Simultaneous multi-criteria optimization for scheduling linear infrastructure projects

Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599

Abstract

This paper presents a simultaneous multi-criteria optimization approach for scheduling linear infrastructure projects. The proposed model provides planners with sets of non-dominated alternatives and their corresponding tradeoffs. The associated research methodology includes: (1) developing a resource driven scheduling module; (2) applying a multi-criteria optimization technique to optimize the multi-objective scheduling problem; (3) integrating the proposed model with a commercial project management software; and (4) applying the developed model on two literature-drawn case studies. The developed multi-criteria optimization approach utilizes Genetic Algorithms and Pareto Front sorting. The resulting sets of schedules are based on the multiple inter-conflicting objectives of simultaneously minimizing project duration, minimizing cost, minimizing interruptions, and minimizing unit delivery delays. The results indicate that the proposed approach can explore a greater range of solutions compared to existing models. The developed multi-criteria optimization approach can aid planners with proposing optimal set of schedules.

Item Type: Article
Uncontrolled Keywords: decision analysis; multi-criteria optimization; repetitive; schedules
Date Deposited: 11 Apr 2025 16:42
Last Modified: 11 Apr 2025 16:42