Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), pp. 1668-1678. ISSN 1562-3599
Abstract
Determining productivity targets based on actual potential for productivity improvement; is essential for fostering continuous improvement. Developing realistic and work specific productivity targets has proven a huge challenge in on-site construction. The present research exemplifies how work measurement techniques can be used to identify improvement potential and develop such targets. Two work measurement techniques; work sampling and continuous time study have been applied during a five day period, where the installation of prefabricated concrete elements have been observed at a single project case. The study revealed high fluctuations in daily utilization and productivity rates; moreover, a strong relationship between direct work and productivity at work task level were identified (R2 =.827). Additionally, four managerial strategies for improving productivity were identified: (1) Enhance production start and stops; (2) improve flows; (3) optimize utilization of manning and avoid absenteeism; (4) shield the production from weather. To develop a realistic productivity target, the observed productivity day-curves have been modified, by adjusting for effects of variation and declines in productivity, revealing an improvement potential of 19.4%. The present study demonstrates how realistic productivity targets can be developed to support managers' and managerial decisions and thus act as a starting point for continuous improvement.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | continuous improvement; continuous time; goal setting; productivity targets; work sampling |
Date Deposited: | 11 Apr 2025 16:44 |
Last Modified: | 11 Apr 2025 16:44 |