Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor

Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364

Abstract

In a typical construction project, a contractor may often find that the time originally allotted to perform the work has been severely reduced. The reduction of time available to complete a project is commonly known throughout the construction industry as schedule compression. Schedule compression negatively impacts labor productivity and consequently becomes a source of dispute between owners and contractors. This paper examines how schedule compression affects construction labor productivity and provides a model quantifying the impact of schedule compression on labor productivity based on data collected from 66 mechanical and 37 sheet metal projects across the United States. The model can be used in a proactive manner to reduce productivity losses by managing the factors affecting productivity under the situation of schedule compression. Another useful application of the model is its use as a litigation avoidance tool after the completion of a project.

Item Type: Article
Uncontrolled Keywords: contractors; labors; metals; productivity; sheets
Date Deposited: 11 Apr 2025 19:42
Last Modified: 11 Apr 2025 19:42