Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988
Official URL: http://dx.doi.org/10.1108/ECAM-03-2016-0084
Abstract
This paper determines the causes of schedule overrun and cost escalation of highway projects showing that insufficient and ineligible technical staff is cause of schedule overrun; and inadequate project planning and execution is cause of cost escalation.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | regression analysis; mathematical modeling; schedule overrun; cost escalation and highway projects; statistical fuzzy model |