Hong, Z; Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(6), pp. 643-651. ISSN 01446193
Abstract
The quantity of some resources is limited because of project cost constrains. These resources may be required by multiple activities simultaneously during a construction process. In a discrete simulation that models the construction process, tracing and controlling such entities, e.g. resources, is crucial to simulation. This paper presents a resource allocation point (RAP) heuristic that takes into account the dynamic and stochastic characteristics of simulation to enable the activity-based construction simulation system to process a decision-making ability, i.e. allocating the limited resources to the multiple computing activities during simulation. In addition, this paper introduces an activity object-orientated approach that implements the RAP heuristic and speeds up the simulation experimentation through initiating and checking only related activity objects instead of scanning all activities as in a pure activity scanning (AS) simulation strategy.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | construction simulation; decision-making; object-oriented approach; resource allocation heuristic; simulation strategy |
Date Deposited: | 11 Apr 2025 14:45 |
Last Modified: | 11 Apr 2025 14:45 |