Browse by Journal
Trinh, T T P and Sharif, N (1996) Assessing construction technology by integrating constructed product and construction process complexities: A case study of embankment dams in Thailand. Construction Management and Economics, 14(6), pp. 467-484. ISSN 01446193
Finch, E; Flanagan, R and Marsh, L (1996) Auto-ID application in construction. Construction Management and Economics, 14(2), pp. 121-129. ISSN 01446193
Druker, J; White, G; Hegewisch, A and Mayne, L (1996) Between hard and soft HRM: Human resource management in the construction industry. Construction Management and Economics, 14(5), pp. 405-416. ISSN 01446193
Ming, C S; Runeson, G and Skitmore, M (1996) Changes in profit as market conditions change: An historical study of a building firm. Construction Management and Economics, 14(3), pp. 253-264. ISSN 01446193
Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193
Gann, D M (1996) Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management and Economics, 14(5), pp. 437-450. ISSN 01446193
Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(4), pp. 311-317. ISSN 01446193
Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193
Gann, D M and Barlow, J (1996) Flexibility in building use: The technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(1), pp. 55-66. ISSN 01446193
Allen, S and Hinks, J (1996) How long should housing last? Some implications of the age and probable life of housing in England. Construction Management and Economics, 14(6), pp. 531-535. ISSN 01446193
Tan, R R (1996) Information technology and perceived competitive advantage: An empirical study of engineering consulting firms in Taiwan. Construction Management and Economics, 14(3), pp. 227-240. ISSN 01446193
Bowen, P A and Edwards, P J (1996) Interpersonal communication in cost planning during the building design phase. Construction Management and Economics, 14(5), pp. 395-404. ISSN 01446193
Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193
Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(2), pp. 165-174. ISSN 01446193
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Shirazi, B; Langford, D A and Rowlinson, S M (1996) Organizational structures in the construction industry. Construction Management and Economics, 14(3), pp. 199-212. ISSN 01446193
Aikivuori, A (1996) Periods and demand for private sector housing refurbishment. Construction Management and Economics, 14(1), pp. 3-12. ISSN 01446193
Gori, E (1996) Portfolio selection of capital investment projects in the Durban Metropolitan Region. Construction Management and Economics, 14(5), pp. 451-456. ISSN 01446193
Handa, V and Adas, A (1996) Predicting the level of organizational effectiveness: A methodology for the construction firm. Construction Management and Economics, 14(4), pp. 341-352. ISSN 01446193
Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193
Gidado, K I (1996) Project complexity: The focal point of construction production planning. Construction Management and Economics, 14(3), pp. 213-225. ISSN 01446193
Low, S P and Tan, W (1996) Public policies for managing construction quality: The grand strategy of Singapore. Construction Management and Economics, 14(4), pp. 295-309. ISSN 01446193
Hua, G B (1996) Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression. Construction Management and Economics, 14(1), pp. 25-34. ISSN 01446193
Li, H (1996) Selecting KBES development techniques for applications in the construction industry. Construction Management and Economics, 14(1), pp. 67-74. ISSN 01446193
Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193
Bon, R and Yashiro, T (1996) Some new evidence of old trends: Japanese construction, 1960-1990. Construction Management and Economics, 14(4), pp. 319-323. ISSN 01446193
Abdul-Rahman, H (1996) Some observations on the management of quality among construction professionals in the UK. Construction Management and Economics, 14(6), pp. 485-495. ISSN 01446193
Macsporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(2), pp. 103-119. ISSN 01446193
Carrillo, P (1996) Technology transfer on joint venture projects in developing countries. Construction Management and Economics, 14(1), pp. 45-54. ISSN 01446193
Ranasinghe, M (1996) Total project cost: A simplified model for decision makers. Construction Management and Economics, 14(6), pp. 497-505. ISSN 01446193
Kaka, A P (1996) Towards more flexible and accurate cash flow forecasting. Construction Management and Economics, 14(1), pp. 35-44. ISSN 01446193
Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193
Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(2), pp. 147-154. ISSN 01446193
Shammas-Toma, M; Seymour, D E and Clark, L (1996) The effectiveness of formal quality management systems in achieving the required cover in reinforced concrete. Construction Management and Economics, 14(4), pp. 353-364. ISSN 01446193
Tan, W (1996) The elasticity of capital-labour substitution in Singapore construction. Construction Management and Economics, 14(6), pp. 537-542. ISSN 01446193
Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(2), pp. 175-182. ISSN 01446193
Djebarni, R (1996) The impact of stress in site management effectiveness. Construction Management and Economics, 14(4), pp. 281-293. ISSN 01446193
Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(2), pp. 155-164. ISSN 01446193
Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(2), pp. 93-101. ISSN 01446193