Ibbs, C W; Bates, L C and Echeverry, D (1987) Owner-furnished equipment (OFE) contract practices. Journal of Construction Engineering and Management, 113(2), pp. 249-263. ISSN 0733-9364
Abstract
Owner-furnished Equipment (OFE) procurement is a contract administration technique utilized on many construction projects to save costs and time. Presently, little is known factually about the specific tactics that contribute to a successful OFE procurement, or what the magnitude of those benefits may be. This article presents the results of a comprehensive research study of OFE practices, problems, and benefits. Fifty-five OFE construction projects are analyzed, allowing a series of conclusions and recommendations to be developed. The major points examined include: Characteristics of typical OFE projects and products; the quantified extent of project benefits and costs realized; the likelihood and consequences of related contract disputes; effective contract monitoring strategies; and whether owners or third-party contract administrators should manage the supply contract.
Item Type: | Article |
---|---|
Date Deposited: | 11 Apr 2025 19:38 |
Last Modified: | 11 Apr 2025 19:38 |