Managing construction waste on-site through system dynamics modelling: The case of Hong Kong

Li Hao, J; Hill, M J and Yin Shen, L (2008) Managing construction waste on-site through system dynamics modelling: The case of Hong Kong. Engineering, Construction and Architectural Management, 15(2), pp. 103-113. ISSN 09699988

Abstract

Purpose – The purpose of this paper is to provide a decision support tool for construction waste on-site to achieve better construction and demolition waste management. Design/methodology/approach – System dynamics methodology is adopted for developing the model. Findings – The model of managing construction waste on-site is established. The interconnections of the main activities are included into the model with focus on planning and management where information about the future trend is for better decision making. Practical implications – Construction waste generation is dynamic and interactive. Therefore, the model developed can be used as a flexible tool to help practitioners to understand the causes and effects. Originality/value – Since the model allows the users to fine-tune the input parameters, it is flexible to adjust the model to better reflect the reality according to different conditions. This is an advantage over other static models.

Item Type: Article
Uncontrolled Keywords: construction industry; Hong Kong; waste management
Date Deposited: 11 Apr 2025 15:08
Last Modified: 11 Apr 2025 15:08