Modified but-for method for delay analysis

Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364

Abstract

"But-for" is a widely used method for analyzing and apportioning project delays among the responsible parties. Despite its acceptability, the traditional but-for method suffers from serious drawbacks; namely its narrow focus on the point of view of a single party and its inability to accurately consider concurrent delays. In this technical note, several improvements have been made to the but-for method to produce repeatable results and to account for concurrent delays. Details of the modified but-for (MBF) method are provided along with an example to demonstrate its advantages. To automate the MBF method, it has been coded in a macro program on commercial project management software. The method is simple and can help practitioners in apportioning project delays in an accurate and equitable manner.

Item Type: Article
Uncontrolled Keywords: claims; computer applications; delay time
Date Deposited: 11 Apr 2025 19:42
Last Modified: 11 Apr 2025 19:42