Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. Unpublished PhD thesis, Indian Institute of Technology Delhi, India.
Abstract
Changes are inevitable in a construction project, and they can occur for various reasons. Such changes can cause severe disruptions, however, and in particular they can impact a construction project’s time, costs, and other aspects such as labour productivity, safety, and working relationships. Change management in construction is an essential aspect of project management. A key challenge in change management is to identify changes and predict their impacts before their implementation so that the negative impacts of changes can be minimized. However, the large variety of entity types such as teams, components, deliverables, activities and parameters, as well as the complex interdependencies that exist among these entity types, makes it difficult to predict change impacts. Changes made to any type of entity are likely to propagate to others. It is necessary to be aware of not only individual change impacts but also complex change propagations and their impacts across entity types. Hence, the overall objective of the research is to develop a framework for modeling changes across multiple entity types in construction projects. The literature review reveals that existing methods lack a structured approach for early change identification and that these methods are limited to predicting changes and their impacts in single entity type only. Certain studies have recognized the need for multi-entity modeling; however, these studies are limited to the classification and generation of propagation paths, and they lack a quantitative approach to quantify change propagations. Further, the exploratory case study reveals that practitioners also find it difficult to predict change impacts because techniques and tools used for the design and construction planning of projects do not facilitate the quantification of change impacts across entity types prior to change implementation. Hence, there is a need for a modeling framework to manage changes proactively. The proposed change-prediction framework integrates two matrix-based modeling methods: axiomatic design (AD) and a multiple domain matrix (MDM). The framework consists of three major segments: 1) identification of changes, 2) the tracking of change propagations, and 3) estimation of change propagation impacts. Initially, relationships between functional requirements and design parameters must be modeled and analyzed using AD to finalize the entity types. When any change in functional requirement is initiated, changes in entity types can be identified in a structured manner. Next, the interrelationships of entity types must be modeled in the MDM to track change propagations. A quantitative approach is proposed to quantify changes in terms of time at parameter level in the MDM. Further, change impacts on other entity types are estimated semi-automatically from the revised durations of parameters in the MDM. An abductive-based case study research method has been adopted to develop the existing theory in change prediction research. The research method is divided into three parts: problem formulation, framework development, and validation. In Part 1, a literature review is conducted to identify research gaps. An exploratory case study was conducted across 19 different projects to investigate the existing practice and identify the root causes of changes. A semi-structured interview was conducted with 67 industry experts to understand the problems on managing changes in the entire construction project life cycle. The research problem is formulated by triangulating the findings of the literature review and the exploratory case study. In Part 2, a change prediction framework is developed based on a comprehensive set of requirements which are identified from the literature review and validated from industry experts. Further, case studies of eight different projects were conducted to explore selected matrix-based modeling methods: AD and the MDM. In Part 3, the proposed framework is validated using data from three ongoing construction projects – multi-story residential apartment, underground metro, and hospital building. The validation reveals that the proposed framework is quite useful in minimizing errors during the implementation of changes. Further, a roadmap for implementing the proposed framework is also presented. Overall, the proposed change prediction framework can aid design and construction stakeholders to identify, schedule and quantify changes proactively across multiple entity types in a construction project.
Item Type: | Thesis (Doctoral) |
---|---|
Uncontrolled Keywords: | duration; residential; construction project; hospital; change management; construction planning; life cycle; productivity; safety; stakeholder; labour productivity; quantification; case study; interview; validation |
Date Deposited: | 16 Apr 2025 19:36 |
Last Modified: | 16 Apr 2025 19:36 |