Mohamed, T (2023) Modelling interaction between schedule performance and schedule determinants of construction projects. Unpublished PhD thesis, Loughborough University, UK.
Official URL: https://doi.org/10.26174/thesis.lboro.23564157.v1
Abstract
Under embargo until 30 March 2026
Item Type: | Thesis (Doctoral) |
---|---|
Date Deposited: | 16 Apr 2025 19:38 |
Last Modified: | 16 Apr 2025 19:38 |