Bayraktar, M E; Hastak, M; Gokhale, S and Safi, B (2011) Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects. Journal of Construction Engineering and Management, 137(9), pp. 645-655. ISSN 0733-9364
Abstract
Projects must meet budget, schedule, safety, and quality goals to be regarded as a success. Many factors come into play, and many decisions are made that influence a project's outcome. Today, owners are often faced with deciding between an execution strategy that emphasizes either project cost or project schedule. Such a decision may be made not once, but throughout the life of the project. Project teams, when required by the owner to make a cost-schedule trade-off, generate common sense ideas, best practices, and other means of achieving the desired trade-off through brainstorming sessions. This paper offers a tool for systematically identifying the techniques which are most effective in achieving the trade-off goal. Project teams can then use these techniques in a timely fashion to increase the likelihood of project success.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | decision support systems; project management |
Date Deposited: | 11 Apr 2025 19:43 |
Last Modified: | 11 Apr 2025 19:43 |