Browse by Journal
de La Garza, J M; Hancher, D E and Decker, L (1998) Analysis of safety indicators in construction. Journal of Construction Engineering and Management, 124(4), pp. 312-314. ISSN 0733-9364
Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364
Jaselskis, E J and Talukhaba, A (1998) Bidding considerations in developing countries. Journal of Construction Engineering and Management, 124(3), pp. 185-193. ISSN 0733-9364
Shash, A A (1998) Bidding practices of subcontractors in Colorado. Journal of Construction Engineering and Management, 124(3), pp. 219-231. ISSN 0733-9364
Kale, S and Arditi, D (1998) Business failures: Liabilities of newness, adolescence, and smallness. Journal of Construction Engineering and Management, 124(6), pp. 458-464. ISSN 0733-9364
Konchar, M and Sanvido, V (1998) Comparison of U.S. Project delivery systems. Journal of Construction Engineering and Management, 124(6), pp. 435-444. ISSN 0733-9364
Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364
Fayek, A (1998) Competitive bidding strategy model and software system for bid preparation. Journal of Construction Engineering and Management, 124(1), pp. 1-10. ISSN 0733-9364
Shen, L and Song, W (1998) Competitive tendering practice in Chinese construction. Journal of Construction Engineering and Management, 124(2), pp. 155-161. ISSN 0733-9364
Sonmez, R and Rowings, J E (1998) Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 124(6), pp. 498-504. ISSN 0733-9364
Eskins, W A (1998) Construction of the new Coleman Bridge: Fifth Roebling lecture, 1997. Journal of Construction Engineering and Management, 124(3), pp. 173-175. ISSN 0733-9364
LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364
Thomas, S R; Tucker, R L and Kelly, W R (1998) Critical communications variables. Journal of Construction Engineering and Management, 124(1), pp. 58-66. ISSN 0733-9364
Minato, T and Ashley, D B (1998) Data-driven analysis of corporate risk using historical cost-control data. Journal of Construction Engineering and Management, 124(1), pp. 42-47. ISSN 0733-9364
Abraham, D M and Dickinson, R J (1998) Disposal costs for environmentally regulated facilities: LCC approach. Journal of Construction Engineering and Management, 124(2), pp. 146-154. ISSN 0733-9364
Everett, J G and Kelly, D L (1998) Drywall joint finishing: Productivity and ergonomics. Journal of Construction Engineering and Management, 124(5), pp. 347-353. ISSN 0733-9364
Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364
Wang, S Q; Tiong, R L K; Ting, S K; Chew, D and Ashley, D (1998) Evaluation and competitive tendering of BOT power plant project in China. Journal of Construction Engineering and Management, 124(4), pp. 333-341. ISSN 0733-9364
Arditi, D and Gunaydin, H M (1998) Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194-203. ISSN 0733-9364
Johnson, H M; Singh, A and Young, R H F (1998) Fall protection analysis for workers on residential roofs. Journal of Construction Engineering and Management, 124(5), pp. 418-428. ISSN 0733-9364
Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364
Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364
Camfield, F E (1998) Guidelines for quarrystone armor units. Journal of Construction Engineering and Management, 124(6), pp. 465-479. ISSN 0733-9364
Rilett, L R (1998) Identifying component variability of end product specification tests. Journal of Construction Engineering and Management, 124(2), pp. 133-138. ISSN 0733-9364
Hinze, J; Pedersen, C and Fredley, J (1998) Identifying root causes of construction injuries. Journal of Construction Engineering and Management, 124(1), pp. 67-71. ISSN 0733-9364
Hsieh, T Y (1998) Impact of subcontracting on site productivity: Lessons learned in Taiwan. Journal of Construction Engineering and Management, 124(2), pp. 91-100. ISSN 0733-9364
Warszawski, A and Navon, R (1998) Implementation of robotics in building: Current status and future prospects. Journal of Construction Engineering and Management, 124(1), pp. 31-41. ISSN 0733-9364
Arditi, D and Yasamis, F (1998) Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), pp. 361-373. ISSN 0733-9364
Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364
Hancher, D E (1998) Innovations in highway construction: Twelfth Peurifoy lecture, 1997. Journal of Construction Engineering and Management, 124(5), pp. 343-346. ISSN 0733-9364
Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364
Faniran, O O; Oluwoye, J O and Lenard, D J (1998) Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), pp. 245-256. ISSN 0733-9364
Herbsman, Z J and Glagola, C R (1998) Lane rental: innovative way to reduce road construction time. Journal of Construction Engineering and Management, 124(5), pp. 411-417. ISSN 0733-9364
Harmelink, D J and Rowings, J E (1998) Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management, 124(4), pp. 263-268. ISSN 0733-9364
Harper, R S and Koehn, E (1998) Managing industrial construction safety in southeast Texas. Journal of Construction Engineering and Management, 124(6), pp. 452-457. ISSN 0733-9364
Rosenfeld, Y; Navon, R and Cohen, L (1998) Methodology for prioritizing cost-effective construction technologies. Journal of Construction Engineering and Management, 124(3), pp. 176-184. ISSN 0733-9364
Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364
Hajjar, D and Abourizk, S M (1998) Modeling and analysis of aggregate production operations. Journal of Construction Engineering and Management, 124(5), pp. 390-401. ISSN 0733-9364
Slaughter, E S (1998) Models of construction innovation. Journal of Construction Engineering and Management, 124(3), pp. 226-231. ISSN 0733-9364
Saad, I M H and Hancher, D E (1998) Multimedia for construction project management: Project navigator. Journal of Construction Engineering and Management, 124(1), pp. 82-89. ISSN 0733-9364
Burleson, R C; Haas, C T; Tucker, R L and Stanley, A (1998) Multiskilled labor utilization strategies in construction. Journal of Construction Engineering and Management, 124(6), pp. 480-489. ISSN 0733-9364
Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364
Abraham, D M; Wirahadikusumah, R; Short, T J and Shahbahrami, S (1998) Optimization modeling for sewer network management. Journal of Construction Engineering and Management, 124(5), pp. 402-410. ISSN 0733-9364
Maxwell, D A; Back, W E and Toon, J (1998) Optimization of crew configurations using activity-based costing. Journal of Construction Engineering and Management, 124(2), pp. 162-168. ISSN 0733-9364
Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364
Ohrn, L G and Schexnayder, C (1998) Performance-related specifications for highway construction. Journal of Construction Engineering and Management, 124(1), pp. 25-30. ISSN 0733-9364
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Abdel-Razek, R H (1998) Quality improvement in Egypt: Methodology and implementation. Journal of Construction Engineering and Management, 124(5), pp. 354-360. ISSN 0733-9364
Yeh, I C (1998) Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management, 124(5), pp. 374-380. ISSN 0733-9364
Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364
Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364
Ben-Haim, Y and Laufer, A (1998) Robust reliability of projects with activity-duration uncertainty. Journal of Construction Engineering and Management, 124(2), pp. 125-131. ISSN 0733-9364
Harris, R B and Ioannou, P G (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), pp. 269-278. ISSN 0733-9364
Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364
Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
Shash, A A (1998) Subcontractors' bidding decisions. Journal of Construction Engineering and Management, 124(2), pp. 101-106. ISSN 0733-9364
Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364
Sinfield, J V and Einstein, H H (1998) Tunnel construction costs for tube transportation systems. Journal of Construction Engineering and Management, 124(1), pp. 48-57. ISSN 0733-9364
Toole, T M (1998) Uncertainty and home builders' adoption of technological innovations. Journal of Construction Engineering and Management, 124(4), pp. 323-332. ISSN 0733-9364
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364