Browse by Journal

Number of items: 14.

Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X

Singh, A (2011) Bayesian analysis for causes of failure at a water utility. Built Environment Project and Asset Management, 1(2), pp. 195-210. ISSN 2044-124X

Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(2), pp. 211-225. ISSN 2044-124X

Tam, C M and Tong, T K L (2011) Conflict analysis study for public engagement programme in infrastructure planning. Built Environment Project and Asset Management, 1(1), pp. 45-60. ISSN 2044-124X

Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: A case study. Built Environment Project and Asset Management, 1(2), pp. 176-194. ISSN 2044-124X

Schraven, D; Hartmann, A and Dewulf, G (2011) Effectiveness of infrastructure asset management: Challenges for public agencies. Built Environment Project and Asset Management, 1(1), pp. 61-74. ISSN 2044-124X

Sommerville, J (2011) Ethical views of micro-enterprises delivering project and asset management services in West-Central Scotland. Built Environment Project and Asset Management, 1(1), pp. 91-103. ISSN 2044-124X

Deshmukh, A; Oh, E H and Hastak, M (2011) Impact of flood damaged critical infrastructure on communities and industries. Built Environment Project and Asset Management, 1(2), pp. 156-175. ISSN 2044-124X

Raphael, B (2011) Multi-criteria decision making for collaborative design optimization of buildings. Built Environment Project and Asset Management, 1(2), pp. 122-136. ISSN 2044-124X

Xu, M; Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): Quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(2), pp. 137-155. ISSN 2044-124X

Singh, A; Adachi, S and Inouye, M (2011) Quality control analysis of downtime and time to repair for water supply pipes. Built Environment Project and Asset Management, 1(1), pp. 75-90. ISSN 2044-124X

Madritsch, T and Ebinger, M (2011) A management framework for the built environment: BEM2/BEM3. Built Environment Project and Asset Management, 1(2), pp. 111-121. ISSN 2044-124X

Bullen, P and Love, P (2011) A new future for the past: A model for adaptive reuse decision-making. Built Environment Project and Asset Management, 1(1), pp. 32-44. ISSN 2044-124X

Ashuri, B; Lu, J and Kashani, H (2011) A real options framework to evaluate investments in toll road projects delivered under the two-phase development strategy. Built Environment Project and Asset Management, 1(1), pp. 14-31. ISSN 2044-124X

This list was generated on Mon Apr 28 08:23:14 2025 UTC.