Browse by Journal
Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364
Sturts, C S and Griffis, F H (2005) Addressing pricing: Value bidding for engineers and consultants. Journal of Construction Engineering and Management, 131(6), pp. 621-630. ISSN 0733-9364
Tamate, S; Suemasa, N and Katada, T (2005) Analyses of instability in mobile cranes due to ground penetration by outriggers. Journal of Construction Engineering and Management, 131(6), pp. 689-704. ISSN 0733-9364
Cheng, E W L and Li, H (2005) Analytic network process applied to project selection. Journal of Construction Engineering and Management, 131(4), pp. 459-466. ISSN 0733-9364
Mohamed, Y and AbouRizk, S (2005) Application of the theory of inventive problem solving in tunnel construction. Journal of Construction Engineering and Management, 131(10), pp. 1099-1108. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364
Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Bernold, L E (2005) Automatic as-built generation with utility trenchers. Journal of Construction Engineering and Management, 131(6), pp. 740-747. ISSN 0733-9364
Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364
Park, H S; Thomas, S R and Tucker, R L (2005) Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7), pp. 772-778. ISSN 0733-9364
Riley, D R; Varadan, P; James, J S and Thomas, H R (2005) Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings. Journal of Construction Engineering and Management, 131(8), pp. 877-889. ISSN 0733-9364
Ho, S P (2005) Bid compensation decision model for projects with costly bid preparation. Journal of Construction Engineering and Management, 131(2), pp. 151-159. ISSN 0733-9364
Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364
Weinstein, M; Gambatese, J and Hecker, S (2005) Can design improve construction safety? Assessing the impact of a collaborative safety-in-design process. Journal of Construction Engineering and Management, 131(10), pp. 1125-1134. ISSN 0733-9364
Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364
Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364
Zhang, X (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10), pp. 1054-1064. ISSN 0733-9364
Bogus, S M; Molenaar, K R and Diekmann, J E (2005) Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), pp. 1179-1185. ISSN 0733-9364
El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364
Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364
Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364
Kilian, J J and Gibson, G E (2005) Construction litigation for the U.S. Naval facilities engineering command, 1982-2002. Journal of Construction Engineering and Management, 131(9), pp. 945-952. ISSN 0733-9364
Pulaski, M H and Horman, M J (2005) Continuous value enhancement process. Journal of Construction Engineering and Management, 131(12), pp. 1274-1282. ISSN 0733-9364
Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364
Han, S H; Diekmann, J E and Ock, J H (2005) Contractor's risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), pp. 283-292. ISSN 0733-9364
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Kaiser, M J; Pulsipher, A G and Byrd, R C (2005) Cost of abrasive cutting in decommissioning operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 137-148. ISSN 0733-9364
Kaiser, M J; Pulsipher, A G and Martin, J (2005) Cost of site clearance and verification operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 117-126. ISSN 0733-9364
O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364
Zhang, X (2005) Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131(6), pp. 631-644. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Critical path method with multiple calendars. Journal of Construction Engineering and Management, 131(3), pp. 330-342. ISSN 0733-9364
Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364
Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364
Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364
Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364
Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364
Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364
Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364
Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364
Xu, T; Tiong, R L K; Chew, D A S and Smith, N J (2005) Development model for competitive construction industry in the people's republic of China. Journal of Construction Engineering and Management, 131(7), pp. 844-853. ISSN 0733-9364
Goodrum, P M and Dai, J (2005) Differences in occupational injuries, illnesses, and fatalities among Hispanic and non-Hispanic construction workers. Journal of Construction Engineering and Management, 131(9), pp. 1021-1028. ISSN 0733-9364
Kale, S and Arditi, D (2005) Diffusion of computer aided design technology in architectural design practice. Journal of Construction Engineering and Management, 131(10), pp. 1135-1141. ISSN 0733-9364
El-Diraby, T E and Kashif, K F (2005) Distributed ontology architecture for knowledge management in highway construction. Journal of Construction Engineering and Management, 131(5), pp. 591-603. ISSN 0733-9364
Uwakweh, B O (2005) Effect of foremen on construction apprentice. Journal of Construction Engineering and Management, 131(12), pp. 1320-1327. ISSN 0733-9364
Irizarry, J; Simonsen, K L and Abraham, D M (2005) Effect of safety and environmental variables on task durations in steel erection. Journal of Construction Engineering and Management, 131(12), pp. 1310-1319. ISSN 0733-9364
Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364
Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364
Chen, Z; Li, H and Wong, C T C (2005) Environalplanning: Analytic network process model for environmentally conscious construction planning. Journal of Construction Engineering and Management, 131(1), pp. 92-101. ISSN 0733-9364
Elazouni, A M; Ali, A E and Abdel-Razek, R H (2005) Estimating the acceptability of new formwork systems using neural networks. Journal of Construction Engineering and Management, 131(1), pp. 33-41. ISSN 0733-9364
Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Hanna, A S; Menches, C L; Sullivan, K T and Sargent, J R (2005) Factors affecting absenteeism in electrical construction. Journal of Construction Engineering and Management, 131(11), pp. 1212-1218. ISSN 0733-9364
Gunhan, S and Arditi, D (2005) Factors affecting international construction. Journal of Construction Engineering and Management, 131(3), pp. 273-282. ISSN 0733-9364
Sacks, R; Navon, R; Brodetskaia, I and Shapira, A (2005) Feasibility of automated monitoring of lifting equipment in support of project control. Journal of Construction Engineering and Management, 131(5), pp. 604-614. ISSN 0733-9364
Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364
Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364
Zhang, X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), pp. 656-668. ISSN 0733-9364
Thomas, H R; Riley, D R and Messner, J I (2005) Fundamental principles of site material management. Journal of Construction Engineering and Management, 131(7), pp. 808-815. ISSN 0733-9364
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Rojas, E M and Mukherjee, A (2005) General-purpose situational simulation environment for construction education. Journal of Construction Engineering and Management, 131(3), pp. 319-329. ISSN 0733-9364
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Chan, A T S and Chan, E H W (2005) Impact of perceived leadership styles on work outcomes: Case of building professionals. Journal of Construction Engineering and Management, 131(4), pp. 413-422. ISSN 0733-9364
Ibbs, W and Liu, M (2005) Improved measured mile analysis technique. Journal of Construction Engineering and Management, 131(12), pp. 1249-1256. ISSN 0733-9364
Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364
Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364
Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364
Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364
Walsh, K D; Sawhney, A and Brown Iv, A (2005) International comparison of cost for the construction sector: Purchasing power parity. Journal of Construction Engineering and Management, 131(2), pp. 160-167. ISSN 0733-9364
Gunhan, S and Arditi, D (2005) International expansion decision for construction companies. Journal of Construction Engineering and Management, 131(8), pp. 928-937. ISSN 0733-9364
Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364
Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364
Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364
Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364
Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364
Cox, R F; Issa, R R A and Koblegard, K (2005) Management's perception of key behavioral indicators for construction. Journal of Construction Engineering and Management, 131(3), pp. 368-376. ISSN 0733-9364
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364
Kululanga, G K and Price, A D F (2005) Measuring quality of writing of construction specifications. Journal of Construction Engineering and Management, 131(8), pp. 859-865. ISSN 0733-9364
Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364
Dunston, P S and Wang, X (2005) Mixed reality-based visualization interfaces for architecture, engineering, and construction industry. Journal of Construction Engineering and Management, 131(12), pp. 1301-1309. ISSN 0733-9364
Jin, X H and Ling, F Y Y (2005) Model for fostering trust and building relationships in China's construction industry. Journal of Construction Engineering and Management, 131(11), pp. 1224-1232. ISSN 0733-9364
Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364
Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364
Kajewski, S L (2005) Multilevel formwork load distribution with posttensioned slabs. Journal of Construction Engineering and Management, 131(2), pp. 203-210. ISSN 0733-9364
Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364
Fredericks, T K; Abudayyeh, O; Choi, S D; Wiersma, M and Charles, M (2005) Occupational injuries and fatalities in the roofing contracting industry. Journal of Construction Engineering and Management, 131(11), pp. 1233-1240. ISSN 0733-9364
El-Rayes, K and Hyari, K (2005) Optimal lighting arrangements for nighttime highway construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1292-1300. ISSN 0733-9364
Al-Hussein, M; Alkass, S and Moselhi, O (2005) Optimization algorithm for selection and on site location of mobile cranes. Journal of Construction Engineering and Management, 131(5), pp. 579-590. ISSN 0733-9364
Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364
Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364
Bernold, L E (2005) Paradigm shift in construction education is vital for the future of our profession. Journal of Construction Engineering and Management, 131(5), pp. 533-539. ISSN 0733-9364
Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364
Yiu, C Y; Ho, H K; Lo, S M and Hu, B Q (2005) Performance evaluation for cost estimators by reliability interval method. Journal of Construction Engineering and Management, 131(1), pp. 108-116. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Pile construction productivity assessment. Journal of Construction Engineering and Management, 131(6), pp. 705-714. ISSN 0733-9364
Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364
Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364
Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364
Dikmen, I; Birgonul, M T and Kiziltas, S (2005) Prediction of organizational effectiveness in construction companies. Journal of Construction Engineering and Management, 131(2), pp. 252-261. ISSN 0733-9364
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Zayed, T M (2005) Productivity and cost assessment for continuous flight auger piles. Journal of Construction Engineering and Management, 131(6), pp. 677-688. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364
Fisher, D J; Schluter, L and Toleti, P K (2005) Project management education and training process for career development. Journal of Construction Engineering and Management, 131(8), pp. 903-910. ISSN 0733-9364
Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Horman, M J and Kenley, R (2005) Quantifying levels of wasted time in construction with meta-analysis. Journal of Construction Engineering and Management, 131(1), pp. 52-61. ISSN 0733-9364
Kumaraswamy, M M; Rahman, M M; Ling, F Y Y and Phng, S T (2005) Reconstructing cultures for relational contracting. Journal of Construction Engineering and Management, 131(10), pp. 1065-1075. ISSN 0733-9364
Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364
Rahman, M M and Kumaraswamy, M M (2005) Relational selection for collaborative working arrangements. Journal of Construction Engineering and Management, 131(10), pp. 1087-1098. ISSN 0733-9364
Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364
Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364
El-Diraby, T E and Wang, B (2005) Society portal: Integrating urban highway construction projects into the knowledge city. Journal of Construction Engineering and Management, 131(11), pp. 1196-1211. ISSN 0733-9364
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364
Lueke, J S and Ariaratnam, S T (2005) Surface heave mechanisms in horizontal directional drilling. Journal of Construction Engineering and Management, 131(5), pp. 540-547. ISSN 0733-9364
Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364
Mohamed, Y and AbouRizk, S (2005) Technical knowledge consolidation using theory of inventive problem solving. Journal of Construction Engineering and Management, 131(9), pp. 993-1001. ISSN 0733-9364
Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364
Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364
Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364
El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364
El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364
Hinze, J (2005) Use of trench boxes for worker protection. Journal of Construction Engineering and Management, 131(4), pp. 494-500. ISSN 0733-9364
Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364
Georgy, M E; Chang, L M and Zhang, L (2005) Utility-function model for engineering performance assessment. Journal of Construction Engineering and Management, 131(5), pp. 558-568. ISSN 0733-9364
Ekström, M A and Björnsson, H C (2005) Valuing flexibility in architecture, engineering, and construction information technology investments. Journal of Construction Engineering and Management, 131(4), pp. 431-438. ISSN 0733-9364
Gambatese, J A; Behm, M and Hinze, J W (2005) Viability of designing for construction worker safety. Journal of Construction Engineering and Management, 131(9), pp. 1029-1036. ISSN 0733-9364
Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364
Lee, S H; Thomas, S R and Tucker, R L (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering and Management, 131(7), pp. 790-798. ISSN 0733-9364
Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Hinze, J; Huang, X and Terry, L (2005) The nature of struck-by accidents. Journal of Construction Engineering and Management, 131(2), pp. 262-268. ISSN 0733-9364