Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control

Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. Unpublished PhD thesis, University of Texas at Austin, USA.

Abstract

The primary purpose of this research is to develop systematic procedures, quantity models and an automated computing tool for highway estimating process for the Texas Department of Transportation (TxDOT). This study built a preliminary cost estimating system that toggles between project input information, predictive item-level quantity models, and segregated unit prices for highway work items. A computer application and a prototype web-based system both using relational databases were developed. The design concept of this automated system is to better exploit work item historical unit prices and initiate preliminary estimates with quantity-based models for later periodic quantity adjustment. This approach was chosen because of conventional approach lacking of quantity information until 90% to 95% design complete. This cost estimating system enables continuity of item-level quantity tracking as projects evolve to later phases. The output, in the form of a report can be uploaded to the TxDOT Design and Construction Information System for subsequent cost control and management.

Item Type: Thesis (Doctoral)
Thesis advisor: O'Connor, J T
Uncontrolled Keywords: web-based system; highway; pavement; traffic; computing; cost control; estimating; information system
Date Deposited: 16 Apr 2025 19:26