Browse by Journal
Bhattacharya, S and Momaya, K S (2021) Actionable strategy framework for digital transformation in AECO industry. Engineering, Construction and Architectural Management, 28(5), pp. 1397-1422. ISSN 09699988
Keskin, B; Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(2), pp. 530-548. ISSN 09699988
Sirin, O; Gunduz, M and Shamiyeh, M E (2021) Application of analytic hierarchy process (AHP) for sustainable pavement performance management in qatar. Engineering, Construction and Architectural Management, 28(10), pp. 3106-3122. ISSN 09699988
Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 09699988
Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 09699988
Umar, T (2021) Applications of drones for safety inspection in the gulf cooperation council construction. Engineering, Construction and Architectural Management, 28(9), pp. 2337-2360. ISSN 09699988
El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 09699988
Naji, K; Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), pp. 3060-3077. ISSN 09699988
Mantha, B R K and García de Soto, B (2021) Assessment of the cybersecurity vulnerability of construction networks. Engineering, Construction and Architectural Management, 28(10), pp. 3078-3105. ISSN 09699988
ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 09699988
Sanhudo, L; Poças Martins, J; Ramos, N M M; Almeida, R M S F; Rocha, A; Pinto, D; Barreira, E and Simões, M L (2021) BIM framework for the specification of information requirements in energy-related projects. Engineering, Construction and Architectural Management, 28(10), pp. 3123-3143. ISSN 09699988
Kamunda, A; Renukappa, S; Suresh, S and Jallow, H (2021) BIM in the water industry: Addressing challenges to improve the project delivery process. Engineering, Construction and Architectural Management, 28(2), pp. 510-529. ISSN 09699988
Barkokebas, B; Khalife, S; Al-Hussein, M and Hamzeh, F (2021) A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction. Engineering, Construction and Architectural Management, 28(8), pp. 2155-2175. ISSN 09699988
Li, Z; Zhang, S; Meng, Q and Hu, X (2021) Barriers to the development of prefabricated buildings in China: A news coverage analysis. Engineering, Construction and Architectural Management, 28(10), pp. 2884-2903. ISSN 09699988
Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2021) Best practices of organizational change for adopting alternative project delivery methods in the AEC industry. Engineering, Construction and Architectural Management, 28(4), pp. 1060-1082. ISSN 09699988
Sang, L; Yu, M; Lin, H; Zhang, Z and Jin, R (2021) Big data, technology capability and construction project quality: A cross-level investigation. Engineering, Construction and Architectural Management, 28(3), pp. 706-727. ISSN 09699988
Cheng, M; Liu, G and Xu, Y (2021) Can joint-contract functions promote PPP project sustainability performance? A moderated mediation model. Engineering, Construction and Architectural Management, 28(9), pp. 2667-2689. ISSN 09699988
Liu, Y; Amini-Abyaneh, A; Hertogh, M; Houwing, E J and Bakker, H (2021) Collaborate to learn and learn to collaborate: A case of exploitative learning in the inter-organizational project. Engineering, Construction and Architectural Management, 28(3), pp. 809-830. ISSN 09699988
Zhan, W; Pan, W and Chen, L (2021) Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management, 28(4), pp. 863-885. ISSN 09699988
Manu, P; Asiedu, R O; Mahamadu, A M; Olomolaiye, P O; Booth, C; Manu, E; Ajayi, S and Agyekum, K (2021) Contribution of procurement capacity of public agencies to attainment of procurement objectives in infrastructure procurement. Engineering, Construction and Architectural Management, 28(10), pp. 3322-3345. ISSN 09699988
Kern, A P; Postay, R; Schneck, E R; Mancio, M; González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(4), pp. 1176-1195. ISSN 09699988
Ekanayake, E M A C; Shen, G and Kumaraswamy, M M (2021) Critical capabilities of improving supply chain resilience in industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 28(10), pp. 3236-3260. ISSN 09699988
Ekanayake, E M A C; Shen, G Q; Kumaraswamy, M and Owusu, E K (2021) Critical supply chain vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 28(10), pp. 3041-3059. ISSN 09699988
Jiang, W; Ding, L and Zhou, C (2021) Cyber physical system for safety management in smart construction site. Engineering, Construction and Architectural Management, 28(3), pp. 788-808. ISSN 09699988
Kalach, M; Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(4), pp. 969-993. ISSN 09699988
Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(1), pp. 397-423. ISSN 09699988
Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2021) Developing a construction business model transformation canvas. Engineering, Construction and Architectural Management, 28(5), pp. 1423-1439. ISSN 09699988
Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(5), pp. 1377-1396. ISSN 09699988
Okudan, O; Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 09699988
Ma, Z; Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(1), pp. 291-307. ISSN 09699988
Abas, N H; Blismas, N and Lingard, H (2021) Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. Engineering, Construction and Architectural Management, 28(10), pp. 2967-2993. ISSN 09699988
Suresh, S; Renukappa, S; Abdul-Aziz, A R; Paloo, Y and Jallow, H (2021) Developments in the UK road transport from a smart cities perspective. Engineering, Construction and Architectural Management, 28(4), pp. 845-862. ISSN 09699988
Sharma, K K; Israel, D and Bhalla, B (2021) Does previous work experience matter in students' learning in higher project management education? Engineering, Construction and Architectural Management, 28(1), pp. 424-450. ISSN 09699988
Nwadigo, O; Naismith, N N; Ghaffarianhoseini, A; Ghaffarian Hoseini, A and Tookey, J (2021) Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise. Engineering, Construction and Architectural Management, 28(10), pp. 2994-3013. ISSN 09699988
Wu, G; Hu, Z; Zheng, J; Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(1), pp. 101-124. ISSN 09699988
Imani, E and Asefi, M (2021) Empirical investigation of factors that enhance development of technology in design process improvement in architecture education: Analyses of students' views. Engineering, Construction and Architectural Management, 28(10), pp. 3164-3189. ISSN 09699988
Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2021) Environmental impacts cost assessment model of residential building using an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 3190-3215. ISSN 09699988
Cong, X; Wang, L; Ma, L and Skibnewski, M (2021) Exploring critical influencing factors for the site selection failure of waste-to-energy projects in China caused by the "not in my back yard" effect. Engineering, Construction and Architectural Management, 28(6), pp. 1561-1592. ISSN 09699988
Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 09699988
Owusu-Manu, D G; Debrah, C; Amissah, L; Edwards, D J and Chileshe, N (2021) Exploring the linkages between project managers' mindset behaviour and project leadership style in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 28(9), pp. 2690-2711. ISSN 09699988
Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 09699988
Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 09699988
Gebremeskel, M N; Kim, S Y; Thuc, L D and Nguyen, M V (2021) Forming a driving index for implementing public-private partnership projects in emerging economy: Ethiopian perception. Engineering, Construction and Architectural Management, 28(10), pp. 2925-2947. ISSN 09699988
Udawatta, N; Zuo, J; Chiveralls, K and Zillante, G (2021) From green buildings to living buildings? Rating schemes and waste management practices in Australian educational buildings. Engineering, Construction and Architectural Management, 28(4), pp. 1278-1294. ISSN 09699988
Low, S P; Gao, S and Ng, E W L (2021) Future-ready project and facility management graduates in Singapore for industry 4.0: Transforming mindsets and competencies. Engineering, Construction and Architectural Management, 28(1), pp. 270-290. ISSN 09699988
Abrishami, S; Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: Prototype development. Engineering, Construction and Architectural Management, 28(2), pp. 482-509. ISSN 09699988
Hu, Z; Li, Q; Liu, T; Wang, L and Cheng, Z (2021) Government equity investment, effective communication and public private partnership (PPP) performance: Evidence from China. Engineering, Construction and Architectural Management, 28(9), pp. 2811-2827. ISSN 09699988
Shukra, Z A and Zhou, Y (2021) Holistic green BIM: A scientometrics and mixed review. Engineering, Construction and Architectural Management, 28(9), pp. 2273-2299. ISSN 09699988
Zhang, S; Sunindijo, R Y; Loosemore, M; Wang, S; Gu, Y and Li, H (2021) Identifying critical factors influencing the safety of Chinese subway construction projects. Engineering, Construction and Architectural Management, 28(7), pp. 1863-1886. ISSN 09699988
Chen, Q; Hall, D M; Adey, B T and Haas, C T (2021) Identifying enablers for coordination across construction supply chain processes: A systematic literature review. Engineering, Construction and Architectural Management, 28(4), pp. 1083-1113. ISSN 09699988
Jang, Y; Jeong, I and Cho, Y K (2021) Identifying impact of variables in deep learning models on bankruptcy prediction of construction contractors. Engineering, Construction and Architectural Management, 28(10), pp. 3282-3298. ISSN 09699988
Heesom, D; Boden, P; Hatfield, A; De Los Santos Melo, A and Czarska-Chukwurah, F (2021) Implementing a HBIM approach to manage the translocation of heritage buildings. Engineering, Construction and Architectural Management, 28(10), pp. 2948-2966. ISSN 09699988
Alvanchi, A; Baniassadi, F; Shahsavari, M and Kashani, H (2021) Improving materials logistics plan in road construction projects using discrete event simulation. Engineering, Construction and Architectural Management, 28(10), pp. 3144-3163. ISSN 09699988
Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 09699988
Liu, F; Wang, Y; Li, H and Zhou, X (2021) Influence of cooperative period of municipal PPPs on transaction cost: a case study. Engineering, Construction and Architectural Management, 28(4), pp. 1261-1277. ISSN 09699988
Jia, J; Ma, G; Jiang, S; Wu, M and Wu, Z (2021) Influence of social media use at work on construction managers' work performance: The knowledge seeker's perspective. Engineering, Construction and Architectural Management, 28(10), pp. 3216-3235. ISSN 09699988
Li, Y; He, N; Li, H; Liu, Z and Qi, J (2021) Influencing factors on inter-organizational trust asymmetry behavior in construction projects: Evidence from China. Engineering, Construction and Architectural Management, 28(1), pp. 308-331. ISSN 09699988
Zeng, R; Chini, A and Ries, R (2021) Innovative design for sustainability: Integrating embodied impacts and costs during the early design phase. Engineering, Construction and Architectural Management, 28(3), pp. 747-764. ISSN 09699988
Seki, Y; Sutrisna, M and Olanipekun, A O (2021) Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Engineering, Construction and Architectural Management, 28(7), pp. 1929-1951. ISSN 09699988
Gorod, A; Hallo, L; Statsenko, L; Nguyen, T and Chileshe, N (2021) Integrating hierarchical and network centric management approaches in construction megaprojects using a holonic methodology. Engineering, Construction and Architectural Management, 28(3), pp. 627-661. ISSN 09699988
Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 09699988
Zhang, J; Li, H; Li, V; Xia, B and Skitmore, M (2021) Internal relationships of market-oriented efqm enablers in the Chinese construction industry. Engineering, Construction and Architectural Management, 28(3), pp. 765-787. ISSN 09699988
Fernando, S; Panuwatwanich, K and Thorpe, D (2021) Introducing an innovation promotion model for construction projects. Engineering, Construction and Architectural Management, 28(3), pp. 728-746. ISSN 09699988
Ma, T; Wang, Z; Skibniewski, M J; Ding, J; Wang, G and He, Q (2021) Investigating stewardship behavior in megaprojects: An exploratory analysis. Engineering, Construction and Architectural Management, 28(9), pp. 2570-2591. ISSN 09699988
Hasan, A; Ahn, S; Rameezdeen, R and Baroudi, B (2021) Investigation into post-adoption usage of mobile icts in Australian construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 351-371. ISSN 09699988
Kashkool, A M H and Al Ali, S S (2021) Maintenance management of heritage buildings in Iraq. Engineering, Construction and Architectural Management, 28(9), pp. 2448-2465. ISSN 09699988
Newaz, M T; Jefferies, M; Davis, P R and Pillay, M (2021) Managerial implications for construction practices as a consequence of using a psychological contract of safety. Engineering, Construction and Architectural Management, 28(4), pp. 1134-1155. ISSN 09699988
Wang, D; Wang, X; Liu, M; Liu, H and Liu, B (2021) Managing public-private partnerships: A transmission pattern of underlying dynamics determining project performance. Engineering, Construction and Architectural Management, 28(4), pp. 1038-1059. ISSN 09699988
Baldauf, J P; Formoso, C T and Tzortzopoulos, P (2021) Method for managing requirements in healthcare projects using building information modelling. Engineering, Construction and Architectural Management, 28(8), pp. 2090-2118. ISSN 09699988
Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 09699988
Tong, R; Zhao, H; Zhang, N; Li, H; Wang, X and Yang, H (2021) Modified accident causation model for highway construction accidents (acm-hc). Engineering, Construction and Architectural Management, 28(9), pp. 2592-2609. ISSN 09699988
Loosemore, M; Denny-Smith, G; Barraket, J; Keast, R; Chamberlain, D; Muir, K; Powell, A; Higgon, D and Osborne, J (2021) Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Engineering, Construction and Architectural Management, 28(7), pp. 1908-1928. ISSN 09699988
Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 09699988
Elshaboury, N and Marzouk, M (2021) Optimizing construction and demolition waste transportation for sustainable construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2411-2425. ISSN 09699988
Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 09699988
Getuli, V; Capone, P and Bruttini, A (2021) Planning, management and administration of hs contents with BIM and VR in construction: An implementation protocol. Engineering, Construction and Architectural Management, 28(2), pp. 603-623. ISSN 09699988
Jiang, W; Martek, I; Hosseini, M R and Chen, C (2021) Political risk management of foreign direct investment in infrastructure projects: Bibliometric-qualitative analyses of research in developing countries. Engineering, Construction and Architectural Management, 28(1), pp. 125-153. ISSN 09699988
Pan, W; Chen, L and Zhan, W (2021) Positioning construction workers' vocational training of guangdong in the global political-economic spectrum of skill formation. Engineering, Construction and Architectural Management, 28(9), pp. 2489-2515. ISSN 09699988
Bai, L; Wang, Z; Wang, H; Huang, N and Shi, H (2021) Prediction of multiproject resource conflict risk via an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 2857-2883. ISSN 09699988
Wang, R; Lee, C J; Hsu, S C and Chen, J H (2021) Preventing or encouraging illegal activities by construction firms: Effects of top management team compensation and aspiration-performance discrepancies. Engineering, Construction and Architectural Management, 28(6), pp. 1739-1760. ISSN 09699988
Kim, S Y; Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: Case study of international development projects. Engineering, Construction and Architectural Management, 28(4), pp. 1114-1133. ISSN 09699988
Azman, M A; Hon, C K H; Xia, B; Lee, B L and Skitmore, M (2021) Product diversification and large construction firm productivity: The effect of institutional environments in Malaysia. Engineering, Construction and Architectural Management, 28(4), pp. 994-1013. ISSN 09699988
Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 09699988
Guo, S; Wang, J and Wu, H (2021) Profit distribution of IPD projects using fuzzy alliance. Engineering, Construction and Architectural Management, 28(8), pp. 2069-2089. ISSN 09699988
Maraqa, M J; Sacks, R and Spatari, S (2021) Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects. Engineering, Construction and Architectural Management, 28(8), pp. 2176-2198. ISSN 09699988
Li, H; Zhong, Y and Fan, C (2021) Reducing the social risks of transnational railway construction: A discussion on the formation mechanism of host country people's coping behaviors. Engineering, Construction and Architectural Management, 28(6), pp. 1657-1682. ISSN 09699988
Zarghami, S A and Dumrak, J (2021) Reimaging stakeholder analysis in project management: Network theory and fuzzy logic applications. Engineering, Construction and Architectural Management, 28(9), pp. 2426-2447. ISSN 09699988
Sadrinooshabadi, S; Taheri, A; Yitmen, I and Jongeling, R (2021) Requirement management in a life cycle perspective based on ISO 19650-1 and coclass as the new classification system in Sweden. Engineering, Construction and Architectural Management, 28(9), pp. 2736-2753. ISSN 09699988
Shen, K; Li, X; Cao, X and Zhihui, Z (2021) Research on the rework risk core tasks in prefabricated construction in China. Engineering, Construction and Architectural Management, 28(10), pp. 3299-3321. ISSN 09699988
Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 09699988
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2021) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 09699988
Qian, X and Papadonikolaki, E (2021) Shifting trust in construction supply chains through blockchain technology. Engineering, Construction and Architectural Management, 28(2), pp. 584-602. ISSN 09699988
Wang, Y and Jin, X (2021) Structural risk of diversified project financing of city investment company in China based on the best worst method. Engineering, Construction and Architectural Management, 28(1), pp. 196-215. ISSN 09699988
Laryea, S and Watermeyer, R (2021) Structuring architectural competitions as a competitive procurement process. Engineering, Construction and Architectural Management, 28(4), pp. 886-907. ISSN 09699988
Liu, J and Ma, G (2021) Study on incentive and supervision mechanisms of technological innovation in megaprojects based on the principal-agent theory. Engineering, Construction and Architectural Management, 28(6), pp. 1593-1614. ISSN 09699988
Hu, X (2021) Sustainability perceptions of home modification service providers for older australians. Engineering, Construction and Architectural Management, 28(9), pp. 2754-2771. ISSN 09699988
Nikolic, D; Castronovo, F and Leicht, R (2021) Teaching BIM as a collaborative information management process through a continuous improvement assessment lens: A case study. Engineering, Construction and Architectural Management, 28(8), pp. 2248-2269. ISSN 09699988
Ge, Y; Cui, C; Zhang, C; Ke, Y and Liu, Y (2021) Testing a social-psychological model of public acceptance towards highway infrastructure projects: A case study from China. Engineering, Construction and Architectural Management, 28(9), pp. 2772-2787. ISSN 09699988
Banihashemi, S A and Khalilzadeh, M (2021) Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Engineering, Construction and Architectural Management, 28(7), pp. 1979-2004. ISSN 09699988
Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 09699988
Ismail, Z A B (2021) Towards a BIM-based approach for improving maintenance performance in IBS building projects. Engineering, Construction and Architectural Management, 28(5), pp. 1468-1490. ISSN 09699988
Lappalainen, E M; Seppänen, O; Peltokorpi, A and Singh, V (2021) Transformation of construction project management toward situational awareness. Engineering, Construction and Architectural Management, 28(8), pp. 2199-2221. ISSN 09699988
Jiang, W and Zhao, X (2021) Trust and the intent to cooperate in energy performance contracting for public buildings in China. Engineering, Construction and Architectural Management, 28(1), pp. 372-396. ISSN 09699988
Kumar, R; Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(4), pp. 1014-1037. ISSN 09699988
Xiang, L; Tan, Y; Jin, X and Shen, G (2021) Understanding stakeholders' concerns of age-friendly communities at the briefing stage: A preliminary study in urban China. Engineering, Construction and Architectural Management, 28(1), pp. 31-54. ISSN 09699988
Hammond, S F; Gajendran, T; Savage, D A and Maund, K (2021) Unpacking the problems behind the limited green construction adoption: Towards a theoretical model. Engineering, Construction and Architectural Management, 28(4), pp. 833-844. ISSN 09699988
Antwi-Afari, M F; Li, H; Seo, J; Anwer, S; Yevu, S K and Wu, Z (2021) Validity and reliability of a wearable insole pressure system for measuring gait parameters to identify safety hazards in construction. Engineering, Construction and Architectural Management, 28(6), pp. 1761-1779. ISSN 09699988
Juan, Y K; Chi, H Y and Chen, H H (2021) Virtual reality-based decision support model for interior design and decoration of an office building. Engineering, Construction and Architectural Management, 28(1), pp. 229-245. ISSN 09699988
Fu, M; Liu, R and Hon, C K H (2021) Walkability evaluation of building circulation based on user preference. Engineering, Construction and Architectural Management, 28(10), pp. 2904-2924. ISSN 09699988
Fallahtafti, R and Mahdavinejad, M (2021) Window geometry impact on a room's wind comfort. Engineering, Construction and Architectural Management, 28(9), pp. 2381-2410. ISSN 09699988
Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 09699988
Li, Y; Lin, J; Cui, Z; Wang, C and Li, G (2021) Workforce productivity evaluation of the US construction industry from 2006 to 2016. Engineering, Construction and Architectural Management, 28(1), pp. 55-81. ISSN 09699988
Derakhshanfar, H; Ochoa, J J; Kirytopoulos, K; Mayer, W and Langston, C (2021) A cartography of delay risks in the Australian construction industry: Impact, correlations and timing. Engineering, Construction and Architectural Management, 28(7), pp. 1952-1978. ISSN 09699988
Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 09699988
Charlton, J; Kelly, K; Greenwood, D and Moreton, L (2021) The complexities of managing historic buildings with BIM. Engineering, Construction and Architectural Management, 28(2), pp. 570-583. ISSN 09699988
Ofori-Boadu, A N; Owusu-Manu, D G; Edwards, D J and Asiseh, F (2021) A conceptual model of subcontractor development practices for LEED projects. Engineering, Construction and Architectural Management, 28(4), pp. 1196-1213. ISSN 09699988
Chen, X; Ding, Y; Cory, C A; Hu, Y; Wu, K J and Feng, X (2021) A decision support model for subcontractor selection using a hybrid approach of QFD and AHP-improved grey correlation analysis. Engineering, Construction and Architectural Management, 28(6), pp. 1780-1806. ISSN 09699988
Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Manu, P; Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: An empirical study. Engineering, Construction and Architectural Management, 28(5), pp. 1440-1467. ISSN 09699988
Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 09699988
Song, D; Song, J; Yuan, H and Fan, Y (2021) An evolutionary game analysis of user-pay public-private partnership projects. Engineering, Construction and Architectural Management, 28(7), pp. 2042-2062. ISSN 09699988
Lyu, S; Hon, C K H; Chan, A P C; Javed, A A; Zhang, R P and Wong, F K W (2021) An exploratory study of safety communication networks of ethnic minority crews in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 28(4), pp. 1156-1175. ISSN 09699988
Akin, S; Ergun, O; Surer, E and Gursel Dino, I (2021) An immersive performative architectural design tool with daylighting simulations: A building information modeling-based approach. Engineering, Construction and Architectural Management, 28(4), pp. 1319-1344. ISSN 09699988
Zhang, L and Sun, H (2021) The impacts of ethical climate on knowledge contribution loafing among designers in engineering design firms: Mediated effect of knowledge leadership. Engineering, Construction and Architectural Management, 28(6), pp. 1807-1827. ISSN 09699988
Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 09699988
Luo, J; Zhang, H and Sher, W (2021) A mixed method for measuring incompatibilities between manufacturing approaches and off-site construction. Engineering, Construction and Architectural Management, 28(9), pp. 2516-2548. ISSN 09699988
Al-Tawal, D R; Arafah, M and Sweis, G J (2021) A model utilizing the artificial neural network in cost estimation of construction projects in Jordan. Engineering, Construction and Architectural Management, 28(9), pp. 2466-2488. ISSN 09699988
Hosseinian, S M; Farahpour, E and Carmichael, D G (2021) An optimum multiple outcomes sharing model with multiple risk-averse agents. Engineering, Construction and Architectural Management, 28(9), pp. 2788-2810. ISSN 09699988
Rashid Alteneiji, H; Ahmed, V and Saboor, S (2021) A qualitative approach to investigate emergency preparedness state for the built environment in the UAE. Engineering, Construction and Architectural Management, 28(7), pp. 2005-2022. ISSN 09699988
Ismail, M R; Sun, M and Bowles, G (2021) A risk-oriented tender evaluation system for construction projects in Malaysia. Engineering, Construction and Architectural Management, 28(7), pp. 1887-1907. ISSN 09699988
Chen, H; Jin, Z; Su, Q and Yue, G (2021) The roles of captains in megaproject innovation ecosystems: The case of the Hong Kong‐zhuhai‐macau bridge. Engineering, Construction and Architectural Management, 28(3), pp. 662-680. ISSN 09699988
Liu, H; Yu, Y; Sun, Y and Yan, X (2021) A system dynamic approach for simulation of a knowledge transfer model of heterogeneous senders in mega project innovation. Engineering, Construction and Architectural Management, 28(3), pp. 681-705. ISSN 09699988
Koranteng, C; Simons, B and Manu, F W (2021) A thermal performance study of four communities in Ghana's savannah region. Engineering, Construction and Architectural Management, 28(10), pp. 3261-3281. ISSN 09699988