Harmon, K M J (2003) Effectiveness of dispute review boards. Journal of Construction Engineering and Management, 129(6), pp. 674-679. ISSN 0733-9364
Official URL: http://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(...
Abstract
A Dispute Review Board (DRB) is a panel of three respected, experienced industry professionals jointly selected by the owner and contractor of a project and established at the beginning of a construction project. It meets regularly at the job site to be briefed on the work, the schedule, and any potential issues in dispute. With the use of DRB growing, a pilot study was undertaken to determine the attitudes of industry members concerning its effectiveness in preventing and contemporaneously resolving disputes.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | contractors; dispute resolution |
Date Deposited: | 11 Apr 2025 19:41 |
Last Modified: | 11 Apr 2025 19:41 |