Parchami, J M and Shoar, S (2017) A hybrid SD-DEMATEL approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(4), pp. 629-651. ISSN 0969-9988
Official URL: http://dx.doi.org/10.1108/ECAM-02-2016-0056
Abstract
This paper identifies the important factors influencing on delay in construction projects revealing that factors related to labors and client are the most important and influential factors; and external-related factors are the least important ones.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | construction management; system dynamics; causes of delay; construction delay; dematel method; iranian construction industry |
Date Deposited: | 11 Apr 2025 15:10 |
Last Modified: | 11 Apr 2025 15:10 |