Browse by Journal
Stephenson, P; Morrey, I; Vacher, P and Ahmed, Z (2002) Acquisition and structuring of knowledge for defect prediction in brickwork mortar. Engineering, Construction and Architectural Management, 9(5-6), pp. 396-408. ISSN 0969-9988
Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988
den Otter, A F and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(3), pp. 162-173. ISSN 0969-9988
Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988
Mrad, F; Asem Abdul-Malak, M; Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(4), pp. 325-335. ISSN 0969-9988
Psilander, K (2002) Axiomatic design in the customizing home building industry. Engineering, Construction and Architectural Management, 9(4), pp. 318-324. ISSN 0969-9988
Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(2), pp. 66-80. ISSN 0969-9988
Heintz, J L (2002) Collaborative design planning networks. Engineering, Construction and Architectural Management, 9(3), pp. 181-191. ISSN 0969-9988
Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988
Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(3), pp. 222-231. ISSN 0969-9988
Watson, R; Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data: Managing electronic project specification information. Engineering, Construction and Architectural Management, 9(3), pp. 272-283. ISSN 0969-9988
Jefferies, M; Gameson, R O D and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: Reflections from the stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), pp. 352-361. ISSN 0969-9988
Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988
Fox, S; Marsh, L and Cockerham, G (2002) How building design imperatives constrain construction productivity and quality. Engineering, Construction and Architectural Management, 9(5-6), pp. 378-387. ISSN 0969-9988
Whyte, J; Bouchlaghem, D and Thorpe, T (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9(5-6), p. 371. ISSN 0969-9988
Ofori, G; Leong, C and Pin, T E O (2002) Impact of foreign contractors on Singapore construction industry: A qualitative study. Engineering, Construction and Architectural Management, 9(1), pp. 16-28. ISSN 0969-9988
Austin, S A; Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(3), pp. 249-258. ISSN 0969-9988
Cox, A and Ireland, P (2002) Managing construction supply chains: The common sense approach. Engineering, Construction and Architectural Management, 9(5-6), pp. 409-418. ISSN 0969-9988
Lockley, S R; Watson, R and Shaaban, S (2002) Managing e-commerce in construction: Revolution or e-business as usual? Engineering, Construction and Architectural Management, 9(3), pp. 232-240. ISSN 0969-9988
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
De Wilde, P; Augenbroe, G and Van Der Voorden, M (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(3), pp. 192-208. ISSN 0969-9988
Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988
Macmillan, S; Steele, J; Kirby, P; Spence, R and Austin, S (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(3), pp. 174-180. ISSN 0969-9988
Hwee Lim, E N G and Yean Yng Ling, F (2002) Model for predicting clients' contribution to project success. Engineering, Construction and Architectural Management, 9(5-6), pp. 388-395. ISSN 0969-9988
Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988
Augenbroe, G; Verheij, H and Schwarzm Ller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(3), pp. 259-271. ISSN 0969-9988
Motiar Rahman, M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: Moving towards joint risk management. Engineering, Construction and Architectural Management, 9(2), pp. 131-151. ISSN 0969-9988
Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988
Love, P E D; Holt, G D and Li, H (2002) Triangulation in construction management research. Engineering, Construction and Architectural Management, 9(4), pp. 294-303. ISSN 0969-9988
Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(3), pp. 209-221. ISSN 0969-9988
Skitmore, M and Lo, H P (2002) A method for identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(2), pp. 90-130. ISSN 0969-9988
Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988
Love, P E D; Irani, Z; Cheng, E and Li, H (2002) A model for supporting inter-organizational relations in the supply chain. Engineering, Construction and Architectural Management, 9(1), pp. 2-15. ISSN 0969-9988
Mahdi, I M; Riley, M J; Fereig, S M and Alex, A P (2002) A multi-criteria approach to contractor selection. Engineering, Construction and Architectural Management, 9(1), pp. 29-37. ISSN 0969-9988
Atkinson, A R (2002) The pathology of building defects; a human error approach. Engineering, Construction and Architectural Management, 9(1), pp. 53-61. ISSN 0969-9988
Johnson, R; Clayton, M; Xia, G E; Woo, J H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(3), pp. 241-248. ISSN 0969-9988
Wild, A (2002) The unmanageability of construction and the theoretical psycho-social dynamics of projects. Engineering, Construction and Architectural Management, 9(4), pp. 345-351. ISSN 0969-9988
Sarshar, M; Murat Tanyer, A; Aouad, G and Underwood, J (2002) A vision for construction IT 2005 2010: Two case studies. Engineering, Construction and Architectural Management, 9(2), pp. 152-160. ISSN 0969-9988