Browse by Journal

Number of items: 101.

Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364

Touran, A; Atgun, M and Bhurisith, I (2004) Analysis of the United States department of transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719-725. ISSN 0733-9364

Abudayyeh, O; Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of trends in construction research: 1985-2002. Journal of Construction Engineering and Management, 130(3), pp. 433-439. ISSN 0733-9364

Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364

Pietroforte, R and Stefani, T P (2004) Asce journal of construction engineering and management: Review of the years 1983-2000. Journal of Construction Engineering and Management, 130(3), pp. 440-448. ISSN 0733-9364

Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364

Fang, D P; Huang, X Y and Hinze, J (2004) Benchmarking studies on construction safety management in China. Journal of Construction Engineering and Management, 130(3), pp. 424-432. ISSN 0733-9364

Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364

Gransberg, D D; Karaca, I and Senadheera, S (2004) Calculating roller requirements for chip seal projects. Journal of Construction Engineering and Management, 130(3), pp. 378-384. ISSN 0733-9364

Hadikusumo, B H W and Rowlinson, S (2004) Capturing safety knowledge using design-for-safety-process tool. Journal of Construction Engineering and Management, 130(2), pp. 281-289. ISSN 0733-9364

Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364

Zhang, X (2004) Concessionaire selection: Methods and criteria. Journal of Construction Engineering and Management, 130(2), pp. 235-244. ISSN 0733-9364

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2004) Constructability concepts in Kuala Selangor cable-stayed bridge in Malaysia. Journal of Construction Engineering and Management, 130(3), pp. 315-321. ISSN 0733-9364

Trigunarsyah, B (2004) Constructability practices among construction contractors in Indonesia. Journal of Construction Engineering and Management, 130(5), pp. 656-669. ISSN 0733-9364

Chinowsky, P S and Diekmann, J E (2004) Construction engineering management educators: History and deteriorating community. Journal of Construction Engineering and Management, 130(5), pp. 751-758. ISSN 0733-9364

Cheung, S O; Yiu, K T W and Suen, H (2004) Construction negotiation online. Journal of Construction Engineering and Management, 130(6), pp. 844-852. ISSN 0733-9364

Wong, C H (2004) Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. ISSN 0733-9364

Whalen, T M; Gopal, S and Abraham, D M (2004) Cost-benefit model for the construction of tornado shelters. Journal of Construction Engineering and Management, 130(6), pp. 772-779. ISSN 0733-9364

Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364

Shohet, I M and Perelstein, E (2004) Decision support model for the allocation of resources in rehabilitation projects. Journal of Construction Engineering and Management, 130(2), pp. 249-257. ISSN 0733-9364

Chung, T H; Abraham, D M and Gokhale, S B (2004) Decision support system for microtunneling applications. Journal of Construction Engineering and Management, 130(6), pp. 835-843. ISSN 0733-9364

Cheng, E W L and Li, H (2004) Development of a practical model of partnering for construction projects. Journal of Construction Engineering and Management, 130(6), pp. 790-798. ISSN 0733-9364

Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364

Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2004) Effective practice utilization using performance prediction software. Journal of Construction Engineering and Management, 130(4), pp. 576-585. ISSN 0733-9364

Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364

Cheah, C Y J; Garvin, M J and Miller, J B (2004) Empirical study of strategic performance of global construction firms. Journal of Construction Engineering and Management, 130(6), pp. 808-817. ISSN 0733-9364

Christini, G; Fetsko, M and Hendrickson, C (2004) Environmental management systems and ISO 14001 certification for construction firms. Journal of Construction Engineering and Management, 130(3), pp. 330-336. ISSN 0733-9364

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Jeong, H S; Abraham, D M and Lew, J J (2004) Evaluation of an emerging market in subsurface utility engineering. Journal of Construction Engineering and Management, 130(2), pp. 225-234. ISSN 0733-9364

Chan, A P C; Chan, D W M; Chiang, Y H; Tang, B S; Chan, E H W and Ho, K S K (2004) Exploring critical success factors for partnering in construction projects. Journal of Construction Engineering and Management, 130(2), pp. 188-198. ISSN 0733-9364

Chew, M Y L and De Silva, N (2004) Factorial method for performance assessment of building facades. Journal of Construction Engineering and Management, 130(4), pp. 525-533. ISSN 0733-9364

Chan, A P C; Scott, D and Chan, A P L (2004) Factors affecting the success of a construction project. Journal of Construction Engineering and Management, 130(1), pp. 153-155. ISSN 0733-9364

Bobick, T G (2004) Falls through roof and floor openings and surfaces, including skylights: 1992-2000. Journal of Construction Engineering and Management, 130(6), pp. 895-907. ISSN 0733-9364

Arboleda, C A and Abraham, D M (2004) Fatalities in trenching operations-analysis using models of accident causation. Journal of Construction Engineering and Management, 130(2), pp. 273-280. ISSN 0733-9364

Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364

Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364

Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364

Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364

Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364

Seo, S; Aramaki, T; Hwang, Y and Hanaki, K (2004) Fuzzy decision-making tool for environmental sustainable buildings. Journal of Construction Engineering and Management, 130(3), pp. 415-423. ISSN 0733-9364

Zhong, D; Li, J; Zhu, H and Song, L (2004) Geographic information system-based visual simulation methodology and its application in concrete dam construction processes. Journal of Construction Engineering and Management, 130(5), pp. 742-750. ISSN 0733-9364

Goodrum, P M (2004) Hispanic and non-Hispanic wage differentials: Implications for United States construction industry. Journal of Construction Engineering and Management, 130(4), pp. 552-559. ISSN 0733-9364

Treloar, G J; Love, P E D and Crawford, R H (2004) Hybrid life-cycle inventory for road construction and use. Journal of Construction Engineering and Management, 130(1), pp. 43-49. ISSN 0733-9364

Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364

Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364

Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364

Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364

Zhang, X (2004) Improving concessionaire selection protocols in public/ private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5), pp. 670-679. ISSN 0733-9364

Chua, D K H and Goh, Y M (2004) Incident causation model for improving feedback of safety knowledge. Journal of Construction Engineering and Management, 130(4), pp. 542-551. ISSN 0733-9364

Goodrum, P M and Haas, C T (2004) Long-term impact of equipment technology on labor productivity in the U.S. Construction industry at the activity level. Journal of Construction Engineering and Management, 130(1), pp. 124-133. ISSN 0733-9364

Li, K Y K and Chan, A T (2004) Management of radon in tunnel drilling. Journal of Construction Engineering and Management, 130(5), pp. 699-707. ISSN 0733-9364

Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364

Bossink, B A G (2004) Managing drivers of innovation in construction networks. Journal of Construction Engineering and Management, 130(3), pp. 337-345. ISSN 0733-9364

Shen, L Y; Tam, V W Y; Tam, C M and Drew, D (2004) Mapping approach for examining waste management on construction sites. Journal of Construction Engineering and Management, 130(4), pp. 472-481. ISSN 0733-9364

Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364

Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364

Han, S H; Diekmann, J E; Lee, Y and Ock, J H (2004) Multicriteria financial portfolio risk management for international projects. Journal of Construction Engineering and Management, 130(3), pp. 346-356. ISSN 0733-9364

Marzouk, M and Moselhi, O (2004) Multiobjective optimization of earthmoving operations. Journal of Construction Engineering and Management, 130(1), pp. 105-113. ISSN 0733-9364

Rowe, G M; Meegoda, J N; Jumikis, A; Sharrock, M J; Bandara, N and Hettiarachchi, C H (2004) NJTxtr: a computer program based on laser to monitor asphalt segregation. Journal of Construction Engineering and Management, 130(6), pp. 924-934. ISSN 0733-9364

Dikmen, I and Birgonul, M T (2004) Neural network model to support international market entry decisions. Journal of Construction Engineering and Management, 130(1), pp. 59-66. ISSN 0733-9364

Anderson, S D; Patil, S S; Gibson Jr, G E and Sullivan, G R (2004) Owner-contractor work structures: Process approach. Journal of Construction Engineering and Management, 130(5), pp. 680-690. ISSN 0733-9364

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Cho, Y K; Haas, C T; Sreenivasan, S V and Liapi, K (2004) Position error modeling for automated construction manipulators. Journal of Construction Engineering and Management, 130(1), pp. 50-58. ISSN 0733-9364

Stewart, J; Minchin, R E; Jaselskis, E J; Dayal, V and Smith, G (2004) Potential construction applications for thermoset composite scrap material. Journal of Construction Engineering and Management, 130(2), pp. 199-205. ISSN 0733-9364

Barker, R; Childerhouse, P; Naim, M; Masat, J and Wilson, D (2004) Potential of total cycle time compression in construction: Focus on program development and design. Journal of Construction Engineering and Management, 130(2), pp. 177-187. ISSN 0733-9364

Warszawski, A and Sacks, R (2004) Practical multifactor approach to evaluating risk of investment in engineering projects. Journal of Construction Engineering and Management, 130(3), pp. 357-367. ISSN 0733-9364

Koksal, A and Arditi, D (2004) Predicting construction company decline. Journal of Construction Engineering and Management, 130(6), pp. 799-807. ISSN 0733-9364

Sillars, D N and Kangari, R (2004) Predicting organizational success within a project-based joint venture alliance. Journal of Construction Engineering and Management, 130(4), pp. 500-508. ISSN 0733-9364

Ling, F Y Y; Chan, S L; Chong, E and Ee, L P (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), pp. 75-83. ISSN 0733-9364

Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364

Abd El Halim, A E H O and Haas, R (2004) Process and case illustration of construction innovation. Journal of Construction Engineering and Management, 130(4), pp. 570-575. ISSN 0733-9364

Sacks, R; Eastman, C M and Lee, G (2004) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management, 130(2), pp. 206-215. ISSN 0733-9364

Zayed, T M and Halpin, D W (2004) Process versus data oriented techniques in pile construction productivity assessment. Journal of Construction Engineering and Management, 130(4), pp. 490-499. ISSN 0733-9364

Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364

Hauck, A J; Walker, D H T; Hampson, K D and Peters, R J (2004) Project alliancing at national museum of Australia: collaborative process. Journal of Construction Engineering and Management, 130(1), pp. 143-152. ISSN 0733-9364

Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364

O'Connor, J T and Yang, L R (2004) Project performance versus use of technologies at project and phase levels. Journal of Construction Engineering and Management, 130(3), pp. 322-329. ISSN 0733-9364

Liu, J and Rahbar, F (2004) Project time-cost trade-off optimization by maximal flow theory. Journal of Construction Engineering and Management, 130(4), pp. 607-609. ISSN 0733-9364

Chan, S L and Leung, N N (2004) Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), pp. 935-943. ISSN 0733-9364

Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364

Deng, X; Ding, S and Tian, Q (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, 130(1), pp. 67-74. ISSN 0733-9364

Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364

Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364

Choi, H H; Cho, H N and Seo, J W (2004) Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130(2), pp. 258-272. ISSN 0733-9364

Fang, D; Fong, P S W and Li, M (2004) Risk assessment model of tendering for Chinese building projects. Journal of Construction Engineering and Management, 130(6), pp. 862-868. ISSN 0733-9364

Fang, D; Li, M; Fong, P S W and Shen, L (2004) Risks in Chinese construction market: contractors' perspective. Journal of Construction Engineering and Management, 130(6), pp. 853-861. ISSN 0733-9364

Tam, C M; Tong, T K L and Wong, Y W (2004) Selection of concrete pump using the superiority and inferiority ranking method. Journal of Construction Engineering and Management, 130(6), pp. 827-834. ISSN 0733-9364

Shr, J F and Chen, W T (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. Journal of Construction Engineering and Management, 130(1), pp. 84-93. ISSN 0733-9364

Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364

Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364

Peng, J L (2004) Structural modeling and design considerations for double-layer shoring systems. Journal of Construction Engineering and Management, 130(3), pp. 368-377. ISSN 0733-9364

Thomas, H R; Horman, M J and De Souza, U E L (2004) Symbiotic crew relationships and labor flow. Journal of Construction Engineering and Management, 130(6), pp. 908-917. ISSN 0733-9364

Schexnayder, C J; Weber, S L and David, S A (2004) Transportation agency use of owner-controlled insurance programs. Journal of Construction Engineering and Management, 130(4), pp. 517-524. ISSN 0733-9364

Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364

Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364

Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364

Lingard, H (2004) Work and family sources of burnout in the Australian engineering profession: Comparison of respondents in dual- and single-earner couples, parents, and nonparents. Journal of Construction Engineering and Management, 130(2), pp. 290-298. ISSN 0733-9364

Shapira, A (2004) Work inputs and related economic aspects of multitier shoring towers. Journal of Construction Engineering and Management, 130(1), pp. 134-142. ISSN 0733-9364

Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364

This list was generated on Mon Apr 28 11:24:29 2025 UTC.