Sinesilassie, E G; Tabish, S Z S and Jha, K N (2017) Critical factors affecting schedule performance: A case of Ethiopian public construction projects: Engineers' perspective. Engineering, Construction and Architectural Management, 24(5), pp. 757-773. ISSN 0969-9988
Official URL: http://dx.doi.org/10.1108/ECAM-03-2016-0062
Abstract
The paper determines the factors for performance of Ethiopian public construction projects revealing that conflict among project participants, poor human resource management and project manager's ignorance and lack of knowledge are detrimental for the projects' performance.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | factor analysis; ethiopia; critical factors; project success; public projects; schedule performance |