Fisher, A D and Robitaille, A M (2011) Replacement of the movable span of the Thames River Bridge: How 19th century technology impacted 21st century construction. Journal of Construction Engineering and Management, 137, pp. 895-900. ISSN 0733-9364
Abstract
The replacement of the Thames River Railroad Bridge between Groton and New London, Connecticut, was a challenging task on many levels, some of them anticipated, some of them not. The effort culminated with an outage that stopped the most heavily used passenger rail service in the United States for 4days and blocked navigation for industrial and national defense waterway users. Unanticipated foundation problems added an additional set of challenges. All challenges were successfully overcome with a spirit of cooperation and innovation by all involved. Advances in information technology after completion of the project led to the discovery of lost information that could have warned the project team of problems to come had that knowledge been available at the start of the project.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | bascule; bridge; lift; open-well caisson; railroad |
Date Deposited: | 11 Apr 2025 19:44 |
Last Modified: | 11 Apr 2025 19:44 |