Browse by Journal
Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175
Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175
Stewart, R A and Waroonkun, T (2007) Benchmarking construction technology transfer in Thailand. Construction Innovation, 7(3), pp. 218-239. ISSN 1471-4175
al Nageim, H; Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(3), pp. 240-253. ISSN 1471-4175
Tam, V W Y; Shen, L Y; Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(2), pp. 149-166. ISSN 1471-4175
Tatari, O; Castro-Lacouture, D and Skibniewski, M J (2007) Current state of construction enterprise information systems: Survey research. Construction Innovation, 7(4), pp. 310-319. ISSN 1471-4175
Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175
Al-Sudairi, A A (2007) Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation, 7(1), pp. 99-121. ISSN 1471-4175
Wong, C H (2007) ICT implementation and evolution: Case studies of intranets and extranets in UK construction enterprises. Construction Innovation, 7(3), pp. 254-273. ISSN 1471-4175
van der Linden, K A C; Kurvers, S S R; Raue, A A K and Boerstra, A A C (2007) Indoor climate guidelines in the Netherlands: Developments towards adaptive thermal comfort. Construction Innovation, 7(1), pp. 72-84. ISSN 1471-4175
Tenpierik, M J; Cauberg, J J M and Thorsell, T I (2007) Integrating vacuum insulation panels in building constructions: An integral perspective. Construction Innovation, 7(1), pp. 38-53. ISSN 1471-4175
Lee, A and Sexton, M G (2007) ND modelling: Industry uptake considerations. Construction Innovation, 7(3), pp. 288-302. ISSN 1471-4175
Shelbourn, M; Bouchlaghem, N M; Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4), pp. 357-377. ISSN 1471-4175
Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(3), pp. 274-287. ISSN 1471-4175
Van Den Dobbelsteen, A; Arets, M and Nunes, R (2007) Sustainable design of supporting structures: Optimal structural spans and component combinations for effective improvement of environmental performance. Construction Innovation, 7(1), pp. 54-71. ISSN 1471-4175
fu, C; Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(1), pp. 85-98. ISSN 1471-4175
Eaton, D; Akbiyikli, R; de Lemos, T; Gunnigan, L; Ozen Kutanis, R; Casensky, M; Ladra, J and el Sawalhi, N (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West bank), Portugal and Turkey. Construction Innovation, 7(1), pp. 122-142. ISSN 1471-4175
Al Nageim, H and Pountney, D (2007) A non-linear optimisation technique based on the complex method: The optimal design of a concrete trough supporting a new lightweight rail track system, lr55. Construction Innovation, 7(4), pp. 320-339. ISSN 1471-4175
Hao, J L; Hills, M J and Huang, T (2007) A simulation model using system dynamic method for construction and demolition waste management in Hong Kong. Construction Innovation, 7(1), pp. 7-21. ISSN 1471-4175
Van Timmeren, A and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(1), pp. 22-37. ISSN 1471-4175
Ahmed Memon, Z; Zaimi, M A M and Mustaffar, M (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation, 7(2), pp. 187-199. ISSN 1471-4175