Zhang, P; Harris, F C and Olomolaiye, P O (1996) A computer-based model for optimizing the location of a single tower crane. Building Research & Information, 24(2), pp. 113-123. ISSN 0961-3218
Abstract
Authors claim 20-40% of hook horizontal travelling time can be saved if located at the position recommended by the model. The application of a quantitative approach to determine optimum crane position is highly desirable for construction site planning. This paper describes a stochastic (random, number generation to simulate real-world event sequences) simulation model to optimize the location of a single tower crane. Readers will wish to know that this model has been expanded to deal with the location of multiple cranes.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | computer model; material flow; rates of production; tower crane location; UK |
Date Deposited: | 11 Apr 2025 14:06 |
Last Modified: | 11 Apr 2025 14:06 |