A meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: Evidence from Malaysia

Azman, M A; Hon, C K H; Skitmore, M; Lee, B L and Xia, B (2019) A meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: Evidence from Malaysia. Construction Management and Economics, 37(2), pp. 72-88. ISSN 01446193

Abstract

There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to date, by measuring the Total Factor Productivity (TFP) of 37 public-listed Malaysian construction firms over 14 years (2003–2016), based on the Färe-Primont index. In comparing different groups of building, civil and specialist construction firms, this is the first application of a meta-frontier framework to capture the technological gaps involved. Based on the construction firms' financial data, it is found that TFP improvement generally occurs due to Technical Efficiency (TE) and Scale-Mix Efficiency (SME) (largely scope economies), and significant technological gaps exist among different groups. Moreover, the industry suffered a decline in technologically related production environment over the period–prompting the conclusion that long-term policy engagement should focus on technological improvements. The paper provides a robust approach to analysing construction productivity at the firm level that also can be used for accessing productivity components and technological gaps in construction and other industries.

Item Type: Article
Uncontrolled Keywords: construction; firm; färe-primont; Malaysia; meta-frontier; total factor productivity
Date Deposited: 11 Apr 2025 14:49
Last Modified: 11 Apr 2025 14:49