Items where Year is 1998
A
Aalami, F B (1998) Using construction method models to generate four-dimensional production models. Unpublished PhD thesis, Stanford University, USA.
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. Unpublished PhD thesis, University of Texas at Austin, USA.
Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. Unpublished PhD thesis, Universite de Montreal, Canada.
Abdel-Razek, R H (1998) Factors affecting construction quality in Egypt: Identification and relative importance. Engineering, Construction and Architectural Management, 5(3), pp. 220-227. ISSN 0969-9988
Abdel-Razek, R H (1998) Quality improvement in Egypt: Methodology and implementation. Journal of Construction Engineering and Management, 124(5), pp. 354-360. ISSN 0733-9364
Abdul-Aziz, A R and Chwee Ngoh Tan, A M Y (1998) GATT, GATS and the global construction industry. Engineering, Construction and Architectural Management, 5(1), pp. 31-37. ISSN 0969-9988
Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. Unpublished PhD thesis, University of Tennessee, USA.
Abraham, D M and Dickinson, R J (1998) Disposal costs for environmentally regulated facilities: LCC approach. Journal of Construction Engineering and Management, 124(2), pp. 146-154. ISSN 0733-9364
Abraham, D M; Wirahadikusumah, R; Short, T J and Shahbahrami, S (1998) Optimization modeling for sewer network management. Journal of Construction Engineering and Management, 124(5), pp. 402-410. ISSN 0733-9364
Abu Bakar, R (1998) The management practices and organisational culture of large Malaysian construction contractors. Unpublished PhD thesis, University of Reading, UK.
Abubakar, S Y (1998) Investigation of factors affecting rural road maintenance: the case of Sokoto State, Nigeria. Unpublished PhD thesis, Loughborough University, UK.
Addis, B and Al-Ghamdi, M (1998) The role of technical marketing in effective utilization of quality management in consulting engineering firms. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364
Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193
Agapiou, A; Flanagan, R; Norman, G and Notman, D (1998) The changing role of builders merchants in the construction supply chain. Construction Management and Economics, 16(3), pp. 351-361. ISSN 01446193
Ahmad, R K; Gibb, A G F and McCaffer, R (1998) Methodology to develop an effective safety performance measurement technique (spmt). In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Akintoye, A; Bowen, P and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(2), pp. 159-175. ISSN 01446193
Akintoye, A; Taylor, C and Fitzgerald, E (1998) Risk analysis and management of private finance initiative projects. Engineering, Construction and Architectural Management, 5(1), pp. 9-21. ISSN 0969-9988
Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193
Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988
Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988
Amirudin, R B (1998) The application of a knowledge-based engineering approach to the structural design of steel framed office buildings. Unpublished PhD thesis, University of Reading, UK.
Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements. Unpublished PhD thesis, University of Florida, USA.
Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364
Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Aouad, G F; Child, T; Brandon, P S and Sarshar, M (1998) Linking construction information through VR using an object oriented environment. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Arditi, D and Gunaydin, H M (1998) Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194-203. ISSN 0733-9364
Arditi, D and Yasamis, F (1998) Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), pp. 361-373. ISSN 0733-9364
Atkinson, A (1998) Human error in the management of building projects. Construction Management and Economics, 16(3), pp. 339-349. ISSN 01446193
Azam, M A M; Ross, A D; Fortune, C J and Jaggar, D (1998) An information strategy to support effective construction design decision making. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
B
Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364
Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Ben-Haim, Y and Laufer, A (1998) Robust reliability of projects with activity-duration uncertainty. Journal of Construction Engineering and Management, 124(2), pp. 125-131. ISSN 0733-9364
Benhaim, M and Birchall, D W (1998) Interfirm relationships within the construction industry: A comparative study between France and the UK. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bentley, D and Stacey, R (1998) The potential for applying complex adaptive systems theory to the process of estimating in the construction industry. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bertz, M D (1998) Situated learning methodologies and assessment in civil engineering structures education. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Bewry, S and Kenley, R (1998) Development of service delivery through asset management. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Birgonul, M T and Ozdogan, I (1998) A proposed framework for governmental organizations in the implementation of build-operate-transfer (BOT) model. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Birnie, J (1998) Risk allocation to the construction firm within a private finance initiative (PFI) project. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. Unpublished PhD thesis, Abertay University, UK.
Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Blismas, N G; Sher, W and Thorpe, A (1998) National and global multi-site projects. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(3), pp. 327-337. ISSN 01446193
Boussabaine, A H and Kaka, A P (1998) A neural networks approach for cost flow forecasting. Construction Management and Economics, 16(4), pp. 471-479. ISSN 01446193
Boyd, D and Kerr, E (1998) An analysis of developer-clients' perception of consultants. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Boznos, D (1998) The use of computerised maintenance management systems to support team-based maintenance. Unpublished PhD thesis, Cranfield University, UK.
Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(1), pp. 57-69. ISSN 01446193
Bresnen, M and Marshall, N (1998) Partnering strategies and organizational cultures in the construction industry. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364
Burchett, J F and Tummala, V M R (1998) The application of the risk management process in capital investment decisions for EHV transmission line projects. Construction Management and Economics, 16(2), pp. 235-244. ISSN 01446193
Burleson, R C; Haas, C T; Tucker, R L and Stanley, A (1998) Multiskilled labor utilization strategies in construction. Journal of Construction Engineering and Management, 124(6), pp. 480-489. ISSN 0733-9364
C
Camfield, F E (1998) Guidelines for quarrystone armor units. Journal of Construction Engineering and Management, 124(6), pp. 465-479. ISSN 0733-9364
Carrillo, P M (1998) Mergers and acquisitions: The impact on information systems and information technology. Engineering, Construction and Architectural Management, 5(3), pp. 276-284. ISSN 0969-9988
Chan, D W M (1998) Modelling construction durations for public housing projects. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364
Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. Unpublished PhD thesis, University of Reading, UK.
Chau, K W (1998) The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5(1), pp. 38-50. ISSN 0969-9988
Che Wan Putra, C W F (1998) CAPE construction application protocol for data transfer: a building data model. Unpublished PhD thesis, University of Salford, UK.
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
Chen, J J (1998) The characteristics and current status of China's construction industry. Construction Management and Economics, 16(6), pp. 711-719. ISSN 01446193
Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. Unpublished PhD thesis, University of Wolverhampton, UK.
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. Unpublished PhD thesis, University of Texas at Austin, USA.
Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193
Clarke, L and Wall, C (1998) UK construction skills in the context of European developments. Construction Management and Economics, 16(5), pp. 553-567. ISSN 01446193
Coffey, M and Langford, D (1998) The propensity for employee participation by electrical and mechanical trades in the construction industry. Construction Management and Economics, 16(5), pp. 543-552. ISSN 01446193
Coopman, J T (1998) Superintendent motivation and satisfaction related to the use of construction management for school facility projects. Unpublished EdD thesis, Ball State University, USA.
Crosthwaite, D (1998) The internationalization of British construction companies 1990-96: An empirical analysis. Construction Management and Economics, 16(4), pp. 389-395. ISSN 01446193
Curwell, S and Cooper, I (1998) The implications of urban sustainability. Building Research & Information, 26(1), pp. 17-28. ISSN 0961-3218
D
Dainty, A R J (1998) A grounded theory of the determinants of women's under-achievement in large construction companies. Unpublished PhD thesis, Loughborough University, UK.
Dainty, A R J; Bagilhole, B M and Neale, R H (1998) Improving the retention of construction professionals: A soft HRM approach. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Danks, S; Shephard, A and Wild, A (1998) Architecture as the practice of design and the organization of practice. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Davenport, D M (1998) A comparative study of the effectiveness of the UK and French construction industries in the achievement of satisfaction with performance as perceived by the construction client. Unpublished PhD thesis, University of Central Lancashire, UK.
Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193
Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dawood, N N and Bates, W (1998) Forecasting indices for construction activities in the heavy civil engineering industry: A joint approach methodology. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dean, Y and Warwick, S (1998) Buildings, the suppression of seasonal response and the effects on health. Building Research & Information, 26(3), pp. 146-156. ISSN 0961-3218
Deb, A (1998) Sustainable cities in developing countries. Building Research & Information, 26(1), pp. 29-38. ISSN 0961-3218
Delwar, M (1998) A generic LCCA algorithm for pavement management decisions. Unpublished PhD thesis, Washington State University, USA.
Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364
Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988
de La Garza, J M; Hancher, D E and Decker, L (1998) Analysis of safety indicators in construction. Journal of Construction Engineering and Management, 124(4), pp. 312-314. ISSN 0733-9364
E
Edkins, A J D (1998) Managing the design process in construction: a cognitive approach. Unpublished PhD thesis, University College London, UK.
Edward Back, W and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(2), pp. 137-143. ISSN 0969-9988
Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services costs estimation: Comment. Construction Management and Economics, 16(1), pp. 105-108. ISSN 01446193
Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: A review and future directions for research. Engineering, Construction and Architectural Management, 5(4), pp. 339-349. ISSN 0969-9988
Egbu, C O; Henry, J; Kaye, G R; Quintas, P; Schumacher, T R and Young, B A (1998) Managing organizational innovations in construction. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193
El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193
El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. Unpublished PhD thesis, Concordia University, Canada.
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. Unpublished PhD thesis, Texas A&M University, USA.
Elhag, T M S and Boussabaine, A H (1998) An artificial neural system for cost estimation of construction projects. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones. Unpublished PhD thesis, University of Florida, USA.
Elvin, G A (1998) A process model for integrated design and construction. Unpublished PhD thesis, University of California, Berkeley, USA.
Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. Unpublished PhD thesis, Polytechnic University, USA.
Eskins, W A (1998) Construction of the new Coleman Bridge: Fifth Roebling lecture, 1997. Journal of Construction Engineering and Management, 124(3), pp. 173-175. ISSN 0733-9364
Evans, R C and Kaka, A P (1998) Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Engineering, Construction and Architectural Management, 5(1), pp. 58-67. ISSN 0969-9988
Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364
Everett, J G and Kelly, D L (1998) Drywall joint finishing: Productivity and ergonomics. Journal of Construction Engineering and Management, 124(5), pp. 347-353. ISSN 0733-9364
Ezulike, E I and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(2), pp. 144-149. ISSN 0969-9988
F
Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(2), pp. 182-188. ISSN 0969-9988
Faniran, O O; Oluwoye, J O and Lenard, D J (1998) Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), pp. 245-256. ISSN 0733-9364
Fayek, A (1998) Competitive bidding strategy model and software system for bid preparation. Journal of Construction Engineering and Management, 124(1), pp. 1-10. ISSN 0733-9364
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364
Fortune, C and Lees, M (1998) Quality in strategic cost advice: The effect of anchoring and adjustment. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Fraser, C (1998) Personal factors influencing managerial effectiveness: A study of Australian construction site managers. Unpublished PhD thesis, Queensland University of Technology, Australia.
G
Galbraith, G H; McLean, R C; Gillespie, I; Guo, J and Kelly, D (1998) Nonisothermal moisture diffusion in porous building materials. Building Research & Information, 26(6), pp. 330-339. ISSN 0961-3218
Galbraith, G H; McLean, R C and Guo, J S (1998) Moisture permeability data presented as a mathematical relationship. Building Research & Information, 26(3), pp. 157-168. ISSN 0961-3218
Galha, H M (1998) Quality in building design: A case study. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Gan, C E (1998) Organizational interactions in the management of development projects. Unpublished PhD thesis, National University of Singapore, Singapore.
Gann, D and Senker, P (1998) Construction skills training for the next millennium. Construction Management and Economics, 16(5), pp. 569-580. ISSN 01446193
Gann, D M; Wang, Y and Hawkins, R (1998) Do regulations encourage innovation? The case of energy efficiency in housing. Building Research & Information, 26(5), pp. 280-296. ISSN 0961-3218
Gannon, E J (1998) A life-cycle cost model for use in the optimization of concrete bridge deck repair and rehabilitation. Unpublished PhD thesis, The Pennsylvania State University, USA.
Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. Unpublished PhD thesis, University of Waterloo, USA.
Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the ontario intercity highway network. Unpublished PhD thesis, University of Waterloo, Canada.
Goh, B H (1998) Forecasting residential construction demand in Singapore: A comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(3), pp. 261-275. ISSN 0969-9988
Goodman, R E (1998) Taxonomy of knowledge requirements for executives of general contracting and construction management enterprises. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Gould, N (1998) Alternative dispute resolution in the UK construction industry. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Gowda, R K; Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(4), pp. 417-432. ISSN 01446193
Gowri, K and Depanni, S (1998) The health and safety expert system (HASES): An expert system framework for building inspections. Engineering, Construction and Architectural Management, 5(1), pp. 92-101. ISSN 0969-9988
Green, S D (1998) The technocratic totalitarianism of construction process improvement: A critical perspective. Engineering, Construction and Architectural Management, 5(4), pp. 376-386. ISSN 0969-9988
Griffith, A and Headley, J D (1998) Management of small building works. Construction Management and Economics, 16(6), pp. 703-709. ISSN 01446193
Grilo, A C B (1998) The development of electronic trading between construction firms. Unpublished PhD thesis, University of Salford, UK.
Gunning, J G and Keaveney, M (1998) A transverse examination of occupational stress among a cross-disciplinary population of Irish construction professionals. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Guy, G B and Kibert, C J (1998) Developing indicators of sustainability: US experience. Building Research & Information, 26(1), pp. 39-45. ISSN 0961-3218
Guzman de la Cruz, A L (1998) Cost-performance criteria for seismic retrofitting. Unpublished PhD thesis, University of Puerto Rico, Mayaguez, Puerto Roco.
H
Hajjar, D and Abourizk, S M (1998) Modeling and analysis of aggregate production operations. Journal of Construction Engineering and Management, 124(5), pp. 390-401. ISSN 0733-9364
Haksever, A M (1998) Information overload in construction project management. Unpublished PhD thesis, University of Reading, UK.
Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. Unpublished PhD thesis, The Ohio State University, USA.
Hall, M A and Jaggar, D M (1998) The importance of cultural differences to British construction professionals working internationally. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Hancher, D E (1998) Innovations in highway construction: Twelfth Peurifoy lecture, 1997. Journal of Construction Engineering and Management, 124(5), pp. 343-346. ISSN 0733-9364
Hand, J W (1998) Removing barriers to the use of simulation in the building design professions. Unpublished PhD thesis, University of Strathclyde, UK.
Hansen, K L; Gann, D M and Gro K, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(2), pp. 115-126. ISSN 0969-9988
Harmelink, D J and Rowings, J E (1998) Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management, 124(4), pp. 263-268. ISSN 0733-9364
Harper, R S and Koehn, E (1998) Managing industrial construction safety in southeast Texas. Journal of Construction Engineering and Management, 124(6), pp. 452-457. ISSN 0733-9364
Harris, R B and Ioannou, P G (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), pp. 269-278. ISSN 0733-9364
Harriss, C (1998) Why research without theory is not research a reply to Seymour, Crook and Rooke. Construction Management and Economics, 16(1), pp. 113-116. ISSN 01446193
Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364
Herbsman, Z J and Glagola, C R (1998) Lane rental: innovative way to reduce road construction time. Journal of Construction Engineering and Management, 124(5), pp. 411-417. ISSN 0733-9364
Hernandez Delgado, O A (1998) Decision-making for the selection of investment projects. Unpublished PhD thesis, The University of Nottingham, UK.
Hindle, R D and Rwelamila, P (1998) Resistance to change: Architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(2), pp. 150-158. ISSN 0969-9988
Hinze, J; Pedersen, C and Fredley, J (1998) Identifying root causes of construction injuries. Journal of Construction Engineering and Management, 124(1), pp. 67-71. ISSN 0733-9364
Hogan, D B (1998) Modeling construction cost performance: A comprehensive approach using statistical, artificial neural network and simulation methods. Unpublished PhD thesis, Columbia University, USA.
Howarth, T and Griffith, A (1998) Promoting continuous improvement in construction education: Developing curricula through graduate- practitioner reflection. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems. Unpublished PhD thesis, University of Michigan, USA.
Hoxley, M (1998) The impact of competitive fee tendering on construction professional service quality. Unpublished PhD thesis, University of Salford, UK.
Hsieh, T Y (1998) Impact of subcontracting on site productivity: Lessons learned in Taiwan. Journal of Construction Engineering and Management, 124(2), pp. 91-100. ISSN 0733-9364
Hugill, D (1998) Illuminating a psychological theory (in a construction management context). In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
I
Idris, M M (1998) Assessment of the factors influencing the maintenance programme of a large university building in Riyadh. Construction Management and Economics, 16(6), pp. 673-679. ISSN 01446193
Ikaheimonen, J (1998) Construction loads on shores and stability of horizontal formwork. Unpublished TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
J
Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Jaselskis, E J and Talukhaba, A (1998) Bidding considerations in developing countries. Journal of Construction Engineering and Management, 124(3), pp. 185-193. ISSN 0733-9364
Jayawardane, A K W and Gunawardena, N B (1998) Construction workers in developing countries: A case study of Sri Lanka. Construction Management and Economics, 16(5), pp. 521-530. ISSN 01446193
Jennings, P and Holt, G D (1998) Prequalification and multi-criteria selection: A measure of contractors' opinions. Construction Management and Economics, 16(6), pp. 651-660. ISSN 01446193
Jensen Jr, D A and Craig Jr, J W (1998) Testing the validity of liquidated damages clauses: Measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(3), pp. 269-281. ISSN 01446193
Jensen Jr, D A and Craig Jr, J W (1998) The impact of TAMRA '88 on US construction accounting practices. Construction Management and Economics, 16(3), pp. 303-313. ISSN 01446193
Johnson, H M; Singh, A and Young, R H F (1998) Fall protection analysis for workers on residential roofs. Journal of Construction Engineering and Management, 124(5), pp. 418-428. ISSN 0733-9364
Jones, B K (1998) A model for collaborative engineering the construction industry. Unpublished PhD thesis, University of Southampton, UK.
Junnonen, J M (1998) Strategy formation in construction firms. Engineering, Construction and Architectural Management, 5(2), pp. 107-114. ISSN 0969-9988
Jägbeck, A (1998) It support for construction planning: A system design based on integrated information. Published PhD thesis, KTH Royal Institute of Technology, Sweden.
K
Kale, S and Arditi, D (1998) Business failures: Liabilities of newness, adolescence, and smallness. Journal of Construction Engineering and Management, 124(6), pp. 458-464. ISSN 0733-9364
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. Unpublished PhD thesis, Teesside University, UK.
Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364
Karim, M A (1998) Development of a systems approach to planning, design and operations of intermodal passenger transfer facilities to increase the mobility and safety of older travelers. Unpublished PhD thesis, West Virginia University, USA.
Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. Unpublished PhD thesis, Universite de Montreal, Canada.
Keevil, P S (1998) Feasibility of representing selected elements of the 1985 building regulations in prolog or other rule-based form. Unpublished PhD thesis, Open University, UK.
Kenley, R (1998) The role of meta-analysis in construction management research. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Khosrowshahi, F (1998) A hybrid of executive management decision support tools. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Kiani, H (1998) A model for measuring effectiveness of building construction organisations: Owner's perspective. Unpublished PhD thesis, University of Waterloo, USA.
Kim, H S (1998) Evaluation of quality during early design: A prerequisite to defining value for money for the client. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Kim, H-s (1998) Value for money in building design: Modelling the cost-quality relationships. Unpublished PhD thesis, University of Reading, UK.
Kim, S (1998) Sustainable building practices: minimising the life-cycle environmental impact of high-rise apartments in Korea. Unpublished PhD thesis, University of Edinburgh, UK.
Konchar, M and Sanvido, V (1998) Comparison of U.S. Project delivery systems. Journal of Construction Engineering and Management, 124(6), pp. 435-444. ISSN 0733-9364
Kululanga, G K; Edum-Fotwe, F T; McCaffer, R and Price, A D F (1998) Learning mechanisms for addressing improvement in construction companies. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(3), pp. 228-237. ISSN 0969-9988
Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193
Kunszt, G (1998) Sustainable development and the Hungarian construction industry. Building Research & Information, 26(1), pp. 46-55. ISSN 0961-3218
Kwok, T L (1998) Strategic alliances in construction: A study of contracting relationships and competitive advantage in public sector building works. Unpublished PhD thesis, Queensland University of Technology, Australia.
L
Laitinen, J (1998) Model based construction process management. Published PhD thesis, KTH Royal Institute of Technology, Sweden.
Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988
Landin, A M and Persson, M H (1998) Evaluation of quality systems for specialist contractors. Engineering, Construction and Architectural Management, 5(3), pp. 210-219. ISSN 0969-9988
Lansley, P R (1998) The winning streak in construction research. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Laufer, A; Shapira, A and Goren, I (1998) Implementing an integrative approach to project schedule compression. Engineering, Construction and Architectural Management, 5(1), pp. 82-92. ISSN 0969-9988
Laughton, C (1998) Evaluation and prediction of tunnel boring machine performance in variable rock masses. Unpublished PhD thesis, University of Texas at Austin, USA.
Layzell, J and Ledbetter, S (1998) FMEA applied to cladding systems: reducing the risk of failure. Building Research & Information, 26(6), pp. 351-357. ISSN 0961-3218
LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364
Leung, M Y and Liu, A M M (1998) Developing a value management model by value-goal system approach. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Levinson, D M (1998) On whom the toll falls: A model of network financing. Unpublished PhD thesis, University of California, Berkeley, USA.
Lewis, T (1998) Electronic data interchange in the construction industry. Unpublished PhD thesis, Loughborough University, UK.
Li, B (1998) Assessing the influence of the indoor environment on self-reported productivity in offices. Unpublished PhD thesis, University of Reading, UK.
Li, H and Love, P E D (1998) Developing a theory of construction problem solving. Construction Management and Economics, 16(6), pp. 721-727. ISSN 01446193
Li, H; Love, P E D and Ogunlana, S (1998) Genetic algorithm compared to nonlinear optimization for labour and equipment assignment. Building Research & Information, 26(6), pp. 322-329. ISSN 0961-3218
Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. Unpublished PhD thesis, University of Reading, UK.
Liang, J (1998) System integration and database management for computer-aided design of tall building structures. Unpublished PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Lingard, H and Rowlinson, S (1998) Behaviour-based safety management in Hong Kong's construction industry: The results of a field study. Construction Management and Economics, 16(4), pp. 481-488. ISSN 01446193
Littlefair, P J (1998) Predicting lighting energy use under daylight linked lighting controls. Building Research & Information, 26(4), pp. 208-222. ISSN 0961-3218
Lockley, E E (1998) Forensic engineering investigation into construction failures and their documentation. Unpublished PhD thesis, Polytechnic University, USA.
London, K; Kenley, R and Agapiou, A (1998) Theoretical supply chain network modelling in the building industry. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Loosemore, M (1998) Social network analysis: Using a quantitative tool within an interpretative context to explore the management of construction crises. Engineering, Construction and Architectural Management, 5(4), pp. 315-326. ISSN 0969-9988
Loosemore, M (1998) The influence of communication structure upon crisis management efficiency. Construction Management and Economics, 16(6), pp. 661-671. ISSN 01446193
Loosemore, M (1998) The methodological challenges posed by the confrontational nature of the construction industry. Engineering, Construction and Architectural Management, 5(3), pp. 285-293. ISSN 0969-9988
Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(2), pp. 189-198. ISSN 0969-9988
Lopes, J (1998) The construction industry and macroeconomy in Sub-Saharan Africa post 1970. Construction Management and Economics, 16(6), pp. 637-649. ISSN 01446193
Love, P E D; Skitmore, M and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), pp. 221-233. ISSN 01446193
Lowe, D J (1998) Effective feedback and systematic reflection in design cost estimating. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Luck, R (1998) Studying the effect of systematization on design activity. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988
Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the P.R. Of China. Unpublished PhD thesis, The University of Manchester (United Kingdom), UK.
M
Mahmoud, H M (1998) Applying a fuzzy logic expert system in the selection of bridge deck joints. Unpublished PhD thesis, University of Central Florida, USA.
Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193
Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction. Unpublished PhD thesis, University of Alberta, Canada.
Manseau, A (1998) Who cares about overall industry innovativeness? Building Research & Information, 26(4), pp. 241-245. ISSN 0961-3218
Marsh, L (1998) Portable datafiles in the construction supply chain. Unpublished PhD thesis, University of Reading, UK.
Marsh, L and Finch, E (1998) Attitudes towards auto-ID technologies within the UK construction industry. Construction Management and Economics, 16(4), pp. 383-388. ISSN 01446193
Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988
Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364
Maull, W M (1998) An investigation into the development of engineering students' conceptual understanding of mathematics. Unpublished PhD thesis, University of Plymouth, UK.
Maxwell, D A; Back, W E and Toon, J (1998) Optimization of crew configurations using activity-based costing. Journal of Construction Engineering and Management, 124(2), pp. 162-168. ISSN 0733-9364
McCabe, S; Rooke, J; Seymour, D and Brown, P (1998) Quality managers, authority and leadership. Construction Management and Economics, 16(4), pp. 447-457. ISSN 01446193
McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: A case study. Construction Management and Economics, 16(1), pp. 71-78. ISSN 01446193
McGeorge, D; Eng, C S and Plenty, T (1998) A public sector approach to risk management as part of a total asset management strategy. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
McNamara, E T; Howarth, T A P; Hill, C J and Stoneman, G R W (1998) Quality issues in marketing construction related products and services in China. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Mendes, J R; Fernando, L; Heineck, M and Vaca, O L (1998) New applications of line of balance on scheduling of multi-storey buildings. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Mezher, T M and Tawil, W (1998) Causes of delay in the construction industry in Lebanon. Engineering, Construction and Architectural Management, 5(3), pp. 252-260. ISSN 0969-9988
Miller, C; Williams, T and Daunton, L (1998) Issues facing small and medium construction enterprises in industrial South Wales: Can they survive beyond the year 2000? In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Minato, T and Ashley, D B (1998) Data-driven analysis of corporate risk using historical cost-control data. Journal of Construction Engineering and Management, 124(1), pp. 42-47. ISSN 0733-9364
Mitchell Jr., Z W (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model. Unpublished PhD thesis, Virginia Polytechnic Institute and State University, USA.
Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364
Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364
Mootanah, D P (1998) Developing an integrated risk and value management framework for construction project management. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Morledge, R and Owen, K (1998) Critical success factors in PFI projects. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Morrow, T K (1998) Effects of selected practices on project cost performance. Unpublished PhD thesis, University of Texas at Austin, USA.
Motawa, I A; Price, A D F and Sher, W (1998) The introduction and management of innovative construction processes and products. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Murray, M D and Langford, D A (1998) Construction procurement systems: A linkage with project organizational models. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Muya, M; Price, A D F and Thorpe, A (1998) Supplier evaluation of logistics factors and their contribution to improved customer service. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
N
Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218
Notman, D; Norman, G; Flanagan, R and Agapiou, A (1998) A time-series analysis of UK annual and quarterly construction output data (1955-95). Construction Management and Economics, 16(4), pp. 409-416. ISSN 01446193
Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193
O
O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management. Unpublished PhD thesis, Stanford University, USA.
Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals. Unpublished PhD thesis, University of Colorado at Boulder, USA.
Ofori, G and Debrah, Y A (1998) Flexible management of workers: Review of employment practices in the construction industry in Singapore. Construction Management and Economics, 16(4), pp. 397-408. ISSN 01446193
Ogunlana, S O and Pien Chang, W E I (1998) Worker motivation on selected construction sites in Bangkok, Thailand. Engineering, Construction and Architectural Management, 5(1), pp. 61-81. ISSN 0969-9988
Ohemeng, F A (1998) Rehabilitation versus demolition and redevelopment: A value-based decision framework for private commercial properties. Unpublished PhD thesis, University of Salford, UK.
Ohrn, L G and Schexnayder, C (1998) Performance-related specifications for highway construction. Journal of Construction Engineering and Management, 124(1), pp. 25-30. ISSN 0733-9364
Onat, N (1998) An approach to the determination of adaptable spatial design concept in housing production by using prefabricated building elements. Unpublished PhD thesis, Dokuz Eylul Universitesi, Turkey.
P
Payne, B (1998) Project risk analysis. Unpublished PhD thesis, Nottingham Trent University, UK.
Pearl, R G; Bowen, P A and Hall, K A (1998) The compilation of a tender submission: The role of method statements and construction planning charts. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193
Platt, R T (1998) Development of a ready-to-assemble construction system. Unpublished PhD thesis, Virginia Polytechnic Institute and State University, USA.
Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: A preliminary review of the relationship between buildability, site productivity and cost. Construction Management and Economics, 16(6), pp. 681-692. ISSN 01446193
Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. Unpublished PhD thesis, The University of Texas at Austin, USA.
Preece, C N and Shafiei, M (1998) Development of client care initiatives in construction contracting organizations. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. Unpublished PhD thesis, University of Wolverhampton, UK.
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988
Puddicombe, M S (1998) Interorganizational project strategy: contracts, contacts, and performance in the building industry. Unpublished PhD thesis, Boston University, USA.
Q
Quast, P (1998) Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures. Unpublished PhD thesis, University of Notre Dame, USA.
R
Rad, H N and Khosrowshahi, F (1998) Quality measurement in construction projects. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Raftery, J (1998) From Ptolemy to Heisenberg: Quantitative models and reality. Construction Management and Economics, 16(3), pp. 295-302. ISSN 01446193
Raftery, J; Pasadilla, B; Chiang, Y H; Hui, E C M and Tang, B S (1998) Globalization and construction industry development: Implications of recent developments in the construction sector in Asia. Construction Management and Economics, 16(6), pp. 729-737. ISSN 01446193
Rahmat, I; Torrance, V B and Young, B A (1998) The planning and control process of refurbishment projects. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Ranasinghe, M (1998) Risk management in the insurance industry: Insights for the engineering construction industry. Construction Management and Economics, 16(1), pp. 31-39. ISSN 01446193
Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020'. Unpublished PhD thesis, Nottingham Trent University, UK.
Rashid, K B A and Morledge, R (1998) Construction procurement processes in Malaysia: Constraints and strategies. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. Unpublished PhD thesis, University of Reading, UK.
Ravi, M (1998) Knowledge-based system approach to integrated design of multistorey office buildings at the preliminary stage. Unpublished PhD thesis, Concordia University, Canada.
Recsei, R A (1998) A generalised decision support system for contaminated site management. Unpublished PhD thesis, University of New South Wales, Australia.
Ribeiro, F L (1998) Project delivery methods for large scale building projects: A case study. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364
Rilett, L R (1998) Identifying component variability of end product specification tests. Journal of Construction Engineering and Management, 124(2), pp. 133-138. ISSN 0733-9364
Rosenfeld, Y; Navon, R and Cohen, L (1998) Methodology for prioritizing cost-effective construction technologies. Journal of Construction Engineering and Management, 124(3), pp. 176-184. ISSN 0733-9364
Ruddock, L (1998) Comprehensive macro-information systems for the construction industry: An international perspective. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Ryan, E C (1998) Devising contract terms in construction contracts to produce efficient performance. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
S
Saad, I M H and Hancher, D E (1998) Multimedia for construction project management: Project navigator. Journal of Construction Engineering and Management, 124(1), pp. 82-89. ISSN 0733-9364
Sandhaus, G (1998) Neural networks for cost estimating in project management. Unpublished PhD thesis, Swansea University, UK.
Saunders, A (1998) Aspects of funding for BOOT projects. Engineering, Construction and Architectural Management, 5(1), pp. 22-30. ISSN 0969-9988
Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction. Unpublished PhD thesis, University of Wisconsin - Madison, USA.
Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364
Seo, J (1998) Graphical interface design for equipment control in unstructured environments. Unpublished PhD thesis, The University of Texas at Austin, USA.
Seymour, D; Crook, D and Rooke, J (1998) The role of theory in construction management: Reply to Runeson. Construction Management and Economics, 16(1), pp. 109-112. ISSN 01446193
Shammas-Toma, M; Seymour, D and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(2), pp. 177-192. ISSN 01446193
Sharma, R (1998) Organizational role stress:focus on executives of construction industry. Unpublished PhD thesis, Indian Institute of Technology Delhi, India.
Shash, A A (1998) Bidding practices of subcontractors in Colorado. Journal of Construction Engineering and Management, 124(3), pp. 219-231. ISSN 0733-9364
Shash, A A (1998) Subcontractors' bidding decisions. Journal of Construction Engineering and Management, 124(2), pp. 101-106. ISSN 0733-9364
Shen, L and Song, W (1998) Competitive tendering practice in Chinese construction. Journal of Construction Engineering and Management, 124(2), pp. 155-161. ISSN 0733-9364
Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193
Shen, Q and Spedding, A (1998) Priority setting in planned maintenance: practical issues in using the multi-attribute approach. Building Research & Information, 26(3), pp. 169-180. ISSN 0961-3218
Shetterly, D R (1998) The influence of contract design on contractor performance: A multivariate analysis. Unpublished PhD thesis, University of Maryland, Baltimore County, USA.
Shi, J and Abourizk, S (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(4), pp. 489-498. ISSN 01446193
Shirazi, A and Hampson, K (1998) Project manager competencies in a knowledge-based society. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Sillars, D N (1998) Pre-operational attributes as predictors of organizational success within a joint venture: Modeling joint venture formation in the architecture/engineering/construction industry. Unpublished PhD thesis, Georgia Institute of Technology, USA.
Sinfield, J V and Einstein, H H (1998) Tunnel construction costs for tube transportation systems. Journal of Construction Engineering and Management, 124(1), pp. 48-57. ISSN 0733-9364
Skinner, D (1998) Forecasting models of activity in industrial and commercial building. Unpublished PhD thesis, University of Salford (United Kingdom), UK.
Slaughter, E S (1998) Models of construction innovation. Journal of Construction Engineering and Management, 124(3), pp. 226-231. ISSN 0733-9364
Smallwood, J (1998) Client influence on contractor health and safety in South Africa. Building Research & Information, 26(3), pp. 181-189. ISSN 0961-3218
Smith, J and Wyatt, R (1998) Criteria for strategic decision-making at the pre-briefing stage. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smith, J M; Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: An exploratory study. Engineering, Construction and Architectural Management, 5(4), pp. 387-398. ISSN 0969-9988
Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Sonmez, R and Rowings, J E (1998) Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 124(6), pp. 498-504. ISSN 0733-9364
Spiteri, J (1998) A critical analysis of occupational and organisational strategy in UK: architectural and quantity surveying practices. Unpublished PhD thesis, University of Leeds, UK.
Steemers, K; Baker, N; Crowther, D; Dubiel, J and Nikolopoulou, M (1998) Radiation absorption and urban texture. Building Research & Information, 26(2), pp. 103-112. ISSN 0961-3218
Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. Unpublished DrIng thesis, Norges teknisk-naturvitenskapelige universitet, Norway.
Stollberg, D (1998) An appraisal of system built housing in a comparative perspective. Unpublished PhD thesis, Southampton Solent University, UK.
Sturk, R (1998) Engineering geological information: Its value and impact on tunnelling. Unpublished DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.
Swaffield, L M (1998) Improving early cost advice for mechanical and electrical services. Unpublished PhD thesis, Loughborough University, UK.
Syben, G (1998) A qualifications trap in the German construction industry: Changing the production model and the consequences for the training system in the German construction industry. Construction Management and Economics, 16(5), pp. 593-601. ISSN 01446193
T
Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364
Tah, J H M; Carr, V and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(4), pp. 327-338. ISSN 0969-9988
Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(1), pp. 49-55. ISSN 01446193
Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. Published DTech thesis, KTH Royal Institute of Technology, Sweden.
Thomas, S R; Tucker, R L and Kelly, W R (1998) Critical communications variables. Journal of Construction Engineering and Management, 124(1), pp. 58-66. ISSN 0733-9364
Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(2), pp. 94-101. ISSN 0961-3218
Tomlinson, J (1998) A premises occupancy cost forecasting model. Unpublished PhD thesis, The University of Liverpool, UK.
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Toole, T M (1998) Uncertainty and home builders' adoption of technological innovations. Journal of Construction Engineering and Management, 124(4), pp. 323-332. ISSN 0733-9364
Treloar, G J (1998) A comprehensive embodied energy analysis framework. Unpublished PhD Thesis, Deakin University, Australia.
Troive, S (1998) Structural LCC design of concrete bridges. Unpublished DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.
Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry. Unpublished PhD thesis, Oklahoma State University, USA.
Tsenkova, S (1998) Private housebuilding and housing markets in transitional economies: The case of Bulgaria. Unpublished PhD thesis, University of Toronto, Canada.
Tucker, S N and Ambrose, M D (1998) Innovation and evaluation in process improvement. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Tutesigensi, A; Smith, N J and Moodley, K (1998) Key influences on project identification in building projects in Uganda. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
U
Ugwu, O O; Tah, J and Howes, R (1998) Optimizing construction method selection strategies in an integrated decision support environment: Results of application to earthworks operations. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Uher, T E and Ritchie, J A N (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(3), pp. 304-311. ISSN 0969-9988
V
Vargas, C A (1998) Investigating construction falls using fault tree analysis and developing a prototype tool to reduce falls using expert system and computer-assisted instruction methods. Unpublished PhD thesis, The Ohio State University, USA.
W
Walker, D H T (1998) The contribution of the client representative to the creation and maintenance of good project inter-team relationships. Engineering, Construction and Architectural Management, 5(1), pp. 51-57. ISSN 0969-9988
Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193
Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193
Wang, C H; Wang, M W and Huang, Y C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(3), pp. 257-267. ISSN 01446193
Wang, G (1998) Study of construction project cost control information system. Unpublished PhD Thesis, Tongji University, China.
Wang, S Q; Tiong, R L K; Ting, S K; Chew, D and Ashley, D (1998) Evaluation and competitive tendering of BOT power plant project in China. Journal of Construction Engineering and Management, 124(4), pp. 333-341. ISSN 0733-9364
Wang, Y (1998) An analysis of the technical efficiency in Hong Kong's construction industry. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Warszawski, A and Navon, R (1998) Implementation of robotics in building: Current status and future prospects. Journal of Construction Engineering and Management, 124(1), pp. 31-41. ISSN 0733-9364
Watson, P and Chileshe, N (1998) Total quality management (TQM) and the importance of the post-modernist paradigm. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Whelton, M G and Keane, M M (1998) The systematic development of a software environment for building appraisal in the building renovation industry. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Wilde, W J (1998) Life cycle cost analysis of portland cement concrete pavements. Unpublished PhD thesis, The University of Texas at Austin, USA.
Winch, G (1998) Zephyrs of creative destruction: Understanding the management of innovation in construction. Building Research & Information, 26(5), pp. 268-279. ISSN 0961-3218
Winch, G (1998) The growth of self-employment in British construction. Construction Management and Economics, 16(5), pp. 531-542. ISSN 01446193
Winch, G; Usmani, A and Edkins, A (1998) Towards total project quality: A gap analysis approach. Construction Management and Economics, 16(2), pp. 193-207. ISSN 01446193
Wing, C K; Raftery, J and Walker, A (1998) The baby and the bathwater: Research methods in construction management. Construction Management and Economics, 16(1), pp. 99-104. ISSN 01446193
Y
Yang, T and Fellows, R (1998) Organizational effectiveness on building projects in the UK and China: An investigation of the impacts of project managers, project organizational structures and managerial activities. In: Hughes, W. (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Yeh, I C (1998) Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management, 124(5), pp. 374-380. ISSN 0733-9364
Yogeswaran, K (1998) Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong. Unpublished PhD thesis, University of Hong Kong, Hong Kong.
Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1998) Claims for extensions of time in civil engineering projects. Construction Management and Economics, 16(3), pp. 283-293. ISSN 01446193
Z
Zarkada, A (1998) Tendering ethics: A study of collusive tendering from a marketing perspective. Unpublished PhD thesis, Queensland University of Technology, Australia.
Zhang, W R; Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(4), pp. 399-409. ISSN 0969-9988
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. Unpublished PhD thesis, National University of Singapore, Singapore.
Zubairu, S N (1998) Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach. Unpublished PhD thesis, University of Lagos, Nigeria.