Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction. Unpublished PhD thesis, Virginia Polytechnic Institute and State University, USA.
Abstract
The three-phase methodology of this dissertation research set out to advance the understanding of change in the AIA A201 and the impact change has had on the value-added benefit of the design professional during the construction phase and contract administration on a project. The results of this research revealed the following primary conclusions: changes to various provisions pertaining to the key provisions have resulted in the Architect assuming less responsibility during the construction phase of a project; changes to the AIA A201 provision concerning the key provisions have not increased the value of the Architect's performance of contract administration services during the construction phase of a project; with regard to the key provisions, Owners or Owners' representatives perceive the value of the Architect's contract administration services during construction have decreased in recent years. In Phase I, this research identified the key contract provisions, which influence the function of the design professional performed in contract administration during construction. This investigation identified that change exists in key provisions over time and that change may have an influence on the function performed by the design professional during construction and contract administration. Subsequently, in Phase II, this research investigated the effect that change has had on the function performed by the design professional. The respective substantive changes to each provision that may have had a material effect on the function of the design professional were identified and these key provisions were thus studied further. Then, whether or not changes made to key provisions of AIA A201 have had a material effect on the function performed by the architect/design professional during the construction phase and contract administration was examined in Phase III. Ultimately, the research led to an enhanced knowledge of the owner-perceived value-added benefit by the design professional during the construction phase of a project. The practical use of the AIA A201 and its future editions has an influence on improved performance and better working relationships, which ultimately leads to improved constructed projects.
Item Type: | Thesis (Doctoral) |
---|---|
Thesis advisor: | Vorster, M C |
Uncontrolled Keywords: | construction phase; contract administration; architect; owner; professional |
Date Deposited: | 16 Apr 2025 19:27 |
Last Modified: | 16 Apr 2025 19:27 |