Factors affecting a contractor's mark-up size decision in Saudi Arabia

Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5), pp. 415-429. ISSN 01446193

Abstract

Deciding upon the right mark-up to add to an estimate is not an easy task for a contractor. The mark-up must be small enough to ensure a good chance of winning the contract, yet big enough to realize a reasonable profit. The determination of the proper mark-up size entails the evaluation of numerous factors. This study presents 37 factors, with their relative importance to contractors operating in Saudi Arabia, underlying the mark-up size decision. The size of contract and availability of required cash, not competition, labour availability and profitability, are the most important factors that affect mark-up size decision.

Item Type: Article
Uncontrolled Keywords: bidding; construction; mark-up; Saudi Arabia
Date Deposited: 11 Apr 2025 14:44
Last Modified: 11 Apr 2025 14:44