Aje, O I; Olatunji, O A and Olalusi, O A (2017) Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), pp. 86-98. ISSN 2044-124X
Official URL: http://dx.doi.org/10.1108/BEPAM-06-2015-0028
Abstract
This paper illustrates the relationships between overrun causations when advance payments are issued to contractors revealing that cost overruns are higher in large projects than in small projects while schedule overruns are more in small projects than in large projects.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | costs; construction; capabilities; business strategy; cash flow; capital projects |