Items where Year is 1989

Group by: Creators | Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 114.

Article

Abu-Hijleh, S F and Ibbs, C W (1989) Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), pp. 430-443. ISSN 0733-9364

Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193

Arditi, D and Patel, B K (1989) Impact analysis of owner-directed acceleration. Journal of Construction Engineering and Management, 115(1), pp. 144-157. ISSN 0733-9364

Barker, H (1989) Use of geotextiles and geocomposites in the united kingdom. Journal of Construction Engineering and Management, 115(2), pp. 258-269. ISSN 0733-9364

Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364

Bofang, Z and Jianbo, C (1989) Finite element analysis of effect of pipe cooling in concrete dams. Journal of Construction Engineering and Management, 115(4), pp. 487-498. ISSN 0733-9364

Carr, R I (1989) Cost-estimating principles. Journal of Construction Engineering and Management, 115(4), pp. 545-551. ISSN 0733-9364

Chan, C M R and Harris, F C (1989) A database/spreadsheet application for equipment selection. Construction Management and Economics, 7(3), pp. 235-247. ISSN 01446193

Cohenca, D; Laufer, A and Ledbetter, W B (1989) Factors affecting construction planning efforts. Journal of Construction Engineering and Management, 115(1), pp. 70-89. ISSN 0733-9364

Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364

Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364

Eldin, N N (1989) Measurement of work progress: Quantitative technique. Journal of Construction Engineering and Management, 115(3), pp. 462-474. ISSN 0733-9364

Farid, F; Boyer, L T and Kangari, R (1989) Required return on investments in construction. Journal of Construction Engineering and Management, 115(1), pp. 109-125. ISSN 0733-9364

Faulkner, A C; Sargent, J H and Wearne, S H (1989) Civil engineers' managerial roles and needs: Report of survey. Construction Management and Economics, 7(2), pp. 155-174. ISSN 01446193

Gilleard, J (1989) Computerized reference sources in the construction industry. Construction Management and Economics, 7(4), pp. 321-330. ISSN 01446193

Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193

Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193

Hinze, J and Couey, J (1989) Weather in construction contracts. Journal of Construction Engineering and Management, 115(2), pp. 270-283. ISSN 0733-9364

Hinze, J; Hirakawa, J and Benjamin, N (1989) Comparison of labor agreements. Journal of Construction Engineering and Management, 115(1), pp. 90-107. ISSN 0733-9364

Holt, L (1989) Project management excellence: The Shell Stanney case. Construction Management and Economics, 7(3), pp. 217-234. ISSN 01446193

Hughes, P J; O’Connor, J T and Traver, A E (1989) Pipe manipulator enhancements for increased automation. Journal of Construction Engineering and Management, 115(3), pp. 412-423. ISSN 0733-9364

Hughes, W P (1989) Identifying the environments of construction projects. Construction Management and Economics, 7(1), pp. 29-40. ISSN 01446193

Ioannou, P G (1989) Dynamic probabilistic decision processes. Journal of Construction Engineering and Management, 115(2), pp. 237-257. ISSN 0733-9364

Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364

Ishai, E (1989) Architectural and economic considerations in the design of prefabricated facade components (exterior walls). Construction Management and Economics, 7(3), pp. 189-202. ISSN 01446193

Ivanoff, D J and Diekmann, J E (1989) Project-labor agreements in construction industry. Journal of Construction Engineering and Management, 115(4), pp. 567-584. ISSN 0733-9364

Jahren, C T and Hancher, D E (1989) Evaluation of new concepts for cellular structure construction. Journal of Construction Engineering and Management, 115(1), pp. 15-34. ISSN 0733-9364

Johnston, D W; Kahn, K P and Phillips, J B (1989) Formwork pressures in tall and thick concrete walls. Journal of Construction Engineering and Management, 115(3), pp. 444-461. ISSN 0733-9364

Kabasakal, H E and Sözen, Z (1989) Organizational context, structural attributes and management systems in construction firms. Construction Management and Economics, 7(4), pp. 347-356. ISSN 01446193

Kakoto, T; Skibnlewski, M J and Hancher, D E (1989) Comparison of U.S. And Japanese practices in public construction. Journal of Construction Engineering and Management, 115(4), pp. 499-516. ISSN 0733-9364

Kangari, R and Halpin, D W (1989) Potential robotics utilization in construction. Journal of Construction Engineering and Management, 115(1), pp. 126-143. ISSN 0733-9364

Kangari, R and Yoshida, T (1989) Prototype robotics in construction industry. Journal of Construction Engineering and Management, 115(2), pp. 284-301. ISSN 0733-9364

Karshenas, S (1989) Truck capacity selection for earthmoving. Journal of Construction Engineering and Management, 115(2), pp. 212-227. ISSN 0733-9364

Kenley, R and Wilson, O D (1989) A construction project net cash flow model. Construction Management and Economics, 7(1), pp. 3-18. ISSN 01446193

Kim, M P and Adams, K (1989) An expert system for construction contract claims. Construction Management and Economics, 7(3), pp. 249-262. ISSN 01446193

Logcher, R D; Wang, M T and Chen, F H S (1989) Knowledge processing for construction management data base. Journal of Construction Engineering and Management, 115(2), pp. 196-211. ISSN 0733-9364

Lundberg, E J and Beliveau, Y J (1989) Automated lay-down yard control system: ALYC. Journal of Construction Engineering and Management, 115(4), pp. 535-544. ISSN 0733-9364

Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193

Miskawi, Z (1989) An S-curve equation for project control. Construction Management and Economics, 7(2), pp. 115-124. ISSN 01446193

Nam, C H and Tatum, C B (1989) Toward understanding of product innovation process in construction. Journal of Construction Engineering and Management, 115(4), pp. 517-534. ISSN 0733-9364

Niskanen, T and Lauttalammi, J (1989) Accident prevention in materials handling at building construction sites. Construction Management and Economics, 7(3), pp. 263-279. ISSN 01446193

Ofori, G (1989) Housing in Singapore: Determinants of success and lessons for the developing countries. Construction Management and Economics, 7(2), pp. 137-153. ISSN 01446193

Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(1), pp. 75-86. ISSN 01446193

Olomolaiye, P O and Ogunlana, S O (1989) A system for monitoring and improving construction operative productivity in Nigeria. Construction Management and Economics, 7(2), pp. 175-186. ISSN 01446193

Powell, C (1989) Workload fluctuations and aspects of building quality. Construction Management and Economics, 7(2), pp. 125-136. ISSN 01446193

Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364

Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364

Rutherford, A W (1989) Organizational evolution I-595 Port Everglades expressway. Journal of Construction Engineering and Management, 115(3), pp. 357-369. ISSN 0733-9364

Shanmuganayagam, V (1989) Current float techniques for resources scheduling. Journal of Construction Engineering and Management, 115(3), pp. 401-411. ISSN 0733-9364

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Skitmore, R M; Stradling, S G and Tuohy, A P (1989) Project management under uncertainty. Construction Management and Economics, 7(2), pp. 103-113. ISSN 01446193

Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364

Staab, G E (1989) Construction of port and facilities on horn of Africa: lessons learned. Journal of Construction Engineering and Management, 115(1), pp. 53-69. ISSN 0733-9364

Stevens, J D and Al-Dulaijan, S U (1989) Contractor financing, public works in Saudi Arabia. Journal of Construction Engineering and Management, 115(1), pp. 1-14. ISSN 0733-9364

Tan, W (1989) Subsector fluctuations in construction. Construction Management and Economics, 7(1), pp. 41-51. ISSN 01446193

Tatum, C B (1989) Organizing to increase innovation in construction firms. Journal of Construction Engineering and Management, 115(4), pp. 602-617. ISSN 0733-9364

Tatum, C B; Bauer, M F and Meade, A W (1989) Process of innovation for up/down construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(2), pp. 179-195. ISSN 0733-9364

Tavakoli, A; Taye, E D and Erktin, M (1989) Equipment policy of top 400 contractors: A survey. Journal of Construction Engineering and Management, 115(2), pp. 317-329. ISSN 0733-9364

Thomas, H R; Sanvido, V E and Sanders, S R (1989) Impact of material management on productivity: a case study. Journal of Construction Engineering and Management, 115(3), pp. 370-384. ISSN 0733-9364

Touran, A and Ladick, D R (1989) Application of robotics in bridge deck fabrication. Journal of Construction Engineering and Management, 115(1), pp. 35-52. ISSN 0733-9364

Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), pp. 95-102. ISSN 01446193

Wilson, H A (1989) Organizational behaviour and safety management in the construction industry. Construction Management and Economics, 7(4), pp. 303-319. ISSN 01446193

Winch, G (1989) The construction firm and the construction project: A transaction cost approach. Construction Management and Economics, 7(4), pp. 331-345. ISSN 01446193

Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364

Thesis

Akeel, N F (1989) A database tool for statistically based construction cost estimate. Unpublished PhD thesis, University of Colorado at Boulder, USA.

Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. Unpublished PhD thesis, University of Colorado at Boulder, USA.

Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. Unpublished PhD thesis, University of California, Berkeley, USA.

Anumba, C J (1989) An integrated two and three dimensional data structure for a structural engineering CAD system. Unpublished PhD thesis, University of Leeds, UK.

Attwell, D N (1989) Bayesian models for sequential bidding and related theoretical topics. Unpublished PhD thesis, University of Warwick, UK.

Bambrah, G K (1989) A systematic approach to appraisal/evaluation of civil engineering projects, with special emphasis on technology. Unpublished PhD thesis, Loughborough University, UK.

Barrett, P (1989) Practice management in selected construction-related professions. Unpublished PhD thesis, London South Bank University, UK.

Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. Unpublished PhD thesis, University of Sheffield, UK.

Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. Unpublished PhD thesis, University of Warwick, UK.

Celik, T (1989) Improving concrete quality by using an expert system. Unpublished PhD thesis, Loughborough University, UK.

Choudhury, N-U-S (1989) An evaluation of factors to improve performance of American engineering and construction managers overseas. Unpublished PhD thesis, Texas A&M University, USA.

Coolican, A M (1989) A history of industrial relations in the Sydney building trades, 1870-1914. Unpublished PhD thesis, University of New South Wales, Australia.

Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. Unpublished PhD thesis, University of Southampton, UK.

Dutch, W G (1989) The capital cost aspects of the environmental impact of new highways in association with the new design technique: the commercial route methodology. Unpublished PhD thesis, Loughborough University of Technology, UK.

Egan, C M (1989) An evaluation of the effectiveness of the Mankato State university construction management program. Unpublished EdD thesis, University of Alabama, USA.

Ellis Jr., R D (1989) Model for prediction of highway construction production rates. Unpublished PhD thesis, University of Florida, USA.

Finch, E F (1989) A requisite decision model for the selection of mechanical and electrical services in buildings. Unpublished PhD thesis, University of Reading, UK.

Fortea, S M E (1989) An investigation of appropriateness relative to indigenous and modern housing in Libya. Unpublished PhD thesis, Heriot-Watt University, UK.

Ghanbari Parsa, A R (1989) The interaction of planning policies and construction technologies in Iran with reference to China & Japan. Unpublished PhD thesis, University of Newcastle upon Tyne, UK.

Haghdadi, H (1989) The role of micro computers on the construction site. Unpublished PhD thesis, Aston University, UK.

Hanna, A S (1989) An interactive knowledge-based formwork selection system for buildings. Unpublished PhD thesis, Pennsylvania State University, USA.

Hijazi, A M (1989) Simulation analysis of linear construction processes. Unpublished PhD thesis, Purdue University, USA.

Hong, G-S (1989) Efficiency of a regulated housing market: With rent controls, transaction costs and centralized matching costs. Unpublished PhD thesis, Northwestern University, USA.

Hughes, W (1989) Organizational analysis of building projects. Unpublished PhD thesis, Liverpool Polytechnic, UK.

Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. Unpublished PhD thesis, Loughborough University, UK.

Jergeas, G F (1989) Detailed design and constructability. Unpublished PhD thesis, Loughborough University, UK.

Khosrowshahi, F (1989) A new mathematically based model for forecasting construction project expenditure pattern. Unpublished PhD thesis, South Bank Polytechnic, UK.

Kuldip, C (1989) OR applications in strategic sector constructions with capital budgeting. Unpublished PhD thesis, Indian Institute of Technology Delhi, India.

Lord, A M (1989) An investigation into the role of the project manager: A comparative study of project leadership, organisation and culture in UK defence contractors and engineering constructors. Unpublished PhD thesis, Henley Business School, UK.

Lyu, K Y (1989) Internationalisation of Korean industry: A study of the performance of the plant and construction industry. Unpublished PhD thesis, University of Manchester, UK.

Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. Unpublished PhD thesis, University of Maryland, College Park, USA.

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities. Unpublished PhD thesis, University of Maryland, College Park, USA.

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement. Unpublished PhD thesis, Brunel University, UK.

Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects. Unpublished PhD thesis, Aston University, UK.

Ogunlana, S O (1989) Accuracy in design cost estimating. Unpublished PhD thesis, Loughborough University, UK.

Orczyk, J J (1989) Parametric construction scheduling. Unpublished PhD thesis, Purdue University, USA.

Perera, A A D A J (1989) Cost effective designs. Unpublished PhD thesis, Loughborough University, UK.

Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. Unpublished PhD thesis, University of Texas at Austin, USA.

Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. Unpublished PhD thesis, University of Colorado at Boulder, USA.

Salter, M (1989) Planning systems for small firms. Unpublished PhD thesis, Sheffield Hallam University, UK.

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. Unpublished PhD thesis, Pennsylvania State University, USA.

Shaw, D T (1989) SITE CODE: A knowledge-based model of municipal site development regulations for computer-aided design. Unpublished PhD thesis, The University of Texas at Austin, USA.

Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. Unpublished PhD thesis, Indian Institute of Technology Delhi, India.

Tah, J H M (1989) Integrated microcomputer applications in formwork design. Unpublished PhD thesis, Loughborough University, UK.

Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. Unpublished PhD thesis, Loughborough University, UK.

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. Unpublished PhD thesis, Aston University (United Kingdom), UK.

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. Unpublished PhD Thesis, Stanford University, USA.

Wang, M-T (1989) Knowledge processing for a construction management database. Unpublished PhD thesis, Massachusetts Institute of Technology, USA.

Weinert, R A (1989) A study of the agency construction management method of project delivery as a viable alternative when building new schools. Unpublished DPA thesis, University of La Verne, USA.

Wright, P H (1989) Key factors for the evaluation of the quality of rural shelter structures. Unpublished EdD thesis, West Virginia University, USA.

This list was generated on Tue Apr 29 06:01:34 2025 UTC.