Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W. (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Abstract
The success of design and build (D&B) projects requires the support and use of appropriate contract conditions. The effectiveness of D&B conditions of contract in achieving the desired objectives were evaluated. It was found that respondents from the private sector were more satisfied with the performance of the conditions of contract, an unexpected result as it was the public sector that promoted the use of design and build procurement strategy. Out of the five contract objectives as described in this paper, single point of responsibility was considered highly achievable through the use D&B of conditions of contract. Enhancing buildability and financial stability were considered as moderately achieved. Shortening of project duration and minimizing disputes were considered as moderately achieved. One of the recommendations resulted from the study is to extend the role of professional independent checker to include both quality assurance as well as cost saving monitor.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | contract; design and build; project management |
Date Deposited: | 11 Apr 2025 12:24 |
Last Modified: | 11 Apr 2025 12:24 |