Innovation, 2(2), pp. 103-116. ISSN 1471-4175
Whiteman, D E (2002) The application of total quality management in construction field operations. Unpublished PhD thesis, University of Florida, USA.
Whittock, M (2002) Women's experiences of non-traditional employment: Is gender equality in this area a possibility? Construction Management and Economics, 20(5), pp. 449-456. ISSN 01446193
Whyte, J and Bouchlaghem, D (2002) Implementation of VR systems: A comparison between the early adoption of CAD and current uptake of VR. Construction Innovation, 2(1), pp. 3-13. ISSN 1471-4175
Whyte, J; Bouchlaghem, D and Thorpe, T (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9(5-6), p. 371. ISSN 0969-9988
Wild, A (2002) "False coherence" and "cohesive fragmentation" in construction's post-war corporatism 1945-70. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Wild, A (2002) The management college that never was. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Wild, A (2002) The unmanageability of construction and the theoretical psycho-social dynamics of projects. Engineering, Construction and Architectural Management, 9(4), pp. 345-351. ISSN 0969-9988
Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193
Won, S (2002) A model for work function characteristics-based prioritization of technologies for capital projects. Unpublished PhD thesis, The University of Texas at Austin, USA.
Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy. Unpublished PhD thesis, Massachusetts Institute of Technology, USA.
Wu, R (2002) Computer -aided dimensional control in building construction. Unpublished PhD thesis, Technische Universiteit Eindhoven (The Netherlands), The Netherlands.
Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988
Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029
Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193
Xie, X (2002) Communications in construction design. Unpublished PhD thesis, Loughborough University, UK.
Xu, T; Smith, N J and Bower, D A (2002) Improving the integration of international contractors in China. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Yamaguchi, H (2002) Risk allocation in privately financed projects. Unpublished PhD thesis, University of New South Wales, Australia.
Yamaguchi, H; Uher, T E and Runeson, G (2002) Negotiation analysis of risk allocation for PFI projects. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193
Yates, J K and Lockley, E E (2002) Documenting and analyzing construction failures. Journal of Construction Engineering and Management, 128(1), pp. 8-17. ISSN 0733-9364
Yean, F; Ling, Y; Fu, E and Leong, K (2002) Performance of design-build projects in terms of cost, quality and time: Views of clients, architects and contractors in Singapore. Construction Economics and Building, 2(1), pp. 37-46. ISSN 2204-9029
Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364
Yu, K Q (2002) Computer integrated construction based on total project systems framework. Unpublished PhD thesis, University of British Columbia, Canada.
Zawdie, G and Langford, D A (2002) Influence of construction-based infrastructure on the development process in Sub-Saharan Africa. Building Research & Information, 30(3), pp. 160-170. ISSN 0961-3218
Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988
Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. Unpublished PhD thesis, Purdue University, USA.
Zhang, X Q; Kumaraswamy, M M; Zheng, W and Palaneeswaran, E (2002) Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong. Journal of Construction Engineering and Management, 128(2), pp. 155-163. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Zhou, Q (2002) From CAD to IAD: An internet application of steel construction consulting for architects. Unpublished PhD thesis, Illinois Institute of Technology, USA.
Zhu, D (2002) The production characteristics in Hong Kong's construction industry. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Zika-Viktorsson, A (2002) The industrial project. Studies of the work situation of project members. Published PhD thesis, KTH Royal Institute of Technology, Sweden.
Ziouziou, S and Murdoch, I J (2002) Internationalization: The repositioning of the Japanese construction industry. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Zulu, S and Brown, A (2002) Construction project management process quality research: An exploratory examination. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175
den Otter, A F and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(3), pp. 162-173. ISSN 0969-9988
li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175