Abdel-Monem, M and Hegazy, T (2013) Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139(7), pp. 895-898. ISSN 0733-9364
Abstract
This paper utilizes interactive voice response (IVR) technology to enhance progress tracking of projects and as-built documentation. First, possible site events and tracking needs of construction activities have been analyzed based on literature and sample daily progress forms. Accordingly, activity logical-flow diagrams have been developed to guide IVR sessions. Afterward, the IVR technology has been implemented to enhance an existing e-mail-based framework for as-built documentation by integrating a cloud-based IVR service and a customized scheduling application. The IVR features work by either receiving calls from supervisors at any time or by configuring eligible activities to automatically initiate calls to their supervisors. Compared with lengthy e-mails, the IVR sessions are interactive, minimize the questions asked, and allow supervisors to specify site events and any requests for information. Responses are also received instantaneously to update the schedule and visualize the latest as-built information directly on the daily segments of a schedule. The paper contributes to automating site-data collection, designing low-cost voice applications for construction, facilitating bidirectional communication between site personnel and head office, and enhancing project tracking and control.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | as-built; computer application; e-mail; interactive voice response; progress tracking; project control; voice |
Date Deposited: | 11 Apr 2025 19:44 |
Last Modified: | 11 Apr 2025 19:44 |