Singh, S; Chinyio, E and Suresh, S (2023) The key enablers, techniques and benefits of managing stakeholders within BIM supported projects. Journal of Engineering, Design and Technology, 21(2), pp. 469-485. ISSN 1726-0531
Abstract
Purpose: Project managers still face challenges with managing stakeholders. Using building information modelling (BIM) has further increased these challenges. Meanwhile, there is a paucity of research specifically focussing on the techniques which organisations are adopting to manage stakeholders within BIM-implemented projects and the associated benefits which they can reap. Thus, this paper aims to identify the key techniques, enablers and benefits of managing stakeholders within BIM-implemented projects. Design/methodology/approach: An exploratory approach was adopted due to the paucity of the variables on the topic. In total, 23 semi-structured interviews were conducted in the UK through purposive and snowball sampling. The data was analysed using content analysis and the “NVivo 11 Pro” software. Findings: Two key techniques and two enablers required to manage stakeholders within BIM-implemented projects were identified. Nine benefits of managing stakeholders were identified which split into interim and eventual benefits. Originality: This paper provides a richer understanding of the enablers and techniques which organisations should focus on while strategising for minimum resistance from stakeholders in their BIM implemented projects.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | benefits; BIM; construction projects; enablers; stakeholder management; techniques |
Date Deposited: | 11 Apr 2025 17:38 |
Last Modified: | 11 Apr 2025 17:38 |