Two-stage scheduling model for resource leveling of linear projects

Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7), ISSN 0733-9364

Abstract

In recent times, linear project resource leveling based on the linear scheduling method (LSM) has attracted considerable interest owing to the unique advantages of applying the LSM to linear projects. In the research reported in this paper, the linear project resource leveling problem was described as a constraint satisfaction problem based on analyses conducted in previous studies and a two-stage scheduling model for resource leveling of linear projects based on the LSM was proposed. The optimization process was reasonably set so as to fully utilize the rate float of the activity to obtain a more optimal schedule. The constraint programming (CP) technique was used for solving this problem. Based on the proposed scheduling model and algorithm, a two-stage scheduling system for resource leveling of linear projects was developed for automatically establishing a linear schedule for resource leveling. The effectiveness of the proposed model and algorithm was verified for a highway construction project reported previously.

Item Type: Article
Uncontrolled Keywords: constraint programming; cost and schedule; linear projects; linear scheduling method; resource leveling
Date Deposited: 11 Apr 2025 19:45
Last Modified: 11 Apr 2025 19:45