Sambasivan, M; Deepak, T J; Salim, A N and Ponniah, V (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics and structural equation modeling approach. Engineering, Construction and Architectural Management, 24(2), pp. 308-325. ISSN 0969-9988
Official URL: http://dx.doi.org/10.1108/ECAM-09-2015-0145
Abstract
This paper explains the relationships between the causes and effects of delays in Tanzanian construction industry based on transaction cost economics revealing that analyzing and understanding the relationships can help stakeholders to reduce the incidences of delays.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | project management; construction management; modelling; surveys; sub-saharan africa; multivariate analysis |
Date Deposited: | 11 Apr 2025 15:10 |
Last Modified: | 11 Apr 2025 15:10 |