Tavakoli, A (1986) Transient response analysis of a dual cycle system. Journal of Construction Engineering and Management, 112(3), pp. 403-410. ISSN 0733-9364
Official URL: http://doi.org/10.1061/(ASCE)0733-9364(1986)112:3(...
Abstract
The increasing competition in the construction industry today not only calls for lower bid prices but for accurate estimates as well. Therefore, a contractor must continuously strive to improve his or her estimating techniques. A computer simulation which can be used to estimate the loss in efficiency that results when a dual cycle system is being started up each shift is presented. It does this by using the CYCLONE simulation model for several different simulated cases.