Browse by Journal

Number of items: 56.

Shi, J J (1999) Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management, 125(5), pp. 354-360. ISSN 0733-9364

Li, H; Shen, L Y and Love, P E D (1999) Ann-based mark-up estimation system with self-explanatory capacities. Journal of Construction Engineering and Management, 125(3), pp. 185-189. ISSN 0733-9364

Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364

Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364

Jahren, C T; Ellsworth, B J and Bergeson, K (1999) Constructability test for cold in-place asphalt recycling. Journal of Construction Engineering and Management, 125(5), pp. 325-329. ISSN 0733-9364

Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364

Shapira, A (1999) Contemporary trends in formwork standards: a case study. Journal of Construction Engineering and Management, 125(2), pp. 69-75. ISSN 0733-9364

Chua, D K H; Kog, Y C and Loh, P K (1999) Critical success factors for different project objectives. Journal of Construction Engineering and Management, 125(3), pp. 142-150. ISSN 0733-9364

Ueki, M; Haas, C T and Seo, J (1999) Decision tool for microtunneling method selection. Journal of Construction Engineering and Management, 125(2), pp. 123-131. ISSN 0733-9364

Zouein, P P and Tommelein, I D (1999) Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125(6), pp. 400-408. ISSN 0733-9364

Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364

Zhu, B (1999) Effect of cooling by water flowing in nonmetal pipes embedded in mass concrete. Journal of Construction Engineering and Management, 125(1), pp. 61-68. ISSN 0733-9364

Schexnayder, C; Weber, S L and Brooks, B T (1999) Effect of truck payload weight on production. Journal of Construction Engineering and Management, 125(1), pp. 1-7. ISSN 0733-9364

Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364

Martinez, J C and Ioannou, P G (1999) General-purpose systems for effective construction simulation. Journal of Construction Engineering and Management, 125(4), pp. 265-276. ISSN 0733-9364

Kartam, S (1999) Generic methodology for analyzing delay claims. Journal of Construction Engineering and Management, 125(6), pp. 409-419. ISSN 0733-9364

Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364

Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364

Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364

Torbica, Z M and Stroh, R C (1999) Impact of total quality management on home-buyer satisfaction. Journal of Construction Engineering and Management, 125(3), pp. 198-203. ISSN 0733-9364

Chan, E H W and Chan, A T S (1999) Imposing ISO 9000 quality assurance system on statutory agents in Hong Kong. Journal of Construction Engineering and Management, 125(4), pp. 285-291. ISSN 0733-9364

Alhozaimy, A M and Al-Negheimish, A I (1999) Introducing and managing quality scheme for rmc industry in Saudi Arabia. Journal of Construction Engineering and Management, 125(4), pp. 249-255. ISSN 0733-9364

Dulaimi, M F and Langford, D (1999) Job behavior of construction project managers: Determinants and assessment. Journal of Construction Engineering and Management, 125(4), pp. 256-264. ISSN 0733-9364

Kululanga, G K; McCaffer, R; Price, A D F and Edum-Fotwe, F (1999) Learning mechanisms employed by construction contractors. Journal of Construction Engineering and Management, 125(4), pp. 215-223. ISSN 0733-9364

Zhang, P; Harris, F C; Olomolaiye, P O and Holt, G D (1999) Location optimization for a group of tower cranes. Journal of Construction Engineering and Management, 125(2), pp. 115-122. ISSN 0733-9364

Thomas, H R; Riley, D R and Sanvido, V E (1999) Loss of labor productivity due to delivery methods and weather. Journal of Construction Engineering and Management, 125(1), pp. 39-46. ISSN 0733-9364

Shi, J J (1999) Mathematical models for maximizing aggregate plant production. Journal of Construction Engineering and Management, 125(1), pp. 53-60. ISSN 0733-9364

Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364

Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364

El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364

Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364

Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364

Faniran, O O; Love, P E D and Li, H (1999) Optimal allocation of construction planning resources. Journal of Construction Engineering and Management, 125(5), pp. 311-319. ISSN 0733-9364

Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364

Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364

Everett, J G (1999) Overexertion injuries in construction. Journal of Construction Engineering and Management, 125(2), pp. 109-114. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Conley, M A and Gregory, R A (1999) Partnering on small construction projects. Journal of Construction Engineering and Management, 125(5), pp. 320-324. ISSN 0733-9364

Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364

Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1999) Political risks: Analysis of key contract clauses in China's BOT project. Journal of Construction Engineering and Management, 125(3), pp. 190-197. ISSN 0733-9364

Gransberg, D D; Dillon, W D; Reynolds, L and Boyd, J (1999) Quantitative analysis of partnered project performance. Journal of Construction Engineering and Management, 125(3), pp. 161-166. ISSN 0733-9364

Mulholland, B and Christian, J (1999) Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), pp. 8-15. ISSN 0733-9364

Bing, L; Tiong, R L K; Fan, W W and Chew, D A S (1999) Risk management in international construction joint ventures. Journal of Construction Engineering and Management, 125(4), pp. 277-284. ISSN 0733-9364

Bing, L and Tiong, R L K (1999) Risk management model for international construction joint ventures. Journal of Construction Engineering and Management, 125(5), pp. 377-384. ISSN 0733-9364

Lippiatt, B C (1999) Selecting cost-effective green building products: Bees approach. Journal of Construction Engineering and Management, 125(6), pp. 448-455. ISSN 0733-9364

Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364

Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364

Mitropoulos, P and Tatum, C B (1999) Technology adoption decisions in construction organizations. Journal of Construction Engineering and Management, 125(5), pp. 330-338. ISSN 0733-9364

Abdelhamid, T S and Everett, J G (1999) Time series analysis for construction productivity experiments. Journal of Construction Engineering and Management, 125(2), pp. 87-95. ISSN 0733-9364

Li, H; Cao, J N and Love, P E D (1999) Using machine learning and GA to solve time-cost trade-off problems. Journal of Construction Engineering and Management, 125(5), pp. 347-353. ISSN 0733-9364

Ariaratnam, S T; Lueke, J S and Allouche, E N (1999) Utilization of trenchless construction methods by Canadian municipalities. Journal of Construction Engineering and Management, 125(2), pp. 76-86. ISSN 0733-9364

Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364

Abeysinghe, G and Urand, D (1999) Why use enactable models of construction processes? Journal of Construction Engineering and Management, 125(6), pp. 437-447. ISSN 0733-9364

Finke, M R (1999) Window analyses of compensable delays. Journal of Construction Engineering and Management, 125(2), pp. 96-100. ISSN 0733-9364

Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364

This list was generated on Mon Apr 28 11:24:09 2025 UTC.