Browse by Journal

Number of items: 35.

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(2), pp. 133-144. ISSN 0969-9988

Emmitt, S (1999) Architectural management: An evolving field. Engineering, Construction and Architectural Management, 6(2), pp. 188-196. ISSN 0969-9988

Abraham, D M and Joanne Yeh, M H (1999) Breakwater construction: An effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(2), pp. 145-154. ISSN 0969-9988

Bowen, P A; Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: A South African study. Engineering, Construction and Architectural Management, 6(2), pp. 91-104. ISSN 0969-9988

Thomas Ng, S; Martin Skitmore, R and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(2), pp. 155-165. ISSN 0969-9988

Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988

Lansley, P R (1999) Determinants of performance of UK universities in built environment and town and country planning research. Engineering, Construction and Architectural Management, 6(4), pp. 391-402. ISSN 0969-9988

Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988

Hassan, T M; McCaffer, R O N and Thorpe, T (1999) Emerging clients' needs for large scale engineering projects. Engineering, Construction and Architectural Management, 6(1), pp. 21-29. ISSN 0969-9988

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988

Hannus, M; Luiten, G T; Watson, A S; Deguine, M; Sauce, G and Van Rijn, T P J (1999) ICT tools for improving the competitiveness of the LSE industry. Engineering, Construction and Architectural Management, 6(1), pp. 30-37. ISSN 0969-9988

Damodaran, L; Rubek Hansen, J; Hassan, T M and Olphert, C W (1999) Impact of large scale engineering products and processes on society: The eLSEwise view. Engineering, Construction and Architectural Management, 6(1), pp. 63-70. ISSN 0969-9988

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: Object flow and relationship. Engineering, Construction and Architectural Management, 6(2), pp. 197-212. ISSN 0969-9988

Mitrovic, D; Male, S; Hunter, I A N and Watson, A (1999) Large scale engineering project process and user requirements. Engineering, Construction and Architectural Management, 6(1), pp. 38-50. ISSN 0969-9988

Wantanakorn, D; Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(2), pp. 112-120. ISSN 0969-9988

Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988

Boussabaine, A H; Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(3), pp. 213-224. ISSN 0969-9988

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988

Matthews, J and Rowlinson, S (1999) Partnering: Incorporating safety management. Engineering, Construction and Architectural Management, 6(4), pp. 347-357. ISSN 0969-9988

Gunner, J and Skitmore, M (1999) Pre-bid building price forecasting accuracy: Price intensity theory. Engineering, Construction and Architectural Management, 6(3), pp. 267-275. ISSN 0969-9988

Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988

Ahmed, S M; Ahmad, R and Darshi De Saram, D (1999) Risk management trends in the Hong Kong construction industry: A comparison of contractors and owners perceptions. Engineering, Construction and Architectural Management, 6(3), pp. 225-234. ISSN 0969-9988

Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988

Male, S and Mitrovic, D (1999) Trends in world markets and the LSE industry. Engineering, Construction and Architectural Management, 6(1), pp. 7-20. ISSN 0969-9988

Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(2), pp. 121-132. ISSN 0969-9988

Melson, S and Kronstam, T (1999) An approach to infrastructure client projects. Engineering, Construction and Architectural Management, 6(1), pp. 71-77. ISSN 0969-9988

Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), pp. 256-266. ISSN 0969-9988

Garas, F and Hunter, I A N (1999) The elsewise initiative. Engineering, Construction and Architectural Management, 6(1), pp. 3-6. ISSN 0969-9988

Hunter, I A N; Mitrovic, D; Hassan, T M; Gayoso, A and Garas, F (1999) The elsewise vision, development routes and recommendations. Engineering, Construction and Architectural Management, 6(1), pp. 51-62. ISSN 0969-9988

Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(3), pp. 276-286. ISSN 0969-9988

Jaafari, A L I and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(3), pp. 235-255. ISSN 0969-9988

Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988

Walker, A and Kwong Wing, C (1999) The relationship between construction project management theory and transaction cost economics. Engineering, Construction and Architectural Management, 6(2), pp. 166-176. ISSN 0969-9988

Liu, A M M (1999) A research model of project complexity and goal commitment effects on project outcome. Engineering, Construction and Architectural Management, 6(2), pp. 105-111. ISSN 0969-9988

Whyte, J; Bouchlaghem, N; Thorpe, A and McCaffer, R O N (1999) A survey of CAD and virtual reality within the house building industry. Engineering, Construction and Architectural Management, 6(4), pp. 371-379. ISSN 0969-9988

This list was generated on Mon Apr 28 11:24:49 2025 UTC.