Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029
Abstract
The aim of this study is to explore how offsite fabrication (OSF) can be tightly coupled with production and assembly on-site. Prefabrication is a production method that has potential to yield significant productivity and sustainability improvements in the construction industry. Failure to synchronise production in the factory with on-site production can lead to financial losses for the client/owner, main contractor and subcontractors as well as to delays in the construction schedule. The study draws on two case-studies and the authors' experiences in the context of a critical review of literature on the concepts of flow and Just-in-time (JIT) construction delivery. The findings show the value of a buffer between suppliers, fabricators and the site as a way to help the whole supply team create production flow and more environmentally friendly results. A buffer can help while the team is learning to use collaborative short-term planning to create predictable production. The paper recommends ways to synchronise OSF with on-site production. The paper provides practitioners with ideas to reduce both work waiting for workers (or robots) and workers (or robots) waiting for work – and it contributes to theory by raising more questions for further research.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | just-in-time; lean construction; production; sustainability; pre-fabrication |
Date Deposited: | 11 Apr 2025 12:07 |
Last Modified: | 11 Apr 2025 12:07 |