Impact of project monitoring and evaluation practices on construction project success criteria in Ghana

Kissi, E; Agyekum, K; Baiden, B K; Tannor, R A; Asamoah, G E and Andam, E T (2019) Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9(3), pp. 364-382. ISSN 2044-124X

Abstract

Purpose: Monitoring and evaluation (M&E) of projects is a very important aspect of project execution and management. This is because proper M&E practices have a significant effect on the successful delivery of projects. The purpose of this paper is to examine the impact of project M&E practices on construction project success criteria. Design/methodology/approach: Structured questionnaires were used to solicit the views of project professionals in the Ghanaian construction industry. The questions were developed through critical review of literature and complemented with a pilot interview on the subject. This paper utilized a partial least square–structural equation modeling (PLS–SEM) to establish the impact of project M&E practices (constructs) on project success based on the hypothesis. Findings: Results showed that M&E practices had a positive statistical significant relationship with construction project success criteria. In addition, health and safety performance and project scope showed a strong significant relation with M&E practice, implying that, in developing countries, these two main constructs should be given critical attention in achieving project success. Practical implications: The findings of this study may be useful to organizations in determining M&E techniques that are relevant and contribute highly to project success. This may go a long way to increase productivity and accelerate the rate of successful project delivery. Originality/value: The application of rigorous analysis, PLS–SEM, gives a more reliable information on M&E practices that can ensure successful delivery of construction projects.

Item Type: Article
Uncontrolled Keywords: condition monitoring; construction; criteria; evaluation; Ghana; projects; success
Date Deposited: 11 Apr 2025 13:55
Last Modified: 11 Apr 2025 13:55