A hybrid SD-DEMATEL approach to develop a delay model for construction projects

Parchami, J M and Shoar, S (2017) A hybrid SD-DEMATEL approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(4), pp. 629-651. ISSN 0969-9988

Abstract

This paper identifies the important factors influencing on delay in construction projects revealing that factors related to labors and client are the most important and influential factors; and external-related factors are the least important ones.

Item Type: Article
Uncontrolled Keywords: construction management; system dynamics; causes of delay; construction delay; dematel method; iranian construction industry
Date Deposited: 11 Apr 2025 15:10
Last Modified: 11 Apr 2025 15:10