Browse by Journal

Number of items: 36.

Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 09699988

Wirahadikusumah, R and Abraham, D M (2003) Application of dynamic programming and simulation for sewer management. Engineering, Construction and Architectural Management, 10(3), pp. 193-208. ISSN 0969-9988

Tran, T X M; Malano, H M and Thompson, R G (2003) Application of the analytic hierarchy process to prioritise irrigation asset renewals: The case of the la khe irrigation scheme, Vietnam. Engineering, Construction and Architectural Management, 10(6), pp. 382-390. ISSN 09699988

Ballal, T M A and Sher, W D (2003) Artificial neural network for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(4), pp. 263-271. ISSN 09699988

Santoso, D S; Ogunlana, S O and Minato, T (2003) Assessment of risks in high rise building construction in Jakarta. Engineering, Construction and Architectural Management, 10(1), pp. 43-55. ISSN 09699988

Tan, W (2003) Building competitive advantage: Construction education in Japan. Engineering, Construction and Architectural Management, 10(2), pp. 78-87. ISSN 09699988

Poon, C S; Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(2), pp. 88-98. ISSN 0969-9988

Nassar, K (2003) Construction contracts in a competitive market: C3M, a simulation game. Engineering, Construction and Architectural Management, 10(3), pp. 172-178. ISSN 0969-9988

Fernie, S; Green, S D and Weller, S J (2003) Dilettantes, discipline and discourse: Requirements management for construction. Engineering, Construction and Architectural Management, 10(5), pp. 354-367. ISSN 09699988

Carley, L A; Haas, C T; Borcherding, J D and Goodrum, P M (2003) Experiences with multiskilling among non-union craft workers in us industrial construction projects. Engineering, Construction and Architectural Management, 10(6), pp. 374-381. ISSN 09699988

Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 09699988

Tong, T K L and Tam, C M (2003) Fuzzy optimisation of labour allocation by genetic algorithms. Engineering, Construction and Architectural Management, 10(2), pp. 146-155. ISSN 09699988

Faraj, I (2003) Geometric verification of design. Engineering, Construction and Architectural Management, 10(1), pp. 56-70. ISSN 09699988

Rowlinson, S; Mohamed, S and Lam, S W (2003) Hong Kong construction foremen's safety responsibilities: A case study of management oversight. Engineering, Construction and Architectural Management, 10(1), pp. 27-35. ISSN 09699988

Gorse, C A and Emmitt, S (2003) Investigating interpersonal communication during construction progress meetings: Challenges and opportunities. Engineering, Construction and Architectural Management, 10(4), pp. 234-244. ISSN 09699988

Koch, C (2003) Knowledge management in consulting engineering joining IT and human resources to support the production of knowledge. Engineering, Construction and Architectural Management, 10(6), pp. 391-401. ISSN 09699988

Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 09699988

Karam, A H (2003) Marketing and architects in South Africa. Engineering, Construction and Architectural Management, 10(6), pp. 402-412. ISSN 0969-9988

Luu, D T; Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), pp. 209-218. ISSN 0969-9988

Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 09699988

Vee, C and Skitmore, M (2003) Professional ethics in the construction industry. Engineering, Construction and Architectural Management, 10(2), pp. 117-127. ISSN 0969-9988

Wood, G D and Ellis, R C T (2003) Risk management practices of leading UK cost consultants. Engineering, Construction and Architectural Management, 10(4), pp. 254-262. ISSN 09699988

Attoh-Okine, N O (2003) Rule induction in productivity analysis: A rough set approach. Engineering, Construction and Architectural Management, 10(6), pp. 413-417. ISSN 09699988

Cuervo, J C and Pheng, L S (2003) Significance of location factors for Singapore transnational construction corporations. Engineering, Construction and Architectural Management, 10(5), pp. 342-353. ISSN 0969-9988

Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988

Ruthankoon, R and Ogunlana, S O (2003) Testing herzberg's two-factor theory in the Thai construction industry. Engineering, Construction and Architectural Management, 10(5), pp. 333-341. ISSN 09699988

Toakley, A R and Marosszeky, M (2003) Towards total project quality - A review of research needs. Engineering, Construction and Architectural Management, 10(3), pp. 219-228. ISSN 0969-9988

Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988

Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms. Engineering, Construction and Architectural Management, 10(2), pp. 128-145. ISSN 0969-9988

Mills, A; Harris, D and Skitmore, M (2003) The accuracy of housing forecasting in Australia. Engineering, Construction and Architectural Management, 10(4), pp. 245-253. ISSN 09699988

Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 09699988

Hughes, W P (2003) A comparison of two editions of the riba plan of work. Engineering, Construction and Architectural Management, 10(5), pp. 302-311. ISSN 09699988

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 09699988

Duyshart, B; Walker, D; Mohamed, S and Hampson, K (2003) An example of developing a business model for information and communication technologies (ICT) adoption on construction projects: the national museum of Australia project. Engineering, Construction and Architectural Management, 10(3), pp. 179-192. ISSN 09699988

Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 09699988

Price, A D F (2003) The strategy process within large construction orgnisations. Engineering, Construction and Architectural Management, 10(4), pp. 283-296. ISSN 09699988

This list was generated on Mon Apr 28 11:24:43 2025 UTC.