Measuring community disaster resilience using q-methods: A physical resilience perspective

Tariq, H; Pathirage, C and Fernando, T (2021) Measuring community disaster resilience using q-methods: A physical resilience perspective. Built Environment Project and Asset Management, 11(4), pp. 722-737. ISSN 2044-124X

Abstract

Decision-makers, practitioners and community members have a need to assess the disaster resilience of their communities and to understand their own capacities in disaster situations. There is a lack of consensus among researchers as to what resilience means and how it can be measured. This paper proposes a novel technique to achieve consensus among stakeholders on definitions, objectives and indicators for measuring a key dimension of community disaster resilience (CDR), physical infrastructure (PI). This study uses a five-step approach utilizing Q-methods to contextualize a resilience index for PI. Interviews, focus groups and Q-sorting workshops were conducted to develop a tool that ranked measures according to stakeholder preference. A total of 84 participants took part in the workshops across four countries (United Kingdom, Malaysia, Pakistan and Sri Lanka). The initial set of 317 measures was reduced to 128 and divided into the three community capacities of anticipatory, absorptive and restorative. The physical infrastructure capacity assessment tool (PI-CAT) was then finalized to have 38 indicators that were also ranked in order of importance by the participants. The PI-CAT can be useful for local governments and communities to measure their own resilience. The tool allows stakeholders to be confident that the metrics being used are ones that are relevant, important and meet their requirements. The Q-method approach helps stakeholders to develop and use a community capacity assessment tool that is appropriate for their context. The PI-CAT can be used to identify effective investments that will enhance CDR.

Item Type: Article
Uncontrolled Keywords: resilience; Q-methods; disaster management; physical infrastructure; disasters; emergency preparedness; infrastructure; workshops; stakeholders; absorptivity; decision making; local government
Date Deposited: 11 Apr 2025 13:55
Last Modified: 11 Apr 2025 13:55