Lehtonen, J L and Kiiras, J M (2010) Cost modelling in underpinning projects. Construction Management and Economics, 28(9), pp. 985-995. ISSN 1466433X
Abstract
Large refurbishment projects are characterized by highly varied costs from one project to another. In Finnish underpinning, only retrospective analysis of costs has been available for the owner's decision process. In order to develop tools for pre-tender cost estimating and for comparison of different design solutions and evaluation of tenders of the underpinning project, two different cost models have been developed for research. In both models developed, the minimum data required is the pile length. In the more detailed model, the assessment is based on the design solution, including known pile types and the load transfer classification. Both models are easy to use, and the percentage of explained variance is fairly good in the more detailed model.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | cost modelling; refurbishment; underpinning |
Date Deposited: | 11 Apr 2025 14:48 |
Last Modified: | 11 Apr 2025 14:48 |