Hübner, F; Volk, R; Kühlen, A and Schultmann, F (2017) Review of project planning methods for deconstruction projects of buildings. Built Environment Project and Asset Management, 7(2), pp. 212-226. ISSN 2044-124X
Official URL: http://dx.doi.org/10.1108/BEPAM-11-2016-0075
Abstract
This paper illustrates a comprehensive overview of literature and methods for deconstruction project planning of buildings showing that recent approaches deal with planning methods for deterministic time and resource scheduling.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | planning; deconstruction; building deconstruction planning; deconstruction planning; deconstruction planning methods; deconstruction scheduling; planning methods |
Date Deposited: | 11 Apr 2025 13:54 |
Last Modified: | 11 Apr 2025 13:54 |