Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Abstract
This paper aims to present the framework for a model that can be used to estimate the production rate, activity duration, total fuel use, and total pollutants emissions from earthwork activities. A case study and sensitivity analysis for an excavator performing excavations are presented. The tool is developed by combining the multiple linear regressions (MLR) approach for modeling the productivity with the EPA's NONROAD model. The excavator data were selected to build the productivity model, and emission factors of all type of pollutants from NONROAD model were used to estimate the total fuel use and emissions. Results indicate that the excavator productivity model had high precision and accuracy, low bias, with trench depth and bucket size are in the model, it can explain 92 per cent variability of productivity rate data, and can be used as the basis for estimating the fuel quantities that will be required and the total expected pollutant emissions for the project. The estimating tool proposed in this paper will be an effective means for assessing the fuel consumptions and air emissions of earthwork activities and will allow equipment owners or fleet managers, policy makers, and project stakeholders to evaluate their construction projects. The tool will help the contractors to estimate the fuel quantities and pollutant emissions, which would be valuable information for a preliminary environmental assessment of the project. Although there are already methods and models for estimating productivity rate and emissions for heavy duty diesel (HDD) construction equipment, there currently is not a means for doing all of these at once.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | air emissions; construction equipment; earthwork; fuel consumption; fuel use; productivity; productivity rate |
Date Deposited: | 12 Apr 2025 18:43 |
Last Modified: | 12 Apr 2025 18:43 |