Browse by Journal

Number of items: 42.

Lu, W; Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(4), pp. 448-463. ISSN 0969-9988

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), pp. 751-764. ISSN 0969-9988

Gambo, N; Said, I and Ismail, R (2016) Comparing the levels of performance of small scale local government contractors in Northern Nigeria with international practice. Engineering, Construction and Architectural Management, 23(5), pp. 588-609. ISSN 0969-9988

Ajayi, S O; Oyedele, L O; Kadiri, K O; Akinade, O O; Bilal, M; Owolabi, H A and Alaka, H A (2016) Competency-based measures for designing out construction waste: Task and contextual attributes. Engineering, Construction and Architectural Management, 23(4), pp. 464-490. ISSN 0969-9988

Sepasgozar, S M E; Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(2), pp. 158-176. ISSN 0969-9988

Ma, L; Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(3), pp. 283-301. ISSN 0969-9988

Forsythe, P J (2016) Construction service quality and satisfaction for a targeted housing customer. Engineering, Construction and Architectural Management, 23(3), pp. 323-348. ISSN 0969-9988

Morrow, S; Hare, B and Cameron, I (2016) Design engineers' perception of health and safety and its impact in the design process. Engineering, Construction and Architectural Management, 23(1), pp. 40-59. ISSN 0969-9988

Zou, Y; Kiviniemi, A and Jones, S W (2016) Developing a tailored rbs linking to BIM for risk management of bridge projects. Engineering, Construction and Architectural Management, 23(6), pp. 727-750. ISSN 0969-9988

Chileshe, N; Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(2), pp. 134-157. ISSN 0969-9988

Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988

Oladinrin, O T and Ho, C M-F (2016) Embeddedness of codes of ethics in construction organizations. Engineering, Construction and Architectural Management, 23(1), pp. 75-91. ISSN 0969-9988

Holt, G D; Goulding, J S and Akintoye, A (2016) Enablers, challenges and relationships between research impact and theory generation. Engineering, Construction and Architectural Management, 23(1), pp. 20-39. ISSN 0969-9988

Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988

Hu, L and Wu, H (2016) Exploratory study on risk management of state-owned construction enterprises in China. Engineering, Construction and Architectural Management, 23(5), pp. 674-691. ISSN 0969-9988

Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(3), pp. 302-322. ISSN 0969-9988

Oo, B L and Lim, B T-H (2016) Game-based learning in construction management courses: A case of bidding game. Engineering, Construction and Architectural Management, 23(1), pp. 4-19. ISSN 0969-9988

Cunha, L R M; Bastos, C D; Meijon, M N H and Araújo, D F (2016) Gamification technique for supporting transparency on construction sites: A case study. Engineering, Construction and Architectural Management, 23(6), pp. 801-822. ISSN 0969-9988

Chand, A M and Loosemore, M (2016) Hospital disaster management's understanding of built environment impacts on healthcare services during extreme weather events. Engineering, Construction and Architectural Management, 23(3), pp. 385-402. ISSN 0969-9988

Lindhard, S and Larsen, J K (2016) Identifying the key process factors affecting project performance. Engineering, Construction and Architectural Management, 23(5), pp. 657-673. ISSN 0969-9988

Shelton, J; Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(2), pp. 177-191. ISSN 0969-9988

Upstill-Goddard, J; Glass, J; Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(4), pp. 407-427. ISSN 0969-9988

Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(3), pp. 349-368. ISSN 0969-9988

Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(4), pp. 428-447. ISSN 0969-9988

Ho, P H K (2016) Labour and skill shortages in Hong Kong's construction industry. Engineering, Construction and Architectural Management, 23(4), pp. 533-550. ISSN 0969-9988

Hoeber, H and Alsem, D (2016) Life-cycle information management using open-standard BIM. Engineering, Construction and Architectural Management, 23(6), pp. 696-708. ISSN 0969-9988

Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988

Willar, D; Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(2), pp. 114-133. ISSN 0969-9988

Sandrk Nukic, I and Huemann, M (2016) Organizational culture of the Croatian construction industry. Engineering, Construction and Architectural Management, 23(2), pp. 237-260. ISSN 0969-9988

Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988

Zuppa, D; Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(2), pp. 211-236. ISSN 0969-9988

Kwofie, T E; Amos-Abanyie, S and Afram, S O (2016) Principal component analysis of professional competencies of architects in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 23(5), pp. 571-587. ISSN 0969-9988

Ding, Z; Zuo, J; Wang, J and Zillante, G (2016) Searching for niche market for engineering consultants: Case of regional supervision systems in China. Engineering, Construction and Architectural Management, 23(5), pp. 622-637. ISSN 0969-9988

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(2), pp. 192-210. ISSN 0969-9988

Shanbari, H; Blinn, N and Issa, R R A (2016) Using augmented reality video in enhancing masonry and roof component comprehension for construction management students. Engineering, Construction and Architectural Management, 23(6), pp. 765-781. ISSN 0969-9988

Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988

Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988

Bowen, P; Govender, R; Edwards, P and Cattell, K (2016) An explanatory model of attitudinal fear of HIV/AIDS testing in the construction industry. Engineering, Construction and Architectural Management, 23(1), pp. 92-112. ISSN 0969-9988

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(4), pp. 511-532. ISSN 0969-9988

Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988

Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988

Carbonara, N; Costantino, N and Pellegrino, R (2016) A transaction costs-based model to choose PPP procurement procedures. Engineering, Construction and Architectural Management, 23(4), pp. 491-510. ISSN 0969-9988

This list was generated on Mon Apr 28 11:24:48 2025 UTC.